GENERAL NOTES ABBREVIATIONS PROJECT INFORMATION SHEET INDEX
<br />SHEET NO. TITLE
<br />ACS.0 COVER SHEETAFF ABOVE FINISH FLOOR
<br />AD ACCESS DOOR
<br />AP ACCESS PANEL
<br />ACOUSE (ACST) ACOUSTIC
<br />A/L ALTERNATE
<br />A/C AIR CONDITIONING
<br />ALLUM (AL) ALLUMINUM
<br />APPD APPROVED
<br />APPROX APPROXIMATE
<br />ARCH ARCHITECTURAL
<br />ASPH ASPHALT
<br />AUTO AUTOMATIC
<br />BOW BACK OF WALL
<br />BATT INSUL BATTEN INSULATION
<br />BM BEAM
<br />BD, BRD BOARD
<br />BLDG BUILDING
<br />CAB CABINET
<br />CLG CEILING
<br />CTR CENTER
<br />CL CENTER LINE
<br />CC CENTER TO CENTER
<br />CFCI CONTRACTOR
<br />FURNISHED
<br />CONTRACTOR INSTALLED
<br />CT CIRCULAR TILE
<br />CIR CIRCULAR
<br />CLR CLEAR, COLOR
<br />CLO CLOSET
<br />COL COLUMN
<br />CONC CONCRETE
<br />CONN CONSTRUCTION
<br />CONT CONTINUOUS
<br />CJ CONTROL JOINT
<br />CORR CORRIDOR
<br />CNTR COUNTER
<br />DET (DETI.) DETAIL
<br />DIAG DIAGONAL
<br />DIA DIAMETER
<br />DIM DIMENSION
<br />DISP DISPENSER
<br />DR DOOR
<br />DBL DOUBLE
<br />DN DOWN
<br />DWR DRAWER
<br />DWG DRAWING
<br />DF DRINKING FOUNTAIN
<br />EA EACH
<br />ELEC ELECTRICAL OR ELECTRIC
<br />EL, ELEV ELEVATION
<br />EMERG EMERGENCY
<br />ENCL ENCLOSURE
<br />EQUIP (EQPT)EQUIPMENT
<br />EQ EQUAL
<br />EW EACH WAY
<br />EXH EXHAUST
<br />EXIST. EXISTING
<br />EXT EXTERIOR
<br />FOC FACE OF CONCRETE
<br />FOF FACE OF FINISH
<br />FOS FACE OF STUDS
<br />FOW FACE OF WALL
<br />FT FEET
<br />FIN FINISH
<br />FE (FEXT) FIRE EXTINGUISHER
<br />FEC FIRE EXTINGUISHER
<br />CABINET
<br />FES FIRE EXTINGUISHER
<br />SURFACE
<br />MOUNTED
<br />FIXT FIXTURE
<br />FLR OR FL FLOOR
<br />FD FLOOR DRAIN
<br />FLOUR FLOURESCENT
<br />FR FRAME
<br />FURG FURRING
<br />GA GAGE OR GUAGE
<br />GALV GALVINIZED
<br />GI GALVINIZED IRON
<br />G GAS
<br />GL GLASS
<br />GB GRAB BAR
<br />GR GRADE
<br />GND GROUND
<br />GYP GYPSUM
<br />GYP BD GYPSUM WALLBOARD
<br />GC GENERAL CONTRACTOR
<br />HDR HANDRAIL
<br />HBD HARDBOARD
<br />HDW (HW) HARDWARE
<br />HDWD HARDWOOD
<br />H/C HANDICAPPED
<br />HD HEAD
<br />HDR HEADER
<br />HTR HEATER
<br />HT (HGT) HEIGHT
<br />H.P. HIGH POINT
<br />HC HOLLOW CORE
<br />H.M. HOLLOW METAL
<br />HMI HOLLOW METAL
<br />INSULATED
<br />HORIZ HORIZONTAL
<br />HR HOUR
<br />IN. INCH
<br />I.D. INSIDE DIAMETER
<br />IDENT IDENTIFICATION
<br />INSUL INSULATION
<br />INT (INTR) INTERIOR
<br />JAN JANITOR
<br />JT JOINT
<br />JST JOIST
<br />K KEY
<br />KL KEY LOCK
<br />KP KICK PLATE
<br />KIT KITCHEN
<br />LAB LABORATORY
<br />LAM LAMINATE
<br />LAV LAVATORY
<br />LT LIGHT
<br />LTG LIGHTING
<br />LT WT LIGHT WEIGHT
<br />LIN LINEAR
<br />LONG LONGITUDINAL
<br />LP LOW POINT
<br />LKR LOCKER
<br />LVR LOUVER
<br />MACH MACHINE
<br />MAINT MAINTENANCE
<br />MFR MANUFACTURE
<br />MFG MANUFACTURING
<br />MSTC MASIC
<br />MATL MATERIAL
<br />MAX MAXIMUM
<br />MECH MECHANICAL
<br />MTL METAL
