Laserfiche WebLink
1 HOUSE PHOTO PV-0 SCALE: NTS <br />COVER PAGE <br />PROJECT SITE <br />SHEET NAME <br />SHEET SIZE <br />SHEET NUMBER <br />ANSI B <br />11" X 17" <br />PROJECT NAME & ADDRESS <br />PV-0 <br />DATE: 04/11/2024 <br />54 <br />2 <br /> <br />E <br /> <br />C <br />E <br />N <br />T <br />R <br />A <br />L <br /> <br />A <br />V <br />E <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />OL <br />G <br /> <br />- <br /> <br />D <br />E <br />L <br />H <br />I <br />Signature with Seal <br />REVDATE DESCRIPTION <br />REVISIONS <br />(02) APS QT2 -208 3-PHASE (208V) <br />SYSTEM INFO. <br />(06) HANWHA Q.CELLS: Q.PEAK DUO <br />L-G8.3/BFG 420W <br />DC SYSTEM SIZE: 2.52 KWDC <br />AC SYSTEM SIZE: 3.46 KWAC <br />SPECTRA POWER SYSTEMS <br />ADDRESS.:- 27892 CALLE SAN REMO, <br />SAN JUAN CAPISTRANO, CA 92675 <br />CONTACT NAME: KEN RILEY <br />LICENSE NO.: #1063909 <br />LICENSE CLASS.: C-10 <br />KENR@SPECTRA-POWER.COM <br />PHONE NO.: 7608159405 <br />CONTRACTOR INFORMATION <br />B02/02/2024 AHJ REQUESTED <br />PDF FORM FILLED <br />SHEET INDEX <br />PV-0 COVER PAGE <br />PV-1 SITE PLAN <br />PV-2 ROOF PLAN & MODULES <br />PV-2A STRING LAYOUT & BOM <br />PV-3 ATTACHMENT DETAILS <br />PV-4 ELECTRICAL LINE DIAGRAM & CALCS. <br />PV-4A SPECIFICATIONS & CALCULATION <br />PV-5 SIGNAGE <br />PV-6+EQUIPMENT SPECIFICATIONS <br />SCOPE OF WORK: <br />TO INSTALL A ROOF MOUNTED SOLAR PHOTOVOLTAIC SYSTEM AT THE OWNER PROPERTY <br />LOCATED AT 542 E CENTRAL AVE, SANTA ANA, CA 92707 <br />THE POWER GENERATED BY THE PV SYSTEM WILL BE INTERCONCECTED WITH THE UTILITY <br />GRID THROUGH THE EXISTING ELECTRICAL SERVICE EQUIPMENT. <br />GENERAL NOTES: <br />· THESE CONSTRUCTION DOCUMENTS HAVE BEEN BASED ON FIELD INSPECTIONS AND <br />OTHER INFORMATION AVAILABLE AT THE TIME. ACTUAL FIELD CONDITIONS MAY REQUIRE <br />MODIFICATIONS IN CONSTRUCTION DETAILS. <br />· ARCHITECT HAS NOT BEEN RETAINED TO SUPERVISE ANY CONSTRUCTION OR <br />INSTALLATION OF ANY EQUIPMENT AT SITE. <br />· CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TOOLS, OBTAINS ALL <br />PERMITS, LICENSES AND PAY ALL REQUIRED FEES AND COMPLETE INSTALLATION. <br />· CONTRACTOR HAS THE FULL RESPONSIBILITY TO CHECK AND VERIFY ALL DIMENSIONS <br />AND EXISTING CONDITIONS. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER <br />BEFORE PROCEEDING WITH THE WORK. ANY WORK STARTED BEFORE CONSULTATION <br />AND ACCEPTANCE BY THE ENGINEER SHALL BE THE SOLE RESPONSIBILITY OF THE <br />CONTRACTOR AND SHALL BE SUBJECT TO CORRECTION BY THEM WITHOUT ADDITIONAL <br />COMPENSATION. <br />· DAMAGE CAUSED TO THE EXISTING STRUCTURE, PIPES, DUCTS, WINDOWS, WALL, <br />FLOORS, ETC. SHALL BE REPAIRED TO THE ORIGINAL CONDITION OR REPLACED BY THE <br />CONTRACTOR AT NO ADDITIONAL COST. <br />· THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE PROPER INSTALLATION AND <br />COMPLETION OF THE WORK WITH APPROVED MATERIALS. <br />· NO CHANGES ARE TO BE MADE