1 HOUSE PHOTO PV-0 SCALE: NTS
<br />COVER PAGE
<br />PROJECT SITE
<br />SHEET NAME
<br />SHEET SIZE
<br />SHEET NUMBER
<br />ANSI B
<br />11" X 17"
<br />PROJECT NAME & ADDRESS
<br />PV-0
<br />DATE: 04/11/2024
<br />54
<br />2
<br />
<br />E
<br />
<br />C
<br />E
<br />N
<br />T
<br />R
<br />A
<br />L
<br />
<br />A
<br />V
<br />E
<br />SA
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />7
<br />0
<br />7
<br />OL
<br />G
<br />
<br />-
<br />
<br />D
<br />E
<br />L
<br />H
<br />I
<br />Signature with Seal
<br />REVDATE DESCRIPTION
<br />REVISIONS
<br />(02) APS QT2 -208 3-PHASE (208V)
<br />SYSTEM INFO.
<br />(06) HANWHA Q.CELLS: Q.PEAK DUO
<br />L-G8.3/BFG 420W
<br />DC SYSTEM SIZE: 2.52 KWDC
<br />AC SYSTEM SIZE: 3.46 KWAC
<br />SPECTRA POWER SYSTEMS
<br />ADDRESS.:- 27892 CALLE SAN REMO,
<br />SAN JUAN CAPISTRANO, CA 92675
<br />CONTACT NAME: KEN RILEY
<br />LICENSE NO.: #1063909
<br />LICENSE CLASS.: C-10
<br />KENR@SPECTRA-POWER.COM
<br />PHONE NO.: 7608159405
<br />CONTRACTOR INFORMATION
<br />B02/02/2024 AHJ REQUESTED
<br />PDF FORM FILLED
<br />SHEET INDEX
<br />PV-0 COVER PAGE
<br />PV-1 SITE PLAN
<br />PV-2 ROOF PLAN & MODULES
<br />PV-2A STRING LAYOUT & BOM
<br />PV-3 ATTACHMENT DETAILS
<br />PV-4 ELECTRICAL LINE DIAGRAM & CALCS.
<br />PV-4A SPECIFICATIONS & CALCULATION
<br />PV-5 SIGNAGE
<br />PV-6+EQUIPMENT SPECIFICATIONS
<br />SCOPE OF WORK:
<br />TO INSTALL A ROOF MOUNTED SOLAR PHOTOVOLTAIC SYSTEM AT THE OWNER PROPERTY
<br />LOCATED AT 542 E CENTRAL AVE, SANTA ANA, CA 92707
<br />THE POWER GENERATED BY THE PV SYSTEM WILL BE INTERCONCECTED WITH THE UTILITY
<br />GRID THROUGH THE EXISTING ELECTRICAL SERVICE EQUIPMENT.
<br />GENERAL NOTES:
<br />· THESE CONSTRUCTION DOCUMENTS HAVE BEEN BASED ON FIELD INSPECTIONS AND
<br />OTHER INFORMATION AVAILABLE AT THE TIME. ACTUAL FIELD CONDITIONS MAY REQUIRE
<br />MODIFICATIONS IN CONSTRUCTION DETAILS.
<br />· ARCHITECT HAS NOT BEEN RETAINED TO SUPERVISE ANY CONSTRUCTION OR
<br />INSTALLATION OF ANY EQUIPMENT AT SITE.
<br />· CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TOOLS, OBTAINS ALL
<br />PERMITS, LICENSES AND PAY ALL REQUIRED FEES AND COMPLETE INSTALLATION.
<br />· CONTRACTOR HAS THE FULL RESPONSIBILITY TO CHECK AND VERIFY ALL DIMENSIONS
<br />AND EXISTING CONDITIONS. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER
<br />BEFORE PROCEEDING WITH THE WORK. ANY WORK STARTED BEFORE CONSULTATION
<br />AND ACCEPTANCE BY THE ENGINEER SHALL BE THE SOLE RESPONSIBILITY OF THE
<br />CONTRACTOR AND SHALL BE SUBJECT TO CORRECTION BY THEM WITHOUT ADDITIONAL
<br />COMPENSATION.
<br />· DAMAGE CAUSED TO THE EXISTING STRUCTURE, PIPES, DUCTS, WINDOWS, WALL,
<br />FLOORS, ETC. SHALL BE REPAIRED TO THE ORIGINAL CONDITION OR REPLACED BY THE
<br />CONTRACTOR AT NO ADDITIONAL COST.
<br />· THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE PROPER INSTALLATION AND
<br />COMPLETION OF THE WORK WITH APPROVED MATERIALS.