<br />MT METAL THRESHOLD
<br />MIN MINIMUM
<br />MIR MIRROR
<br />MISC MISCELLANEOUS
<br />MLDG MOLDING
<br />MTD MOUNTING
<br />MUL MULLION
<br />N NORTH
<br />NIC NOT IN CONTRACT
<br />NO. (#) NUMBER
<br />NTS NOT TO SCALE
<br />OFF. OFFICE
<br />OFCI OWNER FURNISHED
<br />CONTRACTOR INSTALLED
<br />OC ON CENTER
<br />OPP OPPOSITE
<br />O.H. OVERHEAD
<br />O/ OVER
<br />PR PAIR
<br />PNL PANEL
<br />PTD PAPER TOWEL
<br />DISPENSER
<br />PTD/R PAPER TOWEL
<br />DISPENSER &
<br />RECEPTACLE
<br />PTR PAPER TOWEL
<br />RECEPTACLE
<br />PRTN PARTITION
<br />PERF PERFORATED
<br />PLAST PLASTER
<br />PLAS PLASTIC
<br />PL PLATE
<br />PLBG PLUMBING
<br />PLYWD PLYWOOD
<br />PT POINT
<br />LBS POUNDS
<br />PSF POUND/SQUARE FOOT
<br />PSI POUND/SQUARE INCH
<br />PRECST PRECAST
<br />PREFAB PREFABRICATED
<br />PROJ PROJECTION
<br />Q.T. QUARRY TILE
<br />¼ RD QUARTER ROUND
<br />QTRS QUARTERS
<br />RAD RADIUS
<br />RECP RECEPTABLE
<br />REF REFERENCE
<br />REFR REFRIGERATOR
<br />REINF REINFORCEMENT
<br />REQD REQUIRED
<br />REV REVISIONS
<br />R RISER
<br />RM ROOM
<br />RND ROUND
<br />RUB RUBBER
<br />RB RUBBER BASE
<br />SND SANITARY NAPKIN
<br />DISPENSER
<br />SNR SANITARY NAPKIN
<br />RECEPTICLE
<br />SCH SCHEDULE
<br />SCD SEAT COVER DISPENSER
<br />SECT SECTION
<br />SSK SERVICE SINK
<br />SHTHG SHEATHING
<br />SHT SHEET
<br />SHWR SHOWER
<br />SIM SIMILAR
<br />SD SOAP DISPENSER
<br />SC SEPARATE CIRCUIT
<br />S.M. SHEET METAL
<br />S SOUTH
<br />SPKR SPEAKER
<br />SPEC SPECIFICATION
<br />SQ SQUARE
<br />STD STANDARD
<br />STA STATION
<br />STL STEEL
<br />STOR STORAGE
<br />STRL STRUCTURAL
<br />SUSP SUSPENDED
<br />SYM SYMMETRICAL
<br />TEL TELEPHONE
<br />TV TELEVISION
<br />TEMP TEMPERATURE
<br />TER TERRAZZO
<br />THERMO THERMOSTAT
<br />THK THICK
<br />TH THRESHOLD
<br />TOIL TOILET
<br />TPD TOILET PAPER
<br />DISPENSER
<br />TOC TOP OF CONCRETE
<br />TC TOP OF CURB
<br />TOS TOP OF STEEL
<br />TS TUBULAR STEEL
<br />TW TOP OF WALL
<br />TB TOWEL BAR
<br />TRANS TRANSVERSE
<br />TYP TYPICAL
<br />UL UNDERWRITERS
<br />LABORATORIES
<br />UNFIN UNFINISHED
<br />UNO UNLESS NOTED
<br />OTHERWISE
<br />UR URINAL
<br />VERT VERTICAL
<br />VEST VESTIBULE
<br />VCT VINYL COMP TILE
<br />VT VINYL TILE
<br />VWC VINYL WALL COVERING
<br />WNSCT WAINSCOT
<br />WC WATER CLOSET
<br />WP WATER PROOF
<br />W/R WATER RESISTANT
<br />WT WEIGHT
<br />WDT WIDTH
<br />WDW WINDOW
<br />W/ WITH
<br />W/O WITHOUT
<br />WD WOOD
<br />SITE
<br />LOCATION
<br />T E N A N T I M P R O V E M E N T O F
<br />1 8 2 1 N E W P O R T C I R C L E
<br />S A N T A A N A , C A
<br />STRUCTURAL ENGINEER
<br />GET STRUCTURAL ENGINEERING
<br />3000 E. BIRCH STREET, SUITE 203
<br />BREA, CA 92821
<br />PROJECT
<br />SCOPE OF WORK: TENANT IMPROVEMENT OF AN EXISTING
<br />1-STORY COMMERCIAL BUILDING. CONVERSION OF
<br />PART OF EXISTING RETAIL AREA TO NEW CANNABIS
<br />FLOWER ROOM.