WITHOUT THE CONSULTATION AND APPROVAL OF THE <br />ARCHITECT. <br />· CONTRACTOR SHALL OBTAIN BULDING PERMIT. NO WORK TO START UNLESS BUILDING <br />PERMIT IS PROPERLY DISPLAYED. <br />· ALL WORKMANSHIP AND MATERIALS SHALL BE OF FIRST QUALITY AND IN COMPLIANCE <br />WITH THE REQUIREMENTS OF THE CA BUILDING CODE, THE DEPARTMENT OF <br />ENVIRONMENTAL PROTECTION AND ALL PERTINENT AGENCIES. <br />· IT IS ESSENTIAL THAT ALL WORK PROCEED WITH THE MAXIMUM COOPERATION OF ALL <br />PARTIES AND WITH MINIMUM INTERFERENCE TO THE OCCUPANTS WITHIN THE BUILDING. <br />THE OWNER'S DIRECTIONS IN THIS REGARD SHALL BE FULLY COMPLIED WITH. <br />· ALL EXPOSED PLUMBING, HVAC, ELECTRICAL DUCTWORK, PIPING AND CONDUITS ARE TO <br />BE PAINTED BY GENERAL CONTRACTOR. <br />· THE CONTRACTOR SHALL PERFORM THE WORK IN STRICT CONFORMANCE WITH THE <br />LOCAL LAWS, REGULATIONS AND THE NATIONAL ELECTRIC CODE. <br />· THE CONTRACTOR SHALL OBTAIN ALL PERMITS, APPROVALS, AFFIDAVITS, <br />CERTIFICATIONS, ETC. AND PAY ALL FEES AS REQUIRED BY THE LOCAL AUTHORITIES. <br />·CONTRACTORS SHALL OBTAIN FIRE CERTIF. UPON COMPLETION OF WORK. <br />·THE PV SYSTEM MUST BE INSTALLED AND APPROVED PRIOR TO FINAL APPROVAL OF THE <br />BUILDING TO MEET THE REQUIREMENTS OF CAEC 150.1(C)(14). <br />ELECTRICAL NOTES: <br />· THE EQUIPMENT AND ALL ASSOCIATED WIRING AND INTERCONCECTION SHALL BE INSTALLED ONLY BY QUALIFIED PEOPLE. A QUALIFIED PERSON IS <br />ONE WHO HAS SKILLS AND KNOWLEDGE RELATED TO THE CONSTRUCTION AND OPERATION OF THE ELECTRICAL EQUIPMENT AND INSTALLATIONS <br />AND HAS RECIEVED SAFETY TRAINING TO RECOGNIZE AND AVOID THE HAZARDS INVOLVED. (CEC 690.4(E) AND 705.6) <br />· LOCAL UTILITY PROVIDER SHALL BE NOTIFIED PRIOR TO USE AND ACTIVATION OF ANY SOLAR PHOTOVOLTAIC INSTALLATION. FOR A LINE SIDE TAP <br />CONCECTION, UTILITY NEEDS TO BE NOTIFIED WELL IN ADVANCE TO COORDINATE BUILDING ELECTRICAL SHUT OFF. <br />· NEW CONDUIT ROUTING SHOWN IS ESSENTIALLY SCHEMATIC. SUBCONTRACTOR SHALL LAY OUT RUNS TO SUIT FIELD CONDITIONS AND THE <br />COORDINATION REQUIREMENTS OF OTHER TRADES. <br />·ARRAY WIRING SHOULD NOT BE READILY ACCESSIBLE EXCEPT TO QUALIFIED PERSONNEL. <br />·ALL EXTERIOR CONDUIT, FITTINGS, AND BOXES SHALL BE WATERTIGHT AND APPROVED FOR USE IN WET LOCATIONS. (CEC 314.15A). <br />·WIRING METHODS FOR PV SYSTEM CONDUCTORS AREN'T PERMITTED WITHIN 10 IN. OF THE ROOF DECKING OR SHEATHING EXCEPT WHERE LOCATED <br />DIRECTLY BELOW THE ROOF SURFACE THAT'S COVERED BY PV MODULES AND ASSOCIATED EQUIPMENT WIRING <br />·BACK-FED BREAKER MUST BE AT THE OPPOSITE END OF BUS BAR FROM THE MAIN BREAKER OR MAIN LUG SUPPLYING CURRENT FROM THE UTILITIES. <br />·ALL CONDUCTORS AND WIRE TIES EXPOSED TO SUNLIGHT ARE LISTED AS UV RESISTANT. <br />·CONTRACTOR SHALL FOLLOW ALL ELECTRICAL EQUIPMENT LABELING REQUIREMENTS IN CEC 690 AND CFC 2022 <br />·PV SOURCE, OUTPUT AND INVERTER CIRCUITS SHALL BE IDENTIFIED AT ALL POINTS OF TERMINATION, CONCECTION, AND SPLICES. THE