Laserfiche WebLink
City of Santa Ana <br />Permit Counter: (7 1 41 647 -5800 <br />20 Civic Center Plaza (M-19), Santa Ana, CA92702 Electrical Permit #: 2Ot 66158 <br />Pin #: 6{6OElnspection Requests: (714) 667-2738 lnspector Section: (714) 647-5853 <br />Unil; <br />Block: NA <br />Bldg: Address Range: <br />Tract: KUFFEL & FLETCHEistoric: No <br />Suite Range: <br />Zoning: O <br />E <br />Lot: NA <br />Owner: <br />Address: <br />SCHOOL SANTA ANA HIGH DIST <br />1405 FRENCH ST <br />Santa Ana, CA 927012414 <br />Feo Type <br />01116002 51603 FWU <br />011'16002 51600 General Plan Update <br />01 'l 16002 51603 lssuance <br />Amount <br />23.87 <br />21.25 <br />52.98 <br />Qty <br />1.00 <br />1.00 <br />1.00 <br />Fee <br />$23.87 <br />$21.2s <br />$s2.98Phone: <br />Tenant Name:Valley HS Soccer <br />Orflner-Builder <br />Phone <br />State Lic #: <br />Lic Type: <br />Bus. Lic #: <br />Woriers' Compensation lnsurance <br />Carrier: <br />Policy #: <br />Expires: <br />Building Use; <br />Job Type: <br />Nature of Work: <br />Other <br />Miscellaneous <br />Fireworks Stand <br />Occupancy: <br />Constr Type <br />Code: <br />N/A <br />N/A <br />cEc 2016 Notes: Handout givenffees pd in full on M-7lll0 <br />Planning conditions: <br />Planning Approval By <br />Plan Checked By: <br />Permit lssued By: <br />Subjecl to Field: <br />Building Permit #: <br />Link, Patricia <br />Date <br />Date <br />Date 06/13/2018 <br />Account# <br />Misc. Receipt: 71'l'lO <br />Misc. Receipt: <br />Misc. Receipt: <br />Total <br />$98.10 <br />$98.10 <br />$0.00 <br />lnspector MID#: 2018-143968 <br />N/A No Balance Fee Total: <br />Paid to Date: <br />Balance Due: <br />Project Address: 1801 S Greenville St <br />Assessor'sParcel: 408-301.01 <br />Contractor: <br />Address: <br />Every pennit issued shal becone invalid unless the wo* on lhe site <br />authorizad by such pemil is commenced within 180 days aftet its <br />issuance, or if the wod< authoized on the site by such permit is suspendod <br />or dbandoned for a peiod of 180 days aftar tho time the wotu is <br />commenced.