<br />ADDRESS: 1821 NEWPORT CIRCLE, SANTA ANA, CA 92705
<br />AIN: 403-071-04
<br />OCCUPANCY TYPE: F-1, M (SEE FLOOR PLAN FOR TABULATIONS)
<br />TOTAL GROSS FLOOR AREA: 10,400 S.F.
<br />CONSTRUCTION
<br />CONSTRUCTION TYPE: IIIB
<br />FIRE SPRINKLERS: NO
<br />FIRE ALARM: NO
<br />PROPERTY OWNER
<br />NAME SANTA ANA VENTURES, INC.
<br />ADDRESS:1821 E. NEWPORT CIRCLE
<br />SANTA ANA, CA 92705
<br />ZONING
<br />EXISTING USE: CANNABIS DISPENSARY AND CANNABIS CULTIVATION
<br />PROPOSED USE: CANNABIS DISPENSARY AND CANNABIS CULTIVATION.
<br />A
<br />1 COLUMN GRID
<br />XXX
<br />X
<br />REVISION CLOUD & DELTA
<br />1
<br />ALIGN FACE OF NEW
<br />CONSTRUCTION WITH EXISTING
<br />NIC (NOT IN CONTRACT)
<br />BUILDING
<br />STANDARD DOOR
<br />100.1
<br />DOOR NUMBER, REFER
<br />TO DOOR SCHEDULE
<br />&
<br />OFFICE ROOM NAME
<br />ROOM NUMBER
<br />DETAIL NUMBER
<br />SHEET NUMBER
<br />ELEVATION NUMBER
<br />SHEET NUMBER
<br />ENLARGED PLAN
<br />AREA TO BE ENLARGED
<br />SHEET NUMBER
<br />+9'-0"
<br />INDICATES CEILING
<br />HEIGHT, AFF
<br />(E)
<br />(N)
<br />(R)
<br />INDICATES EXISTING ITEM
<br />TO REMAIN
<br />INDICATES NEW ITEM
<br />INDICATES RELOCATED ITEM
<br />XXX
<br />X
<br />CT-31
<br />4" Radius Cove INDICATES FINISH CODE,
<br />REFERENCE FINISH LEGEND
<br />INDICATES SPECIAL
<br />INSTRUCTIONS FOR FINISHES5
<br />A.X.X
<br />SYMBOLS
<br />VACINITY MAP
<br />DEFERRED SUBMITTALS
<br />PARKING (NO CHANGE TO PARKING)
<br />EXISTING STANDARD PARKING SPACES : 14
<br />EXISTING ACCESSIBLE PARKING SPACES (CBC TABLE 11B-208.2): 1
<br />SHEET NUMBER:
<br />REVISIONS
<br />COVER SHEET
<br />SHEET NAME:
<br />PREPARED BY:
<br />OWNER:
<br />PROJECT:
<br />STAMP:JOB NUMBER:
<br />XXXXX
<br />DATE:
<br />00.00.00
<br />CONSULTANT:
<br />DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN
<br />CONSTITUTE ORIGINAL AND UNPUBLISHED WORK OF PD&C, INC.