MEANS OF ID <br />CAN BE SEPARATE COLOR CODING, MARKING TAPE, TAGGING ETC. (CEC 690.4). <br />· MEASURE THE LINE-TO-LINE AND LINE-TO-NEUTRAL VOLTAGE OF ALL SERVICE ENTRANCE CONDUCTORS PROIR TO INSTALLING ANY SOLAR <br />EQUIPMENT. THE VOLTAGES FOR THE 208VAC RATED. <br />WIRING AND CONDUIT NOTES: <br />· ALL CONDUIT SIZES AND TYPES, SHALL BE LISTED FOR ITS <br />PURPOSE AND APPROVED FOR THE SITE APPLICATIONS <br />· ALL PV CABLES AND HOMERUN WIRES BE #10AWG *USE-2, PV <br />WIRE, OR PROPRIETARY SOLAR CABLING SPECIFIED BY MFR, <br />OR EQUIVALENT; ROUTED TO SOURCE CIRCUIT COMBINER <br />BOXES AS REQUIRED <br />· ALL CONDUCTORS AND OCPD SIZES AND TYPES SPECIFIED <br />ACCORDING TO [CEC 690.8 (A)(1) & (B)(1)], [CEC 240] [CEC <br />690.7] FOR MULTIPLE CONDUCTORS <br />· ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT <br />SHALL BE DERATED ACCORDING TO [CEC TABLE 310.15 <br />(B)(2)(C)] BLACK ONLY** <br />· EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE-2, 90°C <br />RATED, WET AND UV RESISTANT, AND UL LISTED RATED FOR <br />600V, UV RATED SPIRAL WRAP SHALL BE USED TO PROTECT <br />WIRE FROM SHARP EDGES <br />· PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED <br />THHN/THWN-2 INSULATED, 90°C RATED, WET AND UV <br />RESISTANT, RATED FOR 600V PER CEC 2008 OR 1000V PER <br />CEC 2011 <br />· 4-WIRE DELTA CONCECTED SYSTEMS HAVE THE PHASE WITH <br />THE HIGHER VOLTAGE TO GROUND MARKED ORANGE OR <br />IDENTIFIED BY OTHER EFFECTIVE MEANS <br />· ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE <br />CIRCUIT PROTECTION <br />·VOLTAGE DROP LIMITED TO 2% <br />·AC CONDUCTORS >4AWG COLOR CODED OR MARKED: PHASE <br />A OR L1- BLACK, PHASE B OR L2- RED, PHASE C OR L3- BLUE, <br />NEUTRAL- WHITE/GRAY <br />2 VICINITY MAP PV-0 SCALE: NTS <br />GOVERNING CODES <br />2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA FIRE CODE <br />2022 CALIFORNIA PLUMBING CODE <br />2022 CALIFORNIA MECHANICAL CODE <br />2022 CALIFORNIA ENERGY CODE <br />2022 CALIFORNIA RESIDENTIAL CODE <br />2022 CALIFORNIA ADMINISTRATIVE CODE <br />EQUIPMENT SUMMARY <br />06 HANWHA Q.CELLS: Q.PEAK DUO L-G8.3/BFG 420W MODULES <br />02 APS QT2 -208 3-PHASE (208V) MICRO-INVERTERS <br />SYSTEM RATING <br />2.520 KWDC <br />3.456 KWAC <br />PROJECT SITE <br />PROJECT SITE <br />Bldg#: 101118106 <br />Elec#: 20181990 <br /> <br />Approvals: <br />Bldg: KAhangian <br />Elec: MSmith <br />Plng: CSantana <br />The scope of the plans is for <br />the installation of the solar <br />photovoltaic system only <br />and the approval is subject <br />to compliance with all <br />applicable city and state <br />codes and regulations <br />regarding construction. The <br />approval of the plans does <br />not constitute any <br />certification of the accuracy, <br />completeness, or building <br />permit status of the existing <br />buildings and structures as <br />shown. <br />542 E Central Ave - 101118106 & <br />20181990 <br />4/25/2024