Laserfiche WebLink
GENERAL NOTES ABBREVIATIONS PROJECT INFORMATION SHEET INDEX <br />SHEET NO. TITLE <br />ACS.0 COVER SHEETAFF ABOVE FINISH FLOOR <br />AD ACCESS DOOR <br />AP ACCESS PANEL <br />ACOUSE (ACST) ACOUSTIC <br />A/L ALTERNATE <br />A/C AIR CONDITIONING <br />ALLUM (AL) ALLUMINUM <br />APPD APPROVED <br />APPROX APPROXIMATE <br />ARCH ARCHITECTURAL <br />ASPH ASPHALT <br />AUTO AUTOMATIC <br />BOW BACK OF WALL <br />BATT INSUL BATTEN INSULATION <br />BM BEAM <br />BD, BRD BOARD <br />BLDG BUILDING <br />CAB CABINET <br />CLG CEILING <br />CTR CENTER <br />CL CENTER LINE <br />CC CENTER TO CENTER <br />CFCI CONTRACTOR <br />FURNISHED <br />CONTRACTOR INSTALLED <br />CT CIRCULAR TILE <br />CIR CIRCULAR <br />CLR CLEAR, COLOR <br />CLO CLOSET <br />COL COLUMN <br />CONC CONCRETE <br />CONN CONSTRUCTION <br />CONT CONTINUOUS <br />CJ CONTROL JOINT <br />CORR CORRIDOR <br />CNTR COUNTER <br />DET (DETI.) DETAIL <br />DIAG DIAGONAL <br />DIA DIAMETER <br />DIM DIMENSION <br />DISP DISPENSER <br />DR DOOR <br />DBL DOUBLE <br />DN DOWN <br />DWR DRAWER <br />DWG DRAWING <br />DF DRINKING FOUNTAIN <br />EA EACH <br />ELEC ELECTRICAL OR ELECTRIC <br />EL, ELEV ELEVATION <br />EMERG EMERGENCY <br />ENCL ENCLOSURE <br />EQUIP (EQPT)EQUIPMENT <br />EQ EQUAL <br />EW EACH WAY <br />EXH EXHAUST <br />EXIST. EXISTING <br />EXT EXTERIOR <br />FOC FACE OF CONCRETE <br />FOF FACE OF FINISH <br />FOS FACE OF STUDS <br />FOW FACE OF WALL <br />FT FEET <br />FIN FINISH <br />FE (FEXT) FIRE EXTINGUISHER <br />FEC FIRE EXTINGUISHER <br />CABINET <br />FES FIRE EXTINGUISHER <br />SURFACE <br />MOUNTED <br />FIXT FIXTURE <br />FLR OR FL FLOOR <br />FD FLOOR DRAIN <br />FLOUR FLOURESCENT <br />FR FRAME <br />FURG FURRING <br />GA GAGE OR GUAGE <br />GALV GALVINIZED <br />GI GALVINIZED IRON <br />G GAS <br />GL GLASS <br />GB GRAB BAR <br />GR GRADE <br />GND GROUND <br />GYP GYPSUM <br />GYP BD GYPSUM WALLBOARD <br />GC GENERAL CONTRACTOR <br />HDR HANDRAIL <br />HBD HARDBOARD <br />HDW (HW) HARDWARE <br />HDWD HARDWOOD <br />H/C HANDICAPPED <br />HD HEAD <br />HDR HEADER <br />HTR HEATER <br />HT (HGT) HEIGHT <br />H.P. HIGH POINT <br />HC HOLLOW CORE <br />H.M. HOLLOW METAL <br />HMI HOLLOW METAL <br />INSULATED <br />HORIZ HORIZONTAL <br />HR HOUR <br />IN. INCH <br />I.D. INSIDE DIAMETER <br />IDENT IDENTIFICATION <br />INSUL INSULATION <br />INT (INTR) INTERIOR <br />JAN JANITOR <br />JT JOINT <br />JST JOIST <br />K KEY <br />KL KEY LOCK <br />KP KICK PLATE <br />KIT KITCHEN <br />LAB LABORATORY <br />LAM LAMINATE <br />LAV LAVATORY <br />LT LIGHT <br />LTG LIGHTING <br />LT WT LIGHT WEIGHT <br />LIN LINEAR <br />LONG LONGITUDINAL <br />LP LOW POINT <br />LKR LOCKER <br />LVR LOUVER <br />MACH MACHINE <br />MAINT MAINTENANCE <br />MFR MANUFACTURE <br />MFG MANUFACTURING <br />MSTC MASIC <br />MATL MATERIAL <br />MAX MAXIMUM <br />MECH MECHANICAL <br />MTL METAL <br />MT METAL THRESHOLD <br />MIN MINIMUM <br />MIR MIRROR <br />MISC MISCELLANEOUS <br />MLDG MOLDING <br />MTD MOUNTING <br />MUL MULLION <br />N NORTH <br />NIC NOT IN CONTRACT <br />NO. (#) NUMBER <br />NTS NOT TO SCALE <br />OFF. OFFICE <br />OFCI OWNER FURNISHED <br />CONTRACTOR INSTALLED <br />OC ON CENTER <br />OPP OPPOSITE <br />O.H. OVERHEAD <br />O/ OVER <br />PR PAIR <br />PNL PANEL <br />PTD PAPER TOWEL <br />DISPENSER <br />PTD/R PAPER TOWEL <br />DISPENSER & <br />RECEPTACLE <br />PTR PAPER TOWEL <br />RECEPTACLE <br />PRTN PARTITION <br />PERF PERFORATED <br />PLAST PLASTER <br />PLAS PLASTIC <br />PL PLATE <br />PLBG PLUMBING <br />PLYWD PLYWOOD <br />PT POINT <br />LBS POUNDS <br />PSF POUND/SQUARE FOOT <br />PSI POUND/SQUARE INCH <br />PRECST PRECAST <br />PREFAB PREFABRICATED <br />PROJ PROJECTION <br />Q.T. QUARRY TILE <br />¼ RD QUARTER ROUND <br />QTRS QUARTERS <br />RAD RADIUS <br />RECP RECEPTABLE <br />REF REFERENCE <br />REFR REFRIGERATOR <br />REINF REINFORCEMENT <br />REQD REQUIRED <br />REV REVISIONS <br />R RISER <br />RM ROOM <br />RND ROUND <br />RUB RUBBER <br />RB RUBBER BASE <br />SND SANITARY NAPKIN <br />DISPENSER <br />SNR SANITARY NAPKIN <br />RECEPTICLE <br />SCH SCHEDULE <br />SCD SEAT COVER DISPENSER <br />SECT SECTION <br />SSK SERVICE SINK <br />SHTHG SHEATHING <br />SHT SHEET <br />SHWR SHOWER <br />SIM SIMILAR <br />SD SOAP DISPENSER <br />SC SEPARATE CIRCUIT <br />S.M. SHEET METAL <br />S SOUTH <br />SPKR SPEAKER <br />SPEC SPECIFICATION <br />SQ SQUARE <br />STD STANDARD <br />STA STATION <br />STL STEEL <br />STOR STORAGE <br />STRL STRUCTURAL <br />SUSP SUSPENDED <br />SYM SYMMETRICAL <br />TEL TELEPHONE <br />TV TELEVISION <br />TEMP TEMPERATURE <br />TER TERRAZZO <br />THERMO THERMOSTAT <br />THK THICK <br />TH THRESHOLD <br />TOIL TOILET <br />TPD TOILET PAPER <br />DISPENSER <br />TOC TOP OF CONCRETE <br />TC TOP OF CURB <br />TOS TOP OF STEEL <br />TS TUBULAR STEEL <br />TW TOP OF WALL <br />TB TOWEL BAR <br />TRANS TRANSVERSE <br />TYP TYPICAL <br />UL UNDERWRITERS <br />LABORATORIES <br />UNFIN UNFINISHED <br />UNO UNLESS NOTED <br />OTHERWISE <br />UR URINAL <br />VERT VERTICAL <br />VEST VESTIBULE <br />VCT VINYL COMP TILE <br />VT VINYL TILE <br />VWC VINYL WALL COVERING <br />WNSCT WAINSCOT <br />WC WATER CLOSET <br />WP WATER PROOF <br />W/R WATER RESISTANT <br />WT WEIGHT <br />WDT WIDTH <br />WDW WINDOW <br />W/ WITH <br />W/O WITHOUT <br />WD WOOD <br />SITE <br />LOCATION <br />T E N A N T I M P R O V E M E N T O F <br />1 8 2 1 N E W P O R T C I R C L E <br />S A N T A A N A , C A <br />STRUCTURAL ENGINEER <br />GET STRUCTURAL ENGINEERING <br />3000 E. BIRCH STREET, SUITE 203 <br />BREA, CA 92821 <br />PROJECT <br />SCOPE OF WORK: TENANT IMPROVEMENT OF AN EXISTING <br />1-STORY COMMERCIAL BUILDING. CONVERSION OF <br />PART OF EXISTING RETAIL AREA TO NEW CANNABIS <br />FLOWER ROOM. <br />ADDRESS: 1821 NEWPORT CIRCLE, SANTA ANA, CA 92705 <br />AIN: 403-071-04 <br />OCCUPANCY TYPE: F-1, M (SEE FLOOR PLAN FOR TABULATIONS) <br />TOTAL GROSS FLOOR AREA: 10,400 S.F. <br />CONSTRUCTION <br />CONSTRUCTION TYPE: IIIB <br />FIRE SPRINKLERS: NO <br />FIRE ALARM: NO <br />PROPERTY OWNER <br />NAME SANTA ANA VENTURES, INC. <br />ADDRESS:1821 E. NEWPORT CIRCLE <br />SANTA ANA, CA 92705 <br />ZONING <br />EXISTING USE: CANNABIS DISPENSARY AND CANNABIS CULTIVATION <br />PROPOSED USE: CANNABIS DISPENSARY AND CANNABIS CULTIVATION. <br />A <br />1 COLUMN GRID <br />XXX <br />X <br />REVISION CLOUD & DELTA <br />1 <br />ALIGN FACE OF NEW <br />CONSTRUCTION WITH EXISTING <br />NIC (NOT IN CONTRACT) <br />BUILDING <br />STANDARD DOOR <br />100.1 <br />DOOR NUMBER, REFER <br />TO DOOR SCHEDULE <br />& <br />OFFICE ROOM NAME <br />ROOM NUMBER <br />DETAIL NUMBER <br />SHEET NUMBER <br />ELEVATION NUMBER <br />SHEET NUMBER <br />ENLARGED PLAN <br />AREA TO BE ENLARGED <br />SHEET NUMBER <br />+9'-0" <br />INDICATES CEILING <br />HEIGHT, AFF <br />(E) <br />(N) <br />(R) <br />INDICATES EXISTING ITEM <br />TO REMAIN <br />INDICATES NEW ITEM <br />INDICATES RELOCATED ITEM <br />XXX <br />X <br />CT-31 <br />4" Radius Cove INDICATES FINISH CODE, <br />REFERENCE FINISH LEGEND <br />INDICATES SPECIAL <br />INSTRUCTIONS FOR FINISHES5 <br />A.X.X <br />SYMBOLS <br />VACINITY MAP <br />DEFERRED SUBMITTALS <br />PARKING (NO CHANGE TO PARKING) <br />EXISTING STANDARD PARKING SPACES : 14 <br />EXISTING ACCESSIBLE PARKING SPACES (CBC TABLE 11B-208.2): 1 <br />SHEET NUMBER: <br />REVISIONS <br />COVER SHEET <br />SHEET NAME: <br />PREPARED BY: <br />OWNER: <br />PROJECT: <br />STAMP:JOB NUMBER: <br />XXXXX <br />DATE: <br />00.00.00 <br />CONSULTANT: <br />DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN <br />CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF PD&C, INC. <br />dba RAND KRUSE AND MAY NO BE DUPLICATED, USED OR <br />DISCLOSED WITHOUT WRITTNE CONSENT OF PD&C, INC. dba <br />RAND KRUSE. <br />SANTA ANA VENTURES, INC. <br />1821 E. NEWPORT CIRCLE <br />SANTA ANA, CA 9205 <br />ACS.1 NOTES AND CAL GREEN <br />A.1.1 ROOF PLAN <br />A.1.3 FLOOR PLAN <br />A.2.0 CEILING PLAN <br />A5.0 SCHEDULES <br />A.1.4 EXIT ANALYSIS <br />A6.0 DETAILS <br />A6.1 DETAILS <br />GENERAL NOTES <br />FIRE DEPARTMENT NOTES <br />ACCESSIBILITY NOTES <br />FIRE DEPARTMENT NOTES (CONT.) ACCESSIBILITY NOTES (CONT.) <br />1. GENERAL CONTRACTOR (G.C.) TO VERIFY AND REVIEW ALL JOB <br />CONDITIONS, DIMENSIONS AND DETAILS PRIOR TO BIDDING, PRICING AND <br />CONSTRUCTION TO DETERMINE WHICH NOTES APPLY DIRECTLY TO HIS <br />RESPONSIBILITY. G.C. TO MAKE NOTE OF AND SUBMIT IN WRITTEN FORM <br />TO PD&C, INC. dba INTEREPID GROUP ANY DAMAGES OR DEFICIENCIES ON <br />PREMISES AND ANY CONFLICTS AND DISCREPANCIES REGARDING <br />DIMENSIONS, NOTES OR SPECIFICATIONS. <br />2. ALL WORK SHOWN OR IMPLIED, UNLESS SPECIFICALLY QUESTIONED, SHALL <br />BE CONSIDERED FULLY UNDERSTOOD IN ALL RESPECTS BY THE GENERAL <br />CONTRACTOR AND WILL BE SOLELY RESPONSIBLE FOR ANY <br />MISINTERPRETATIONS OR CONSEQUENCES THEREOF FOR ALL WORK ON <br />DRAWINGS. <br />3. DRAWINGS ARE NOT TO BE SCALED. DIMENSIONS GOVERN. LARGE SCALE <br />DRAWINGS GOVERN OVER SMALL SCALE DRAWINGS. CONTRACTOR SHALL <br />VERIFY ALL CONDITIONS AND DIMENSIONS @ JOB SITE PRIOR TO START OF <br />CONSTRUCTION. IF DISCREPANCIES ARE FOUND, PD&C, INC. dba <br />INTEREPID GROUP SHALL BE NOTIFIED FOR CLARIFICATION. <br />4. ALL DRAWINGS AND NOTES ARE COMPLEMENTARY TO ANY WORK SHOWN <br />OR REFERENCED TO ON ANY ONE DRAWING SHALL BE PROVIDED AS <br />THOUGH SHOWN ON ALL RELATED DRAWINGS. <br />5. GENERAL CONTRACTOR SHALL COMPLY WITH ALL RULES AND REGULATIONS <br />OF BUILDING MANAGEMENT IN ALL