<br />dba RAND KRUSE AND MAY NO BE DUPLICATED, USED OR
<br />DISCLOSED WITHOUT WRITTNE CONSENT OF PD&C, INC. dba
<br />RAND KRUSE.
<br />SANTA ANA VENTURES, INC.
<br />1821 E. NEWPORT CIRCLE
<br />SANTA ANA, CA 9205
<br />ACS.1 NOTES AND CAL GREEN
<br />A.1.1 ROOF PLAN
<br />A.1.3 FLOOR PLAN
<br />A.2.0 CEILING PLAN
<br />A5.0 SCHEDULES
<br />A.1.4 EXIT ANALYSIS
<br />A6.0 DETAILS
<br />A6.1 DETAILS
<br />GENERAL NOTES
<br />FIRE DEPARTMENT NOTES
<br />ACCESSIBILITY NOTES
<br />FIRE DEPARTMENT NOTES (CONT.) ACCESSIBILITY NOTES (CONT.)
<br />1. GENERAL CONTRACTOR (G.C.) TO VERIFY AND REVIEW ALL JOB
<br />CONDITIONS, DIMENSIONS AND DETAILS PRIOR TO BIDDING, PRICING AND
<br />CONSTRUCTION TO DETERMINE WHICH NOTES APPLY DIRECTLY TO HIS
<br />RESPONSIBILITY. G.C. TO MAKE NOTE OF AND SUBMIT IN WRITTEN FORM
<br />TO PD&C, INC. dba INTEREPID GROUP ANY DAMAGES OR DEFICIENCIES ON
<br />PREMISES AND ANY CONFLICTS AND DISCREPANCIES REGARDING
<br />DIMENSIONS, NOTES OR SPECIFICATIONS.
<br />2. ALL WORK SHOWN OR IMPLIED, UNLESS SPECIFICALLY QUESTIONED, SHALL
<br />BE CONSIDERED FULLY UNDERSTOOD IN ALL RESPECTS BY THE GENERAL
<br />CONTRACTOR AND WILL BE SOLELY RESPONSIBLE FOR ANY
<br />MISINTERPRETATIONS OR CONSEQUENCES THEREOF FOR ALL WORK ON
<br />DRAWINGS.
<br />3. DRAWINGS ARE NOT TO BE SCALED. DIMENSIONS GOVERN. LARGE SCALE
<br />DRAWINGS GOVERN OVER SMALL SCALE DRAWINGS. CONTRACTOR SHALL
<br />VERIFY ALL CONDITIONS AND DIMENSIONS @ JOB SITE PRIOR TO START OF
<br />CONSTRUCTION. IF DISCREPANCIES ARE FOUND, PD&C, INC. dba
<br />INTEREPID GROUP SHALL BE NOTIFIED FOR CLARIFICATION.
<br />4. ALL DRAWINGS AND NOTES ARE COMPLEMENTARY TO ANY WORK SHOWN
<br />OR REFERENCED TO ON ANY ONE DRAWING SHALL BE PROVIDED AS
<br />THOUGH SHOWN ON ALL RELATED DRAWINGS.
<br />5. GENERAL CONTRACTOR SHALL COMPLY WITH ALL RULES AND REGULATIONS
<br />OF BUILDING MANAGEMENT IN ALL RESPECTS. IT IS THE G.C.
<br />RESPONSIBILITY TO OBTAIN SUCH REGULATIONS FROM THE BUILDING
<br />OWNER AND PROVIDE FOR REVIEW BY ALL SUBTRADES. G.C. TO NOTIFY
<br />PD&C, INC. dba INTEREPID GROUP OF ANY CONFLICT BETWEEN
<br />REGULATIONS AND OTHER CONTRACTUAL DOCUMENTS, PRIOR TO
<br />PROCEEDING WITH ANY OTHER WORK.
<br />6. ALL WORK TO BE PERFORMED IN OCCUPIED AREAS OR IN OTHER TENANT
<br />SPACES SHALL BE PERFORMED ON OVERTIME, AS REQUIRED, AND BY
<br />BUILDING RULES AND REGULATIONS.
<br />7. GENERAL CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF
<br />ALL WORK REQUIRED TO MAKE ALL PARTS COME TOGETHER PROPERLY AND
<br />FIT TO RECEIVE OR BE RECEIVED BY WORK OF OTHER CONTRACTORS
<br />IMPLIED BY DRAWING OR NOTES.