<br />· NO CHANGES ARE TO BE MADE WITHOUT THE CONSULTATION AND APPROVAL OF THE
<br />ARCHITECT.
<br />· CONTRACTOR SHALL OBTAIN BULDING PERMIT. NO WORK TO START UNLESS BUILDING
<br />PERMIT IS PROPERLY DISPLAYED.
<br />· ALL WORKMANSHIP AND MATERIALS SHALL BE OF FIRST QUALITY AND IN COMPLIANCE
<br />WITH THE REQUIREMENTS OF THE CA BUILDING CODE, THE DEPARTMENT OF
<br />ENVIRONMENTAL PROTECTION AND ALL PERTINENT AGENCIES.
<br />· IT IS ESSENTIAL THAT ALL WORK PROCEED WITH THE MAXIMUM COOPERATION OF ALL
<br />PARTIES AND WITH MINIMUM INTERFERENCE TO THE OCCUPANTS WITHIN THE BUILDING.
<br />THE OWNER'S DIRECTIONS IN THIS REGARD SHALL BE FULLY COMPLIED WITH.
<br />· ALL EXPOSED PLUMBING, HVAC, ELECTRICAL DUCTWORK, PIPING AND CONDUITS ARE TO
<br />BE PAINTED BY GENERAL CONTRACTOR.
<br />· THE CONTRACTOR SHALL PERFORM THE WORK IN STRICT CONFORMANCE WITH THE
<br />LOCAL LAWS, REGULATIONS AND THE NATIONAL ELECTRIC CODE.
<br />· THE CONTRACTOR SHALL OBTAIN ALL PERMITS, APPROVALS, AFFIDAVITS,
<br />CERTIFICATIONS, ETC. AND PAY ALL FEES AS REQUIRED BY THE LOCAL AUTHORITIES.
<br />·CONTRACTORS SHALL OBTAIN FIRE CERTIF. UPON COMPLETION OF WORK.
<br />·THE PV SYSTEM MUST BE INSTALLED AND APPROVED PRIOR TO FINAL APPROVAL OF THE
<br />BUILDING TO MEET THE REQUIREMENTS OF CAEC 150.1(C)(14).
<br />ELECTRICAL NOTES:
<br />· THE EQUIPMENT AND ALL ASSOCIATED WIRING AND INTERCONCECTION SHALL BE INSTALLED ONLY BY QUALIFIED PEOPLE. A QUALIFIED PERSON IS
<br />ONE WHO HAS SKILLS AND KNOWLEDGE RELATED TO THE CONSTRUCTION AND OPERATION OF THE ELECTRICAL EQUIPMENT AND INSTALLATIONS
<br />AND HAS RECIEVED SAFETY TRAINING TO RECOGNIZE AND AVOID THE HAZARDS INVOLVED. (CEC 690.4(E) AND 705.6)
<br />· LOCAL UTILITY PROVIDER SHALL BE NOTIFIED PRIOR TO USE AND ACTIVATION OF ANY SOLAR PHOTOVOLTAIC INSTALLATION. FOR A LINE SIDE TAP
<br />CONCECTION, UTILITY NEEDS TO BE NOTIFIED WELL IN ADVANCE TO COORDINATE BUILDING ELECTRICAL SHUT OFF.
<br />· NEW CONDUIT ROUTING SHOWN IS ESSENTIALLY SCHEMATIC. SUBCONTRACTOR SHALL LAY OUT RUNS TO SUIT FIELD CONDITIONS AND THE
<br />COORDINATION REQUIREMENTS OF OTHER TRADES.
<br />·ARRAY WIRING SHOULD NOT BE READILY ACCESSIBLE EXCEPT TO QUALIFIED PERSONNEL.
<br />·ALL EXTERIOR CONDUIT, FITTINGS, AND BOXES SHALL BE WATERTIGHT AND APPROVED FOR USE IN WET LOCATIONS. (CEC 314.15A).
<br />·WIRING METHODS FOR PV SYSTEM CONDUCTORS AREN'T PERMITTED WITHIN 10 IN. OF THE ROOF DECKING OR SHEATHING EXCEPT WHERE LOCATED
<br />DIRECTLY BELOW THE ROOF SURFACE THAT'S COVERED BY PV MODULES AND ASSOCIATED EQUIPMENT WIRING
<br />·BACK-FED BREAKER MUST BE AT THE OPPOSITE END OF BUS BAR FROM THE MAIN BREAKER OR MAIN LUG SUPPLYING CURRENT FROM THE UTILITIES.
<br />·ALL CONDUCTORS AND WIRE TIES EXPOSED TO SUNLIGHT ARE LISTED AS UV RESISTANT.