RESPECTS. IT IS THE G.C. <br />RESPONSIBILITY TO OBTAIN SUCH REGULATIONS FROM THE BUILDING <br />OWNER AND PROVIDE FOR REVIEW BY ALL SUBTRADES. G.C. TO NOTIFY <br />PD&C, INC. dba INTEREPID GROUP OF ANY CONFLICT BETWEEN <br />REGULATIONS AND OTHER CONTRACTUAL DOCUMENTS, PRIOR TO <br />PROCEEDING WITH ANY OTHER WORK. <br />6. ALL WORK TO BE PERFORMED IN OCCUPIED AREAS OR IN OTHER TENANT <br />SPACES SHALL BE PERFORMED ON OVERTIME, AS REQUIRED, AND BY <br />BUILDING RULES AND REGULATIONS. <br />7. GENERAL CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF <br />ALL WORK REQUIRED TO MAKE ALL PARTS COME TOGETHER PROPERLY AND <br />FIT TO RECEIVE OR BE RECEIVED BY WORK OF OTHER CONTRACTORS <br />IMPLIED BY DRAWING OR NOTES. <br />8. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR USE, SCHEDULING AND <br />FEES INCURRED BY HOISTING FACILITIES/ELEVATORS. <br />9. ALL WORK IS TO CONFORM TO PD&C, INC. dba INTEREPID GROUP <br />DRAWINGS AND SPECIFICATIONS AND SHALL BE NEW AND OF THE BEST <br />QUALITY OF KINDS SPECIFIED. ALL MANUFACTURED ARTICLES TO BE <br />INSTALLED, CONNECTED AND CONDITIONED AS DIRECTED BY <br />MANUFACTURER. ALL WORK TO BE PERFORMED IN A GOOD <br />WORKMANSHIP MANNER. <br />10. ALL SUBCONTRACTORS SHALL BE RESPONSIBLE FOR REVIEWING ENTIRE SET <br />OF DRAWINGS AND NOTING THEIR WORK AS APPLICABLE. ALL SHOP <br />DRAWINGS SHALL BE SUBMITTED TO PD&C, INC. dba INTEREPID GROUP <br />FOR APPROVAL THROUGH G.C. PRIOR TO COMMENCEMENT OF ANY WORK. <br />11. GENERAL CONTRACTOR TO BE SOLELY RESPONSIBLE FOR REMOVAL, <br />REPLACEMENT AND RECTIFICATION OF ALL DAMAGED AND DEFECTIVE <br />MATERIAL AND/OR WORKMANSHIP IN CONNECTION WITH THE CONTRACT <br />WORK. ANY COSTS CAUSED BY DEFECTIVE OR ILL-TIMED WORK, POOR <br />WORKMANSHIP, MATERIALS, POOR SCHEDULING OR DELINQUENT <br />ORDERING SHALL BE BORNE BY THE GENERAL CONTRACTOR. <br />12. DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION ALL <br />REQUIRED EXITS SHALL BE MAINTAINED. EXIT LIGHTING AND FIRE <br />PROTECTIVE SERVISES SHALL BE PROPERLY MAINTAINED. ALL WAYS OF <br />TRAVEL FROM EXITS TO THE STREET SHALL BE MAINTAINED FREE FROM ALL <br />OBSTRUCTIONS. <br />13. GENERAL CONTRACTOR SHALL PROPERLY PROTECT THE BUILDING AND ANY <br />OTHER ADJOINING PROPERTY OR WORK AND PROTECT ALL EXISTING <br />SURFACED OR FINISHED TO REMAIN DURING DEMOLITION AND <br />CONSTRUCTION. ANY DAMAGE TO THE SAME SHALL BE REPAIRED BY G.C. <br />AT HIS EXPENSE TO “LIKE NEW” CONDITION. <br />14. GENERAL CONTRACTOR SHALL VERIFY ALLOWED WORKING HOURS FOR ALL <br />WORK DONE TO THE CORE (INCLUDING DRILLING, PATCHING, AND <br />ELECTRICAL HOOKUPS) AND IS RESPONSIBLE FOR ALL WORK NECESSARY <br />TO COMPLETE WORK TO THE CORE AND IN NON-LEASE SPACE. <br />15. GENERAL CONTRACTOR IS RESPONSIBLE TO CLEAN UP AND REMOVE ALL <br />WASTE MATERIALS FROM PREMISES AS GENERATED BY CONSTRUCTION <br />DEMOLITION, WOODWORK AND ALL TRADES EMPLOYED BY CONTRACTUAL <br />WORK. <br />16. ALL WORK NOTED N.I.C. OR “BY TENANT” IS TO BE ACCOMPLISHED BY <br />PERSONS OTHER THAN G.C. AND IS NOT PART OF CONSTRUCTION <br />AGREEMENT. <br />17. GENERAL CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED <br />PERMITS FROM BUILDING DEPARTMENT AND FORWARD COPIES TO PD&C, <br />INC. dba INTEREPID GROUP. <br />18. GENERAL CONTRACTOR TO PROVIDE CONSTRUCTION SCHEDULE BY THE <br />START OF CONSTRUCTION AND A LIST OF A LONG LEAD ITEMS BY THE END <br />OF THE FIRST WEEK OF CONSTRUCTION. <br />19. GENERAL CONTRACTOR TO SUBMIT IN WRITING ALL CHANGE ORDERS FOR <br />ADDITIONAL WORK TO OWNER FOR REVIEW AND APPROVAL. NO WORK IS <br />TO PROCEED UNTIL A SIGNED PROPOSAL IS RETURNED TO G.C. UNLESS <br />OTHEWISE NOTED. ALL CHANGES IN THIS FIELD SHALL BE SIGNED BY THE <br />CLIENT OR AUTHORIZED REPRESENTATIVE. <br />20. UPON COMPLETION OF THE WORK, THE G.C. SHALL SUBMIT TO OWNER: <br />A. COPY OF INSPECTIONS AND FINAL SIGN-OFF. <br />B. CERTIFICATE OF SUBSTANTIAL COMPLETION (AIA DOCUMENT #G704). <br />C. COPY OF PERMIT CARD. <br />D. BUILDING DEPARTMENT APPROVED DRAWINGS. <br />E. WARRANTIES FOR SPECIFIED MATERIALS. <br />F. RECORD/AS-BUILT DOCUMENTS. <br />21. ALL WORK SHALL COMPLY WITH THE REGULATIONS OF THE GOVERNMENTAL <br />AUTHORITIES HAVING JURISDICTION. THE SPECIFICATIONS SHALL BE <br />SUPPLEMENTAL TO ALL LAWS AND CODES OF GOVERNMENTAL REGULATING <br />BODIES RELATING TO BUILDINGS, AND ALL APPLICABLE REQUIREMENTS <br />SPECIFIED IN THESE REGULATIONS SHALL BE FOLLOWED AS THOUGH <br />SPECIFICALLY NOTED BY SUCH CODES AS LAWS. IT IS THE G.C. <br />RESPONSIBILITY TO NOTIFY PD&C, INC. dba INTEREPID GROUP OF ANY <br />CONFLICTS BETWEEN THESE DRAWINGS AND LOCAL BUILDING CODES. G.C. <br />TO PROVIDE A SEPARATE PRICE IN THE BID FOR EACH ITEM THAT REQUIRES <br />CHANGING MODIFYING OR REMOVAL. <br />22. APPLICABLE