<br />8. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR USE, SCHEDULING AND
<br />FEES INCURRED BY HOISTING FACILITIES/ELEVATORS.
<br />9. ALL WORK IS TO CONFORM TO PD&C, INC. dba INTEREPID GROUP
<br />DRAWINGS AND SPECIFICATIONS AND SHALL BE NEW AND OF THE BEST
<br />QUALITY OF KINDS SPECIFIED. ALL MANUFACTURED ARTICLES TO BE
<br />INSTALLED, CONNECTED AND CONDITIONED AS DIRECTED BY
<br />MANUFACTURER. ALL WORK TO BE PERFORMED IN A GOOD
<br />WORKMANSHIP MANNER.
<br />10. ALL SUBCONTRACTORS SHALL BE RESPONSIBLE FOR REVIEWING ENTIRE SET
<br />OF DRAWINGS AND NOTING THEIR WORK AS APPLICABLE. ALL SHOP
<br />DRAWINGS SHALL BE SUBMITTED TO PD&C, INC. dba INTEREPID GROUP
<br />FOR APPROVAL THROUGH G.C. PRIOR TO COMMENCEMENT OF ANY WORK.
<br />11. GENERAL CONTRACTOR TO BE SOLELY RESPONSIBLE FOR REMOVAL,
<br />REPLACEMENT AND RECTIFICATION OF ALL DAMAGED AND DEFECTIVE
<br />MATERIAL AND/OR WORKMANSHIP IN CONNECTION WITH THE CONTRACT
<br />WORK. ANY COSTS CAUSED BY DEFECTIVE OR ILL-TIMED WORK, POOR
<br />WORKMANSHIP, MATERIALS, POOR SCHEDULING OR DELINQUENT
<br />ORDERING SHALL BE BORNE BY THE GENERAL CONTRACTOR.
<br />12. DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION ALL
<br />REQUIRED EXITS SHALL BE MAINTAINED. EXIT LIGHTING AND FIRE
<br />PROTECTIVE SERVISES SHALL BE PROPERLY MAINTAINED. ALL WAYS OF
<br />TRAVEL FROM EXITS TO THE STREET SHALL BE MAINTAINED FREE FROM ALL
<br />OBSTRUCTIONS.
<br />13. GENERAL CONTRACTOR SHALL PROPERLY PROTECT THE BUILDING AND ANY
<br />OTHER ADJOINING PROPERTY OR WORK AND PROTECT ALL EXISTING
<br />SURFACED OR FINISHED TO REMAIN DURING DEMOLITION AND
<br />CONSTRUCTION. ANY DAMAGE TO THE SAME SHALL BE REPAIRED BY G.C.
<br />AT HIS EXPENSE TO “LIKE NEW” CONDITION.
<br />14. GENERAL CONTRACTOR SHALL VERIFY ALLOWED WORKING HOURS FOR ALL
<br />WORK DONE TO THE CORE (INCLUDING DRILLING, PATCHING, AND
<br />ELECTRICAL HOOKUPS) AND IS RESPONSIBLE FOR ALL WORK NECESSARY
<br />TO COMPLETE WORK TO THE CORE AND IN NON-LEASE SPACE.
<br />15. GENERAL CONTRACTOR IS RESPONSIBLE TO CLEAN UP AND REMOVE ALL
<br />WASTE MATERIALS FROM PREMISES AS GENERATED BY CONSTRUCTION
<br />DEMOLITION, WOODWORK AND ALL TRADES EMPLOYED BY CONTRACTUAL
<br />WORK.
<br />16. ALL WORK NOTED N.I.C. OR “BY TENANT” IS TO BE ACCOMPLISHED BY
<br />PERSONS OTHER THAN G.C. AND IS NOT PART OF CONSTRUCTION
<br />AGREEMENT.
<br />17. GENERAL CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED
<br />PERMITS FROM BUILDING DEPARTMENT AND FORWARD COPIES TO PD&C,
<br />INC. dba INTEREPID GROUP.
<br />18. GENERAL CONTRACTOR TO PROVIDE CONSTRUCTION SCHEDULE BY THE
<br />START OF CONSTRUCTION AND A LIST OF A LONG LEAD ITEMS BY THE END
<br />OF THE FIRST WEEK OF CONSTRUCTION.
