My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CANCELLED- 2341 S Park Dr - Plan
PBA
>
Building
>
ProjectDox
>
P
>
Park Dr
>
2341 S Park Dr
>
CANCELLED- 2341 S Park Dr - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:11:22 PM
Creation date
6/1/2025 12:11:09 PM
Metadata
Fields
Template:
Plan
Permit Number
20181849
101117918
Full Address
2341 S Park Dr
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV <br />SHEET NAME <br />SHEET SIZE <br />SHEET NUMBER <br />JO <br />H <br />N <br />A <br />T <br />H <br />A <br />N <br /> <br />J <br />I <br />M <br />E <br />N <br />E <br />Z <br />RE <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />23 <br />4 <br />1 <br /> <br />P <br />A <br />R <br />K <br /> <br />D <br />R <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />ANSI B <br />11" X 17" <br />DATE DESCRIPTION <br />REVISIONS <br />PROJECT NAME & ADDRESS <br />DATE:09/12/2023 <br />DRAWN BY <br />ESR <br />09/12/2023INITIAL DESIGN <br />MONA LEE SOLAR <br />A09/22/2023 LAYOUT CHANGE <br />B11/28/2023 REVISION <br />PROJECT DATA GENERAL NOTES VICINITY MAP <br />SHEET INDEX <br />CODE REFERENCES <br />PROJECT <br />ADDRESS <br />2341 PARK DR, <br />SANTA ANA, CA 92707 <br />OWNER:JOHNATHAN JIMENEZ <br />SCOPE: <br />HOUSE PHOTO <br />COVER SHEET <br />PHOTOVOLTAIC ROOF MOUNT SYSTEM <br />18 MODULES-ROOF MOUNTED - 7.200 KW DC, 6.000 KW AC <br />2341 PARK DR, SANTA ANA, CA 92707 <br />PV-1 COVER SHEET <br />PV-2 PLOT PLAN WITH ROOF PLAN <br />PV-3 ROOF PLAN & MODULES <br />PV-4 ELECTRICAL PLAN <br />PV-5 ATTACHMENT DETAIL <br />PV-6 ELECTRICAL LINE DIAGRAM <br />PV-7 WIRING CALCULATION <br />PV-8 LABELS <br />PV-9 PLACARD <br />PV-10 OPTIMIZER CHART <br />PV-11+ EQUIPMENT SPECIFICATIONS <br />PV-1 <br />AUTHORITIES HAVING JURISDICTION: <br />BUILDING: ORANGE COUNTY <br />ZONING: ORANGE COUNTY <br />UTILITY: SCE <br />PROJECT TO COMPLY WITH THE FOLLOWING: <br />2022 CALIFORNIA BUILDING CODE (CBC) <br />2022 CALIFORNIA RESIDENTIAL CODE (CRC) <br />2022 CALIFORNIA GREEN BUILDING CODE (CGBC) <br />2022 CALIFORNIA ELECTRICAL CODE (CEC) <br />2022 CALIFORNIA ENERGY CODE (CENC) <br />ASCE 7-16 <br />DESIGNER: ESR <br />PARCEL ID: 14014231 <br />7.200 KW DC ROOF MOUNT <br />SOLAR PV SYSTEM WITH <br />18 URECO SOLAR: FBM400MFG-BB 400W <br />MONO MODULES WITH <br />18 SOLAREDGE: S440 POWER OPTIMIZERS AND <br />01 SOLAREDGE: SE6000H-US (240V) INVERTER <br />1. ALL COMPONENTS ARE UL LISTED AND CEC CERTIFIED, WHERE WARRANTED. <br />2. THE SOLAR PV SYSTEM WILL BE INSTALLED IN ACCORDANCE WITH ARTICLE 690 OF THE 2022 CEC. <br />3. THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PV SYSTEM INSPECTED PRIOR TO PARALLEL <br />OPERATION. <br />4. ALL CONDUCTORS OF A CIRCUIT, INCLUDING THE EGC, MUST BE INSTALLED IN THE SAME RACEWAY, OR CABLE, OR <br />OTHERWISE RUN WITH THE PV ARRAY CIRCUIT CONDUCTORS WHEN THEY LEAVE THE VICINITY OF THE PV ARRAY. <br />5. WHERE METALLIC CONDUIT CONTAINING DC CONDUCTORS IS USED INSIDE THE BUILDING, IT SHALL BE IDENTIFIED AS <br />"CAUTION: SOLAR CIRCUIT" EVERY 10FT. <br />6. HEIGHT OF THE AC DISCONNECT SHALL NOT EXCEED 6'-7" PER CEC CODE 240.24. <br />7. A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH CEC 690.47 AND 250.50 THROUGH 