CODES <br /> THIS PROJECT SHALL CONFORM TO: <br />2022 CALIFORNIA ADMINSTRATIVE CODE - (PART 1, TITLE 24 CCR) <br />2022 CALIFORNIA BUILDING CODE - (PART 2, TITLE 24, CCR) <br />2022 CALIFORNIA ELECTRICAL CODE - (PART 3 TITLE 24, CCR) <br />2022 CALIFORNIA MECHANICAL CODE - (PART 4, TITLE 24, CCR) <br />2022 CALIFORNIA PLUMBING CODE - (PART 5, TITLE 24, CCR) <br />2022 CALIFORNIA ENERGY CODE - (PART 6, TITLE 24, CCR) <br />2022 CALIFORNIA ELEVATOR SAFETY CONSTRUCTION CODE - (PART 7, <br />TITLE 24 CCR) <br />2022 CALIFORNIA HISTORICAL CODE - (PART 8, TITLE 24) <br />2022 CALIFORNIA FIRE CODE - (PART 9, TITLE 24, CCR) <br />2022 CALIFORNIA EXISTING BUILDING CODE - (PART 10, TITLE 24 CCR) <br />2022 CALIFORNIA REFERENCED STANDARDS - (PART 12, TITLE 24, CCR) <br />2022 AMERICANS WITH DISABILITIES ACT (ADA) <br />23. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND FIELD CONDITIONS BEFORE <br />PROCEEDING WITH WORK. <br />24. ALL CONTRACTORS AND SUBCONTRACTORS ARE RESPONSIBLE FOR <br />CONFORMING TO ALL APPLICABLE LOCAL CODES AND TRADE STANDARDS. <br />25. CONTRACTOR TO REWORK SPRINKLERS, FIRE SAFETY SYSTEM REQUIREMENTS, <br />SWITCHING, EXIT SIGNS AND HVAC SYSTEM AS REQUIRED. <br />26. PD&C, INC. dba INTREPID GROUP IS UNAWARE OF ANY EXISTING ASBESTOS <br />WITHIN THE AREA OF NEW WORK. IT IS THE OWNER'S RESPONSIBILITY TO <br />ADVISE THE GENERAL CONTRACTOR AND HIS SUBS OF ANY ASBESTOS WITHIN <br />THE FACILITY. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY <br />PRECAUTIONS REQUIRED BY LAW TO PROTECT ALL WORKERS AND OCCUPANTS <br />IF ANY ASBESTOS IS IDENTIFIED AND NOTIFY THE OWNER IMMEDIATELY. <br />1. EXIT DOORS SHALL SWING IN THE DIRECTION OF EXIT TRAVEL WHEN SERVING ANY <br />HAZARDOUS AREA OR WHEN SERVING AN OCCUPANT LOAD OF 50 OR MORE. <br />2. EXIT DOORS SHALL BE READILY OPENABLE FROM THE EGRESS SIDE WITHOUT THE USE <br />OF A KEY OR SPECIAL KNOWLEDGE OR EFFORT. (2022 CBC) <br />EXCEPTION: THIS REQUIREMENT SHALL NOT APPLY TO EXTERIOR EXIT DOORS IN A <br />GROUP “B” OCCUPANCY IF THERE IS A VISIBLE, DURABLE SIGN ON OR ADJACENT TO THE <br />DOOR STATING “THIS DOOR TO REMAIN OPEN DURING BUSINESS HOURS.” THE LETTERS <br />SHALL BE NOT LESS THAN 1 INCH HIGH ON A CONTRASTING BACKGROUND. THE LOCKING <br />DEVICE MUST BE A TYPE THAT WILL BE READILY DISTINGUISHABLE AS LOCKED. <br />3. PANIC HARDWARE, WHEN INSTALLED, SHALL COMPLY WITH ALL APPLICABLE <br />BUILDING CODE REQUIREMENTS. THE ACTIVATING MEMBER SHALL BE MOUNTED AT <br />A HEIGHT OF NOT LESS THAN 30 INCHES NOR MORE THAN 44 INCHES ABOVE THE <br />FLOOR. THE UNLATCHING FORCE SHALL NOT EXCEED 15 POUNDS WHEN APPLIED IN <br />THE DIRECTION OF EXIT TRAVEL. <br />4. THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE, SHALL BE ILLUMINATED AT <br />ALL TIMES THE BUILDING SPACE SERVED BY THE MEANS OF EGRESS IS OCCUPIED. <br />THE MEANS OF EGRESS ILLUMINATION LEVEL SHALL NOT BE LESS THAN 1 <br />FOOT-CANDLE (11 LUX) AT THE WALKING SURFACE LEVEL (2022 CBC) <br />5. EXIT ILLUMINATION SHALL COMPLY WITH 2022 CBC CHAPTER 10. <br />6. EXIT SIGNS SHALL BE INSTALLED AT REQUIRED EXIT DOORWAYS AND WHERE <br />OTHERWISE NECESSARY TO CLEARLY INDICATE THE DIRECTION OF EGRESS WHEN THE <br />EXIT SERVES AN OCCUPANT LOAD OF 50 OR MORE. <br />EXCEPTION: MAIN EXTERIOR DOORS WHICH OBVIOUSY AND CLEARLY ARE IDENTIFIABLE <br />AS EXITS NEED TO BE SIGNED WHEN APPROVED BY THE BUILDING OFFICIAL. <br />7. WHEN NECESSARY, THE FINAL LOCATION AND QUANTITY OF EXIT SIGNS SHALL BE <br />DETERMINED BY THE FIRE DEPARTMENT PRIOR TO CONSTRUCTION OF ANY WORK. <br />8. THE COLOR AND DESIGN OF LETTERING, ARROWS AND OTHER SYMBOLS ON EXIT <br />SIGN SHALL BE IN HIGH CONTRAST WITH THEIR BACKGROUND (NOT LESS THAN .75” <br />X 6” LETTERS) (2022 CBC) <br />9. ALL RATED COORIDOR DOORS SHALL HAVE A THRESHOLD WITH A SMOKE AND DRAFT <br />SEAL AT HEAD AND JAMBS. <br />10. INTERIOR WALL AND CEILING FINISHES SHALL BE NON-COMBUSTIBLE OR HAVE A <br />FLAME SPREAD RATING OF 0 TO 25 FEET. <br />11. ALL DRAPES, HANGING CURTAINS AND OTHER DECORATIVE MATERIALS SHALL BE <br />TREATED AND MAINTAINED IN FLAME RETARDANT CONDITION. <br />12. IF REQUIRED BY CODE OR PLAN CHECK, CONSTRUCTION DOCUMENTS FOR THE CITY <br />OF NEWPORT BEACH TO INCLUDE PLANS FOR FIXED FIRE PROTECTION EQUIPMENT <br />SUCH AS STANDPIPES, SPRINKLER SYSTEMS AND FIRE ALARM SYSTEMS, MAY BE <br />SUBMITTED TO AND APPROVED BY THE STATE FIRE MARSHALL PRIOR TO ANY <br />EQUIPMENT BEING INSTALLED. EXTEND OR MODIFY EXISTING SYSTEM AS REQUIRED <br />TO ACCOMMODATE THIS PROJECT. (TITE 19, PART 3, TITLE 24). <br />13. FIRE DAMPERS SHALL BE PROVIDED WHERE AIR DUCTS PENETRATE FIRE RATED <br />WALLS OR CEILINGS AS PER 2022 CBC CHAPTER 7. SMOKE DAMPERS SHALL BE <br />PROVIDED WHERE AIR DUCTS PENETRATE FIRE RATED WALLS OR CEILINGS AS PER <br />2022 CBC