<br />19. GENERAL CONTRACTOR TO SUBMIT IN WRITING ALL CHANGE ORDERS FOR
<br />ADDITIONAL WORK TO OWNER FOR REVIEW AND APPROVAL. NO WORK IS
<br />TO PROCEED UNTIL A SIGNED PROPOSAL IS RETURNED TO G.C. UNLESS
<br />OTHEWISE NOTED. ALL CHANGES IN THIS FIELD SHALL BE SIGNED BY THE
<br />CLIENT OR AUTHORIZED REPRESENTATIVE.
<br />20. UPON COMPLETION OF THE WORK, THE G.C. SHALL SUBMIT TO OWNER:
<br />A. COPY OF INSPECTIONS AND FINAL SIGN-OFF.
<br />B. CERTIFICATE OF SUBSTANTIAL COMPLETION (AIA DOCUMENT #G704).
<br />C. COPY OF PERMIT CARD.
<br />D. BUILDING DEPARTMENT APPROVED DRAWINGS.
<br />E. WARRANTIES FOR SPECIFIED MATERIALS.
<br />F. RECORD/AS-BUILT DOCUMENTS.
<br />21. ALL WORK SHALL COMPLY WITH THE REGULATIONS OF THE GOVERNMENTAL
<br />AUTHORITIES HAVING JURISDICTION. THE SPECIFICATIONS SHALL BE
<br />SUPPLEMENTAL TO ALL LAWS AND CODES OF GOVERNMENTAL REGULATING
<br />BODIES RELATING TO BUILDINGS, AND ALL APPLICABLE REQUIREMENTS
<br />SPECIFIED IN THESE REGULATIONS SHALL BE FOLLOWED AS THOUGH
<br />SPECIFICALLY NOTED BY SUCH CODES AS LAWS. IT IS THE G.C.
<br />RESPONSIBILITY TO NOTIFY PD&C, INC. dba INTEREPID GROUP OF ANY
<br />CONFLICTS BETWEEN THESE DRAWINGS AND LOCAL BUILDING CODES. G.C.
<br />TO PROVIDE A SEPARATE PRICE IN THE BID FOR EACH ITEM THAT REQUIRES
<br />CHANGING MODIFYING OR REMOVAL.
<br />22. APPLICABLE CODES
<br /> THIS PROJECT SHALL CONFORM TO:
<br />2022 CALIFORNIA ADMINSTRATIVE CODE - (PART 1, TITLE 24 CCR)
<br />2022 CALIFORNIA BUILDING CODE - (PART 2, TITLE 24, CCR)
<br />2022 CALIFORNIA ELECTRICAL CODE - (PART 3 TITLE 24, CCR)
<br />2022 CALIFORNIA MECHANICAL CODE - (PART 4, TITLE 24, CCR)
<br />2022 CALIFORNIA PLUMBING CODE - (PART 5, TITLE 24, CCR)
<br />2022 CALIFORNIA ENERGY CODE - (PART 6, TITLE 24, CCR)
<br />2022 CALIFORNIA ELEVATOR SAFETY CONSTRUCTION CODE - (PART 7,
<br />TITLE 24 CCR)
<br />2022 CALIFORNIA HISTORICAL CODE - (PART 8, TITLE 24)
<br />2022 CALIFORNIA FIRE CODE - (PART 9, TITLE 24, CCR)
<br />2022 CALIFORNIA EXISTING BUILDING CODE - (PART 10, TITLE 24 CCR)
<br />2022 CALIFORNIA REFERENCED STANDARDS - (PART 12, TITLE 24, CCR)
<br />2022 AMERICANS WITH DISABILITIES ACT (ADA)
<br />23. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND FIELD CONDITIONS BEFORE
<br />PROCEEDING WITH WORK.
<br />24. ALL CONTRACTORS AND SUBCONTRACTORS ARE RESPONSIBLE FOR
<br />CONFORMING TO ALL APPLICABLE LOCAL CODES AND TRADE STANDARDS.
<br />25. CONTRACTOR TO REWORK SPRINKLERS, FIRE SAFETY SYSTEM REQUIREMENTS,
<br />SWITCHING, EXIT SIGNS AND HVAC SYSTEM AS REQUIRED.