<br />·CONTRACTOR SHALL FOLLOW ALL ELECTRICAL EQUIPMENT LABELING REQUIREMENTS IN CEC 690 AND CFC 2022
<br />·PV SOURCE, OUTPUT AND INVERTER CIRCUITS SHALL BE IDENTIFIED AT ALL POINTS OF TERMINATION, CONCECTION, AND SPLICES. THE MEANS OF ID
<br />CAN BE SEPARATE COLOR CODING, MARKING TAPE, TAGGING ETC. (CEC 690.4).
<br />· MEASURE THE LINE-TO-LINE AND LINE-TO-NEUTRAL VOLTAGE OF ALL SERVICE ENTRANCE CONDUCTORS PROIR TO INSTALLING ANY SOLAR
<br />EQUIPMENT. THE VOLTAGES FOR THE 208VAC RATED.
<br />WIRING AND CONDUIT NOTES:
<br />· ALL CONDUIT SIZES AND TYPES, SHALL BE LISTED FOR ITS
<br />PURPOSE AND APPROVED FOR THE SITE APPLICATIONS
<br />· ALL PV CABLES AND HOMERUN WIRES BE #10AWG *USE-2, PV
<br />WIRE, OR PROPRIETARY SOLAR CABLING SPECIFIED BY MFR,
<br />OR EQUIVALENT; ROUTED TO SOURCE CIRCUIT COMBINER
<br />BOXES AS REQUIRED
<br />· ALL CONDUCTORS AND OCPD SIZES AND TYPES SPECIFIED
<br />ACCORDING TO [CEC 690.8 (A)(1) & (B)(1)], [CEC 240] [CEC
<br />690.7] FOR MULTIPLE CONDUCTORS
<br />· ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT
<br />SHALL BE DERATED ACCORDING TO [CEC TABLE 310.15
<br />(B)(2)(C)] BLACK ONLY**
<br />· EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE-2, 90°C
<br />RATED, WET AND UV RESISTANT, AND UL LISTED RATED FOR
<br />600V, UV RATED SPIRAL WRAP SHALL BE USED TO PROTECT
<br />WIRE FROM SHARP EDGES
<br />· PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED
<br />THHN/THWN-2 INSULATED, 90°C RATED, WET AND UV
<br />RESISTANT, RATED FOR 600V PER CEC 2008 OR 1000V PER
<br />CEC 2011
<br />· 4-WIRE DELTA CONCECTED SYSTEMS HAVE THE PHASE WITH
<br />THE HIGHER VOLTAGE TO GROUND MARKED ORANGE OR
<br />IDENTIFIED BY OTHER EFFECTIVE MEANS
<br />· ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE
<br />CIRCUIT PROTECTION
<br />·VOLTAGE DROP LIMITED TO 2%
<br />·AC CONDUCTORS >4AWG COLOR CODED OR MARKED: PHASE
<br />A OR L1- BLACK, PHASE B OR L2- RED, PHASE C OR L3- BLUE,
<br />NEUTRAL- WHITE/GRAY
<br />2 VICINITY MAP PV-0 SCALE: NTS
<br />GOVERNING CODES
<br />2022 CALIFORNIA BUILDING CODE
<br />2022 CALIFORNIA ELECTRICAL CODE
<br />2022 CALIFORNIA FIRE CODE
<br />2022 CALIFORNIA PLUMBING CODE
<br />2022 CALIFORNIA MECHANICAL CODE
<br />2022 CALIFORNIA ENERGY CODE
<br />2022 CALIFORNIA RESIDENTIAL CODE
<br />2022 CALIFORNIA ADMINISTRATIVE CODE
<br />EQUIPMENT SUMMARY
<br />06 HANWHA Q.CELLS: Q.PEAK DUO L-G8.3/BFG 420W MODULES
<br />02 APS QT2 -208 3-PHASE (208V) MICRO-INVERTERS
<br />SYSTEM RATING
<br />2.520 KWDC
<br />3.456 KWAC
<br />PROJECT SITE
<br />PROJECT SITE
<br />Bldg#: 101118106
<br />Elec#: 20181990
<br />
<br />Approvals:
<br />Bldg: KAhangian
<br />Elec: MSmith
<br />Plng: CSantana
<br />The scope of the plans is for
<br />the installation of the solar
<br />photovoltaic system only
<br />and the approval is subject
<br />to compliance with all
<br />applicable city and state
<br />codes and regulations
<br />regarding construction. The
<br />approval of the plans does
<br />not constitute any
<br />certification of the accuracy,
<br />completeness, or building
<br />permit status of the existing
<br />buildings and structures as
<br />shown.
<br />542 E Central Ave - 101118106 &
<br />20181990
<br />4/25/2024
|