CHAPTER 7. <br />14. EXTEND/MODIFY FIRE/LIFE SAFETY SYSTEM AS REQUIRED. (IF APPLICABLE) <br />15. EXTEND FIRE SPRINKLER SYSTEMS AS REQUIRED. (IF APPLICABLE) <br />16. FIRE SPRINKLER/OR LIFE SAFETY PLANS MUST BE SUBMITTED TO THE CITY FOR <br />REVIEW AND APPROVAL PRIOR TO BUILDING PERMIT ISSUANCE. <br />17. A PORTALBE FIRE EXTINGUISHER WITH A MINUMUM 2A 1 OBC RATING SHALL BE <br />PROVIDED EVERY 75' OF TRAVEL DISTANCE FROM ANY POINT WITHIN THE AREA <br />DEFINED AS SCOPE OF WORK PER THESE PLANS. PROVIDE FIRE EXTINGUISHERS AS <br />REQUIRED BY FIRE DEPARTMENT FIELD INSPECTOR. <br />18. ALL EMERGENCY LIGHTING SOURCES SHALL EMIT A MINIMUM VALUE OF ONE FOOT <br />CANDLE MEASURED AT FLOOR LEVEL. <br />19. PROVIDE EMERGENCY NOTIFICATION SYSTEM FOR THE HEARING AND VISUALLY <br />IMPAIRED PER A.D.A. REQUIREMENTS. <br />20. ADDRESS SHALL BE VISIBLE FROM STREET. <br />21. KNOX BOX REQUIRED TO BE INSTALLED. <br />22. FIRE EXTINGUISHERS REQUIRED - 2A 1 OBC EVERY 50' TRAVEL DISTANCE. <br />23. EMERGENCY EVACUATIONS SIGNAGE REQUIRED TO BE POSTED AT LOCATIONS <br />APPROVED BY FIRE DEPT. <br />24. EXIT HARDWARE SHALL COMPLY WITH CBC CHAPTER ON EXITING. <br />25. DO NOT UNDERCUT FIRE RATED DOORS. EXIT DOORS MUST BE TIED IN TO THE FIRE <br />SAFETY SYSTEM. <br />26. ALL MANUALLY OPERATED EDGE OR SURFACE-MOUNTED FLUSH BOLTS ARE <br />PROHIBITED ON EXIT DOORS. WHEN EXIT DOORS ARE USED IN PAIRS AND <br />APPROVED AUTOMATIC FLUSH BOLDS ARE USED, THE DOOR LEAD HAVING THE <br />AUTOMATIC FLUSH BOLTS SHALL HAVE NO DOOR KNOB OR SURFACE-MOUNTED <br />HARDWARE. THE UNLATCHING OF ANY LEAF SHALL NOT REQUIRE MORE THAN ONE <br />OPERATION. <br />27. ALL EXIT DOOR HARDWARE SHALL BE OF AN APPROVED TYPE AND TESTED IN <br />ACCORDANCE WITH PROCEDURES ESTABLISHED BY SFM 33.2 AND SFM 33.3 AS <br />SHOWN IN CHAPTER 2-60 OF TITLE 24. <br />28. ALL HOLLOW METAL DOOR FRAMES SHALL BE PROVIDED WITH STEEL FRAMES. <br />ENTRANCES & EXITS <br />1. ALL ENTRANCES AND ALL EXTERIOR GROUND FLOOR EXIT DOORS TO <br />BUILDINGS AND FACILITIES SHALL BE MADE ACCESSIBLE TO PERSONS <br />WITH DISABILITIES. (2022 CBC 11B-206.4) <br />2. ALL ACCESSIBLE ENTRANCES SHALL BE IDENTIFIED WITH AT LEAST ONE <br />STANDARD SIGN AND WITH ADDITIONAL DIRECTIONAL SIGNS, AS <br />REQUIRED, VISIBLE FROM APPROACHING PEDESTRIAN WAYS. <br />3. ALL GATES, INCLUDING TICKET GATES, SHALL MEET ALL APPLICABLE <br />ACCESSIBILITY SPECIFICATIONS OF DOORS. (2022 CBC 11B-206.5) <br />4. EVERY REQUIRED EXIT DOORWAYS WHICH IS LOCATED WITHIN AN <br />ACCESSIBLE PATH OF TRAVEL SHALL BE CAPABLE OF OPENING AT LEAST <br />90 DEGREES, SHALL HAVE A MINIMUM CLEAR OPENING OF 32”, AND <br />SHALL BE OF A SIZE AS TO PERMIT THE INSTALLATION OF A DOOR NOT <br />LESS THAN 3' IN WIDTH AND NOT LESS THAN 6'-8” IN HEIGHT. (2022 <br />CBC 11B-404.2.3) <br />5. WHERE PAIR OF DOORS IS UTILIZED AT LEAST ONE OF THE DOORS <br />SHALL PROVIDE A CLEAR UNOBSTRUCTED OPENING WIDTH OF <br />32-INCHES WITH THE LEAF POSITIONED AT AN ANGLE OF 90 DEGREES <br />FROM ITS CLOSED POSITION. (2022 CBC 11B-404.2.2, 404.2.3) <br />6. LATCHING AND LOCKING DOORS THAT ARE HAND ACTIVATED AND <br />WHICH ARE IN PATH OF TRAVEL SHALL BE OPERABLE WITH A SINGLE <br />EFFORT BY LEVER TYPE HARDWARE, BY PANIC BARS, PUSH-PULL <br />ACTIVATING BARS, OR OTHER HARDWARE DESIGNED TO PROVIDE <br />PASSAGE. (2022 CBC 11B-404.2.7, 309-4). <br />7. OPERABLE PARTS OF DOOR HARDWARE HARDWARE MOUNTED <br />BETWEEN 34-INCHES AND 44-INCHES ABOVE FINISHED FLOOR. (2022 <br />CBC 11B-404.2.7) <br />8. THE FLOOR LANDING ON EACH SIDE OF AN ENTRANCE OR PASSAGE <br />DOOR SHALL BE LEVEL AND CLEAR. THE LEVEL AND CLEAR AREA SHALL <br />HAVE A LENGTH IN THE DIRECTION OF DOOR SWING OF AT LEAST 60 - <br />INCHES AND THE LENGTH OPPOSITE THE DIRECTION OF DOOR SWING <br />OF 44 - INCHES AS MEASURED AT RIGHT ANGLES TO THE PLANE OF THE <br />DOOR IN ITS CLOSED POSITION. <br />9. THE WIDTH OF THE LEVEL AREA ON THE SIDE TO WHICH THE DOOR <br />SWINGS SHALL EXTEND 24-INCHES PAST THE STRIKE EDGE OF THE <br />DOOR FOR EXTERIOR DOORS AND 18-INCHES PAST THE STRIKE EDGE <br />FOR THE INTERIOR DOORS. WHERE A DOOR IS REQUIRED TO BE <br />ACCESSIBLE IS LOCATED IN A RECESS OR ALCOVE WHERE THE DISTANCE <br />FROM THE FACE OF THE WALL TO THE FACE OF THE DOOR IS GREATER <br />THAN 8 INCHES, STRIKE SIDE CLEARANCE PER SECTION 11B-404.2.4 <br />SHALL BE PROVIDED. (2022 CBC 11B-404.2.4, 11B-404.2.4.3). <br />10. THE FLOOR OR LANDING SHALL BE NOT MORE THAN ½ - INCH LOWER <br />THAN THE THRESHOLD OF THE DOORWAY. CHANGE IN LEVEL BETWEEN <br />¼ - INCH AND ½ - INCH SHALL BE BEVELED WITH A SLOPE NO <br />GREATER THAN 1:2. (CBC 2022 404.2.5). <br />11. THE BOTTOM 10-INCHS OF ALL DOORS EXCEPT AUTOMATIC AND <br />SLIDING SHALL HAVE A SMOOTH UNITERRUPTED SURFACE TO ALLOW <br />THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST WITHOUT <br />CREATING A TRAP OR HAZARDOUS CONDITION. WHERE NARROW <br />FRAME DOORS ARE USED, A 10-INCH HIGH SMOOTH PANEL SHALL BE <br />INSTALLED ON THE PUSH SIDE OF THE DOOR, WHICH WILL ALLOW THE <br />DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST WITHOUT CREATING <br />A TRAP OR HAZARDOUS CONDITION. (2022 CBC 11B-404.2.10). <br />12. MAXIMUM EFFORT TO OPERATE INTERIOR AND EXTERIOR DOORS SHALL <br />NOT EXCEED 5 LBS. SUCH PULL OR PUSH EFFORT BEING APPLIED AT <br />RIGHT ANGLES TO HINGED DOORS AND AT THE CENTER PLANE OF <br />SLIDING OR FOLDING DOORS. COMPENSATING DEVICES OR <br />AUTOMATIC DOOR OPERATORS MAY BE UTILIZED TO MEET THE ABOVE <br />STANDARDS. WHEN FIRE DOORS ARE REQUIRED, THE MAXIMUM <br />EFFORT TO OPERATE THE DOOR MAY BE INCREASED TO THE MINIMUM <br />ALLOWED BY THE APPROPRIATE ADMINSTRATIVE AUTHORITY, NOT TO <br />EXCEED 15 LBS. (2022 CBC 11B-404.2.9). <br />13. FOR HINGED DOORS, THE OPENING WIDTH SHALL BE MEASURED WITH <br />THE DOOR POSITION AT AN ANGLE OF 90 DEGREES FROM THE CLOSED <br />POSITION. (2022 CBC 11B-404.2.3) <br />14. WHERE A PAIR OF DOORS IS UTILIZED, AT LEAST ONE OF THE DOORS <br />SHALL PROVIDE A CLEAR, UNOBSTRUCTED OPENING WIDTH OF 32" <br />WITH THE LEAF POSITIONED AT AN ANGLE OF 90 DEGREES FROM ITS <br />CLOSED POSITION. (2022 CBC 11B-404.2.2, 404.2.3) <br />15. MINIMUM MANEUVERING CLEARANCES AT DOORS SHALL BE AS <br />SHOWN IN FIGURE 11B-404.2.4.1. THE FLOOR OR GROUND AREA <br />WITHIN THE REQUIRED CLEARANCES SHALL BE LEVEL AND CLEAR. <br />(2022 CBC 11B-404.2.4, 404.2.4.4) <br />29. FIRE EXTINGUISHERS HAVING A GROSS WEIGHT NOT EXCEEDING 40 POUNDS <br />SHALL BE INSTALLED SO THAT THE TOP OF THE FIRE EXTINGUISHER IS NOT <br />MORE THAT 5 FEET ABOVE THE FLOOR. FIRE EXTINGUISHERS HAVING A <br />GROSS WEIGHT GREATER THAN 40 POUNDS (EXCEPT WHEELED TYPES) <br />SHALL BE SO INSTALLED THAT THE TOP OF THE FIRE EXTINGUISHER IS NOT <br />MORE THAN 3 1 <br />2 FEET ABOVE THE FLOOR. IN NO CASE SHALL THE CLEARANCE <br />BETWEEN THE BOTTOM OF THE EXTINGUISHER AND THE FLOOR BE LESS <br />THAN 4 INCHES. <br />30. WHEELED FIRE EXTINGUISHER SHALL BE CONSPICUOUSLY LOCATED IN A <br />DESIGNATED LOCATION. <br />31. PORTABLE FIRE EXTINGUISHER SHALL NOT BE OBSTRUCTED OR OBSCURED <br />FROM VIEW. IN ROOMS OR AREAS IN WHICH VISUAL OBSTRUCTION <br />CANNOT BE COMPLETELY AVOIDED, MEANS SHALL BE PROVIDED TO <br />INDICATE THE LOCATIONS OF EXTINGUISHERS. <br />32. CABINETS USED TO HOUSE PORTABLE FIRE EXTINGUISHERS SHALL NOT BE <br />LOCKED. <br />33. ONLY A CONTRACTORS STATE LICENSING BOARD LICENSED C-16 <br />CONTRACTOR SHALL INSTALL A FIRE SPRINKLER SYSTEM. <br />34. THE CONTRACTOR SHALL BE FAMILIAR WITH AND SHALL COMPLY WITH <br />CHAPTER 33 "FIRE SAFETY DURING CONSTRUCTION AND DEMOLITION," AND <br />CHAPTER 35 "WELDING AND OTHER HOT WORK" OF THE 2016 CALIFORNIA <br />FIRE CODE. <br />35. COMBUSTIBLE SCRAP MATERIALS AND SCRAP LUMBER SHALL BE PICKED UP <br />ON A DAILY BASIS, OR MORE FREQUENTLY, AS REQUIRED BY THE FIRE <br />DEPARTMENT. COMBUSTIBLE DEBRIS SHALL NOT BE ACCUMULATED WITH <br />BUILDINGS (CFC 3304.2) <br />36. OPEN BURNING IS PROHIBITED ANYWHERE ON THE SITE DURING <br />CONSTRUCTION, ALTERATION OR DEMOLITION (CFC 3304.3) <br />37. A FIRE DEPARTMENT FINAL INSPECTION IS REQUIRED. CONTACT THE COUNTY <br />FIRE PREVENTION DIVISION A MINIMUM OF 72 HOURS IN ADVANCE TO <br />SCHEDULE INSPECTIONS AND TESTS. <br />16. PROVIDE CLEAR SPACE OF 12" PAST STRIKE EDGE OF THE DOOR ON THE <br />OPPOSITE SIDE TO WHICH THE DOOR SWINGS IF THE DOOR IS <br />EQUIPPED WITH BOTH A LATCH AND A CLOSER. <br />17. WHERE THE DOOR OPENS INTO A STAIR OF A SMOKE PROOF <br />ENCLOSURE, THE LANDING NEED NOT HAVE A LENGTH OF 60". <br />18. WHEN THE DOOR HAS A CLOSER, THEN THE SWEEP PERIOD OF THE <br />CLOSER SHALL BE ADJUSTED SO THAT FROM AN OPEN POSITION OF 90 <br />DEGREES, THE TIME REQUIRED TO MOVE THE DOOR TO A POSITION OF <br />12 DEGREES FROM THE LATCH IS 5 SECONDS MINIMUM. (2022 CBC <br />11B-404.2.8.1) <br />19. ALL DOORS AND ALCOVES SHALL COMPLY WITH THE CLEARANCES FOR <br />FRONT APPROACHES. <br />20. PROVIDE TACTILE EXIT SIGN PER SECTION 11B-202.4 <br />21. ACCESSIBLE STALL IN MULTI-ACCOMMODATION TOILET FACILITIES <br />SHALL BE A MINIMUM OF 60" WIDE PER (2022 CBC 11B-213.2) <br />22. PROVIDE TACTILE EXIT SIGN PER SECTION 11B-202.4. <br />23. ACCESSIBLE STALL IN MULTI-ACCOMMODATION TOILET FACILITIES <br />SHALL BE A MINIMUM OF 60” WIDE PER (2022 CBC 11B-213.2). <br />AISLES <br />1. EVERY CORRIDOR SHALL BE AS SHOWN ON THE PLANS AND SHALL BE <br />DETERMINED AS PER CBC CHAPTER 10. <br />2. EVERY PORTION OF EVERY BUILDING IN WHICH ARE INSTALLED SEATS, <br />TABLES, MERCHANDISE, EQUIPMENT OR SIMILAR MATERIALS SHALL BE <br />PROVIDED WITH AISLES LEADING TO AN EXIT. (2022 CBC