60 AND 250-166 SHALL BE <br />PROVIDED. PER CEC GROUNDING ELECTRODE SYSTEM OF EXISTING BUILDING MAY BE USED AND BONDED TO THE SERVICE <br />ENTRANCE. IF EXISTING SYSTEM IS INACCESSIBLE OR INADEQUATE A SUPPLEMENTAL GROUNDING ELECTRODE WILL BE USED <br />AT THE INVERTER LOCATION CONSISTING OF A UL LISTED 8 FT. GROUND ROD WITH ACORN CLAMP. GROUNDING ELECTRODE <br />CONDUCTORS SHALL BE NO LESS THAN #8 AWG AND NO LARGER THAN #6 AWG COPPER AND BONDED TO THE EXISTING <br />GROUNDING ELECTRODE TO PROVIDE FOR A COMPLETE SYSTEM. <br />8. PHOTOVOLTAIC MODULES ARE TO BE CONSIDERED NON-COMBUSTIBLE. <br />9. PHOTOVOLTAIC INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. <br />10. ALL WIRING MUST BE PROPERLY SUPPORTED BY DEVICES OR MECHANICAL MEANS DESIGNED AND LISTED FOR SUCH USE. <br />WIRING MUST BE PERMANENTLY AND COMPLETELY HELD OFF THE ROOF SURFACE. <br />11. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH THE LOCAL BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV <br />RESISTANT. ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE CEC AND AHJ. <br />12. INVERTER(S) USED IN UNGROUNDED SYSTEM SHALL BE UL 1741 LISTED. <br />13. THE INSTALLATION OF EQUIPMENT AND ALL ASSOCIATED WIRING AND INTERCONNECTION SHALL BE PERFORMED ONLY BY <br />QUALIFIED PERSONS [ CEC 690.4(C)] <br />14. ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED (OR BETTER), INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND <br />SWITCHES. <br />15. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED AND BONDED IN ACCORDANCE WITH CEC ARTICLE 250. <br />16. SYSTEM GROUNDING SHALL BE IN ACCORDANCE WITH CEC 690.41. <br />17. PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION IN ACCORDANCE WITH <br />CEC 690.12 <br />18. DISCONNECTING MEANS SHALL BE LOCATED IN A VISIBLE, READILY ACCESSIBLE LOCATION WITHIN THE PV SYSTEM <br />EQUIPMENT OR A MAXIMUM OF 10 FEET AWAY FROM THE SYSTEM [ CEC 690.13(A)] <br />19. ALL WIRING METHODS SHALL BE IN ACCORDANCE WITH CEC 690.31 <br />20. WORK CLEARANCES AROUND ELECTRICAL EQUIPMENT WILL BE MAINTAINED PER CEC 110.26(A)(1), 110.26(A)(2) AND 10.26(A)(3). <br />21. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL BE TESTED, LISTED & IDENTIFIED IN ACCORDANCE WITH <br />UL1703 <br />22. ELECTRICAL CONTRACTOR TO PROVIDE CONDUIT EXPANSION JOINTS AND ANCHOR CONDUIT RUNS AS REQUIRED PER CEC <br />23. IN ACCORDANCE WITH 2022 CFC 1205.5, 2019 CFC 1204.4, AND 2016 CFC 605.11.2 A CLEAR, BRUSH-FREE AREA OF 10 FEET(3048 <br />MM) SHALL BE REQUIRED FOR GROUND-MOUNTED PHOTOVOLTAIC ARRAYS <br />Reviewed and approved <br />Neal Shah, P.E. <br />CA Lic. No. 5107 <br />11/28/2023 <br />Bldg# 101117918 <br />Elec# 20181849 <br />The scope of the plans is for the installation of the solar <br />photovoltaic system only and the approval is subject to <br />compliance with all applicable city and state codes and <br />regulations regarding construction. The approval of the <br />plans does not constitute any certification of the accuracy, <br />completeness, or building permit status of the existing <br />buildings and structures as shown. <br />2341 S Park Dr - <br />10-26-231/22/2024
The URL can be used to link to this page
Your browser does not support the video tag.