CHAPTER 10, <br />SECTION 1017) <br />NOTIFICATION APPLIANCES FOR THE HEARING IMPAIRED <br />1. APPROVED NOTIFICATION APPLIANCES FOR THE HEARING IMPAIRED <br />SHALL BE INSTALLED IN ACCORDANCE WITH THE PROVISIONS OF NFPA <br />72 AND CBC, CHAPTER 9, SECTION 907.9.1 AND 907.9.2 <br />2. STROBE SIGNALING DEVICES REQUIRED FOR THE HEARING IMPAIRED <br />SHALL BE STATE FIRE MARSHALL, NFPA 72: PER CHAPTER 6, SECTION <br />6-4, VISIBLE CHARACTERISTICS, PUBLIC MODE. <br />3. THE FLASH RATE SHALL NOT EXCEED 3 FLASHES PER SECOND NORBE <br />LESS THAN 1 FLASH EVERY THREE SECONDS NFPA 72: PER CHAPTER 6, <br />SECTION 6-4.2, LIGHT PULSE CHARACTERISTICS. <br />4. AUDIBLE SIGNALS INTENDED FOR OPERATION IN THE PUBLIC MODE <br />SHALL HAVE A SOUND LEVEL OF NOT LESS THATN 75 dBA AT 10' OR <br />MOREE THAN 130 dBA AT THE MINIMUM HEARING DISTANCE FROM <br />THE AUDIBLE APPLIANCE. NFPA 72: PER CHAPTER 6, SECTION 6-3, <br />AUDIBLE CHARACTERISTICS, PUBLIC MODE. <br />ACCESSIBLE DOORS <br />1. ACCESSIBLE ENTRANCES AND EXITS FROM A BUILDING MUST BE <br />PROVIDED, ACCORDING TO 2022 CBC. <br />2. MANEUVERING CLEARANCES AT DOORS SHALL BE LEVEL (1:50 MAX. <br />SLOPE) AND CLEAR IF DOORS ARE NOT AUTOMATIC OR POWER <br />ASSISTED. <br />3. GATES MUST MEET ACCESSIBLE REQUIREMENTS FOR DOORS. <br />4. PROVIDE ACCESSIBLE DOORS OR GATES ADJACENT TO REVOLVING <br />DOORS OR TURNSTILES. <br />5. DOUBLE LEAF DOORS SHALL HAVE AT LEAST THE ACTIVE LEAF MEET ALL <br />DOOR REQUIREMENTS. <br />6. ALL DOORS IN ALCOVES SHALL COMPLY WITH THE CLEARANCES FOR <br />FRONT APPROACHES. <br />STATE REQUIREMENTS <br />1. AT TIME OF PERMIT ISSUANCE, CONTRACTOR SHALL SHOW THEIR VALID <br />WORKERS' COMPENSATION INSURANCE CERTIFICATE. <br />2. ALL WORK SHALL CONFORM TO ALL REQUIREMENTS OF STATE OF <br />CALIFORNIA TITLE 24 REGARDLESS OF THE INFORMATION INDICATED ON <br />THESE PLANS. IT IS THE RESPONSIBILITY OF THE INDIVIDUAL SUPERVISING <br />THE CONSTRUCTION TO ENSURE THAT THE WORK IS DONE IN ACCORDANCE <br />WITH CODE REQUIREMENTS PRIOR TO REQUESTING INSPECTION. <br />3. EXCESS OR WASTE CONCRETE MAY NOT BE WASHED INTO THE PUBLIC WAY <br />OR ANY OTHER DRAINAGE SYSTEM. PROVISIONS SHALL BE MADE TO RETAIN <br />CONCRETE WASTES ON SITE UNTIL THEY CAN BE DISPOSED OF AS SOLID <br />WASTE. <br />4. SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) SHALL <br />NOTIFIED IN ACCORDANCE WITH CALIFORNIA STATE LAW PRIOR TO START OF <br />ANY DEMOLITION, ADDITION, AND/OR REMODEL WORK. THE SOUTH COAST <br />AIR QUALITY MANAGEMENT DISTRICT OFFICE IS LOCATED AT 21865 COPLEY <br />DRIVE, DIAMOND BAR, CA. PHONE NO. (909) 396-2000. BE ADVISED, <br />SCAQMD MAY REQUIRE A 10 DAY WAIT PERIOD PRIOR TO START OF WORK. <br />5. SEDIMENTS AND OTHER MATERIALS MAY NOT BE TRACKED FROM THE SITE <br />BY VEHICLE TRAFFIC. THE CONSTRUCTION ENTRANCE ROADWAYS MUST <br />STABILIZE SO AS TO INHIBIT SEDIMENTS FROM BEING DEPOSITED INTO THE <br />PUBLIC WAY. ACCIDENTAL DEPOSITIONS MUST BE SWEPT UP IMMEDIATELY <br />AND MAY NOT BE WASHED DOWN BY RAIN OR OTHER MEANS. <br />6. STOCKPILES OF EARTH AND OTHER CONSTRUCTION RELATED MATERIALS <br />MUST BE PROTECTED FROM BEING TRANSPORTED FROM THE SITE BY <br />FORCES OF WIND OR WATER. <br />7. TRASH AND CONSTRUCTION RELATED SOLID WASTES MUST BE DEPOSITED <br />INTO A COVERED RECEPTACLE TO PREVENT CONTAMINATION OF RAINWATER <br />AND DISPERSAL BY WIND. <br />8. FUELS, OILS, SOLVENTS AND OTHER TOXIC MATERIALS MUST BE STORED IN <br />ACCORDANCE WITH THEIR LISTING AND ARE NOT TO CONTAMINATE THE SOIL <br />AND SURFACE WATERS. ALL APPROVED STORAGE CONTAINERS ARE TO BE <br />PROTECTED FROM THE WEATHER. SPILLS MUST BE CLEANED UP <br />IMMEDIATELY AND DISPOSED OF IN A PROPER MANNER. SPILLS MAY NOT <br />BE WASHED INTO THE DRAINAGE SYSTEM. <br />CITY BUILDING DEPT. NOTES <br />1. THE ISSUANCE OF A PERMIT SHALL NOT PREVENT THE BUILDING OFFICIAL <br />FROM REQUIRING THE CORRECTION OF ERRORS ON THESE PLANS OR FROM <br />PREVENTING ANY VIOLATION OF THE CODES ADOPTED BY THE CITY, RELEVANT <br />LAWS, ORDINANCES, RULES AND/OR REGULATIONS. <br />2. PLUMBING FIXTURES SHALL HAVE THE FOLLOWING MAX. FLOW RATES: <br />LAVATORY FAUCETS - 0.4 GPM; KITCHEN FAUCETS - 1.8 GPM; WATER <br />CLOSETS - 1.28 GPF. <br />A.1.0 SITE PLAN <br />T-24.0 TITLE-24 DOCUMENTS <br />T-24.1 TITLE-24 DOCUMENTS <br />A FOR PERMIT <br />A.1.2 AS-BUILT DEMOLITION PLAN <br />CONSULTANTS <br />· CITY OF SANTA ANA PLANNING DIVISION <br />· CITY OF SANTA ANA BUILDING DEPARTMENT <br />· ORANGE COUNTY FIRE AUTHORITY <br />· ORANGE COUNTY SANITATION <br />JURISDICTIONAL APPROVAL <br />PARKING CALCULATIONS <br />CO2 GAS DETECTION SYSTEM <br />UNDER SEPARATE APPLICATION AND <br />PERMIT. <br />CO2 ENRICHMENT NOTES <br />CO2 STORAGE AND DISTRIBUTION / <br />ENRICHMENT PLAN <br />UNDER SEPARATE APPLICATION AND <br />PERMIT. <br />1. CO2 ENRICHMENT WILL BE CONDUCTED ON THESE PREMISES WITHIN THE CULTIVATION ROOMS. CO2 WILL BE STORED AT THE EXTERIOR OF THE BUILDING IN LIQUID <br />FORM WITHIN A FIXED TANK DESIGNED FOR THIS PURPOSE (SEE A.1.0 SITE PLAN, KEYNOTE 'F'). LIQUID CO2 IS CONVERTED TO GAS AT THE EXTERIOR OF THE BUILDING <br />AND DISTRIBUTED TO THE CULTIVATION ROOMS WITHIN THE BUILDING. THE CO2 ENRICHMENT OPERATIONS WILL BE CONTROLLED USING A MONITORING AND <br />CONTROL SYSTEMS DESIGNED FOR THIS PURPOSE. A SEPARATE CO2 DETECTION AND ALARM SYSTEM IS PROVIDED PER FIRE CODE REQUIREMENTS. <br />2. THE STORAGE, USE AND HANDLING OF COMPRESSED GASSES IN COMPRESSED GAS CONTAINERS, CYLINDERS, TANKS AND SYSTEMS SHALL COMPLY WITH THE FIRE <br />CODE CHAPTER 53 AND NFPA 55. <br />3. COMPRESSED GAS CYLINDERS SHALL BE CLEARLY MARKED WITH THE NAME OF THE GAS CONTAINED THEREIN. FIRE CODE 5301.1 CYLINDERS CONTAINING CARBON <br />DIOXIDE SHALL BEAR GRAY COLOR MARKINGS AND LABELS. <br />4. A GAS DETECTION SYSTEM SHALL BE PROVIDED TO MONITOR AREAS WHERE CO2 CAN ACCUMULATE. THE SYSTEM SHALL BE SESIGNED TO INITIATE A LOCAL AUDIBLE <br />AND VISIBLE ALARM IN THE ROOM OR AREA IN WHICH THE SENSOR IS INSTALLED WHEN THE LEVEL OF CO2 EXCEEDS 5,000 PPM. FIRE CODE 5307.5.2 <br />5. INDOOR STORAGE AND USE AREAS AND STORAGE BUILDINGS SHALL BE PROVIDED WITH VENTILATION IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 5004.3. <br />WHERE MECHANICAL VENTILATION IS PROVIDED, THE SYSTEMS SHALL BE OPERATIONAL DURING SUCH TIME AS THE BUILDING OR SPACE IS OCCUPIED. EXCEPTION: A <br />GAS DETECTION SYSTEM COMPLYING WITH SUBSECTION (I.5) SHALL BE PERMITTED IN LIEU OF MECHANICAL VENTILATION. FIRE CODE 5307.5.1 <br />HAZARDOUS MATERIALS DECLARATION <br />THIS BUILDING WILL USE CARBON DIOXIDE IN THE AMOUNT OF 8 TONS (MAX.), <br />WHICH IS IN EXCESS OF NON-REPORTABLE AMOUNTS OF HAZARDOUS <br />MATERIALS. <br />CULTIVATION RUN-OFF STATEMENT <br />THE PROPOSED GROW MEDIA (POTTING MATERIAL) FOR THIS FACILITY IS ROCK <br />WOOL ONLY. NOT SOIL OR PARTICULATE WILL BE INCLUDED IN THE RUN-OFF <br />LIQUID. <br />N E W F L O W E R R O O M <br />CANNABIS PRODUCTS STATEMENT <br />THE PURPOSE OF THIS PROPOSED FACILITY WILL BE TO GROW AND TRIM BULK <br />CANNABIS FLOWER ONLY AND THE RETAIL SALES OF CANNABIS. <br />BUILDING AREA <br />A. CONSTRUCTION TYPE (CHAPTER 6):III-B <br />B. FULLY SPRINKLERED (CHAPTER 9):NO <br />C. ALLOWABLE (CHAPTER 5) <br />C.A. ALLOWABLE STORIES (TABLE 504.4)2 <br />C.B. ALLOWABLE HEIGHT (TABLE 504.3)55 FT. <br />C.C. ALLOWABLE FLOOR AREA (TABLE 506.2) <br />M OCC.: 12,500 SF <br />B OCC: 19,000 SF <br />F-1 OCC: 12,500 SF <br />D. ACTUAL: <br />D.A. ACTUAL STORIES 1 <br />D.B. ACTUAL HEIGHT 19'-2" AFG <br />D.C. ACTUAL FLOOR AREA (TOTAL) <br />M OCC. : 2,910 SF. <br />F-1 OCC.: 7,490 SF. <br />NOTE: SEE A.1.3 FOR SF TOTALS, OCCUPANCIES AND FIRE SEPARATION ANALYSIS. <br />NOTE: DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE DESIGN AND SUBMITTED DOCUMENTS HAVE BEEN APPROVED <br />BY THE BUILDING DIVISION. <br />NEW FLOWER <br />R O O M <br />1821 NEWPORT CIRCLE <br />SANT A A NA, CA 92  05 <br />3419 Via Lido, Ste. 225 <br />Newport Beach, CA 92663 <br />949.500.9416 www.intrepid-group.net <br />MEP ENGINEER <br />BF CONSULTING <br />12200 STAGG STREET <br />NORTH HOLLYWOOD, CA 91605 <br />818-795-3487 <br />A.1.0a (E) FIRE MASTER PLAN (FOR REFERENCE ONLY) <br />A6.2 DETAILS <br />ACS.0 <br />S1 STRUCTURAL PLAN <br />SCOPE OF WORK <br />TENANT IMPROVEMENT. CONVERSION OF PART OF THE EXISTING RETAIL USE TO A <br />CANNABIS FLOWER ROOM. <br />E1-0 ELECTRICAL LEGEND-NOTES-SYMBOLS <br />E2-0 ELECTRICAL POWER PLAN <br />E3-0 ELECTRICAL LIGHTING PLAN <br />E3-1 ELECTRICAL GROW LIGHTING PLAN <br />E4-0 ELECTRICAL ROOF PLAN <br />E5-0 ELECTRICAL FIXTURE SCHEDULE <br />E6-0 ELECTRICAL SINGLE LINE DIAGRAM <br />E7-0 ELECTRICAL PANEL SCHEDULE <br />E8-0 ELECTRICAL SPECIFICATIONS <br />E9-0 ELECTRICAL DETAILS <br />E10-0 ELECTRICAL TITLE-24 <br />M1-0 MECHANICAL LEGEND-NOTES-SYMBOLS <br />M1-1 MECHANICAL EQUIPMENT SCHEDULES <br />M2-0 MECHANICAL FLOOR PLAN <br />M2-1 MECHANICAL EQUIPMENT PLAN <br />M3-0 MECHANICAL ROOF PLAN <br />M4-0 MECHANICAL DETAILS <br />M4-1 MECHANICAL DETAILS <br />P1-0 PLUMBING LEGEND NOTES SCHEDULES <br />P2-0 PLUMBING WASTE AND VENT <br />P2-1 PLUMBING WATER PLAN <br />P3-0 PLUMBING DETAILS <br />B PCC-1 <br />GROW ROOM RACKING SYSTEM <br />UNDER SEPARATE APPLICATION AND <br />PERMIT. <br />B <br />B <br />APPROVALS: <br /> <br />Bldg #101120205 <br />PLNG - C. Santana <br />BLDG - A. So <br />POLICE - B. Martin <br />PUBLIC WORKS - B. Sarlak <br /> <br />Elect #20183508 <br />M. Smith <br /> <br />Plumb #30147555 <br />T. Luka <br /> <br />Mech #40139341 <br />T. Luka <br />1821 E Newport Cir <br />12/23/2024