<br />26. PD&C, INC. dba INTREPID GROUP IS UNAWARE OF ANY EXISTING ASBESTOS
<br />WITHIN THE AREA OF NEW WORK. IT IS THE OWNER'S RESPONSIBILITY TO
<br />ADVISE THE GENERAL CONTRACTOR AND HIS SUBS OF ANY ASBESTOS WITHIN
<br />THE FACILITY. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY
<br />PRECAUTIONS REQUIRED BY LAW TO PROTECT ALL WORKERS AND OCCUPANTS
<br />IF ANY ASBESTOS IS IDENTIFIED AND NOTIFY THE OWNER IMMEDIATELY.
<br />1. EXIT DOORS SHALL SWING IN THE DIRECTION OF EXIT TRAVEL WHEN SERVING ANY
<br />HAZARDOUS AREA OR WHEN SERVING AN OCCUPANT LOAD OF 50 OR MORE.
<br />2. EXIT DOORS SHALL BE READILY OPENABLE FROM THE EGRESS SIDE WITHOUT THE USE
<br />OF A KEY OR SPECIAL KNOWLEDGE OR EFFORT. (2022 CBC)
<br />EXCEPTION: THIS REQUIREMENT SHALL NOT APPLY TO EXTERIOR EXIT DOORS IN A
<br />GROUP “B” OCCUPANCY IF THERE IS A VISIBLE, DURABLE SIGN ON OR ADJACENT TO THE
<br />DOOR STATING “THIS DOOR TO REMAIN OPEN DURING BUSINESS HOURS.” THE LETTERS
<br />SHALL BE NOT LESS THAN 1 INCH HIGH ON A CONTRASTING BACKGROUND. THE LOCKING
<br />DEVICE MUST BE A TYPE THAT WILL BE READILY DISTINGUISHABLE AS LOCKED.
<br />3. PANIC HARDWARE, WHEN INSTALLED, SHALL COMPLY WITH ALL APPLICABLE
<br />BUILDING CODE REQUIREMENTS. THE ACTIVATING MEMBER SHALL BE MOUNTED AT
<br />A HEIGHT OF NOT LESS THAN 30 INCHES NOR MORE THAN 44 INCHES ABOVE THE
<br />FLOOR. THE UNLATCHING FORCE SHALL NOT EXCEED 15 POUNDS WHEN APPLIED IN
<br />THE DIRECTION OF EXIT TRAVEL.
<br />4. THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE, SHALL BE ILLUMINATED AT
<br />ALL TIMES THE BUILDING SPACE SERVED BY THE MEANS OF EGRESS IS OCCUPIED.
<br />THE MEANS OF EGRESS ILLUMINATION LEVEL SHALL NOT BE LESS THAN 1
<br />FOOT-CANDLE (11 LUX) AT THE WALKING SURFACE LEVEL (2022 CBC)
<br />5. EXIT ILLUMINATION SHALL COMPLY WITH 2022 CBC CHAPTER 10.
<br />6. EXIT SIGNS SHALL BE INSTALLED AT REQUIRED EXIT DOORWAYS AND WHERE
<br />OTHERWISE NECESSARY TO CLEARLY INDICATE THE DIRECTION OF EGRESS WHEN THE
<br />EXIT SERVES AN OCCUPANT LOAD OF 50 OR MORE.
<br />EXCEPTION: MAIN EXTERIOR DOORS WHICH OBVIOUSY AND CLEARLY ARE IDENTIFIABLE
<br />AS EXITS NEED TO BE SIGNED WHEN APPROVED BY THE BUILDING OFFICIAL.
<br />7. WHEN NECESSARY, THE FINAL LOCATION AND QUANTITY OF EXIT SIGNS SHALL BE
<br />DETERMINED BY THE FIRE DEPARTMENT PRIOR TO CONSTRUCTION OF ANY WORK.
<br />8. THE COLOR AND DESIGN OF LETTERING, ARROWS AND OTHER SYMBOLS ON EXIT
<br />SIGN SHALL BE IN HIGH CONTRAST WITH THEIR BACKGROUND (NOT LESS THAN .75”
<br />X 6” LETTERS) (2022 CBC)
<br />9. ALL RATED COORIDOR DOORS SHALL HAVE A THRESHOLD WITH A SMOKE AND DRAFT
<br />SEAL AT HEAD AND JAMBS.
<br />10. INTERIOR WALL AND CEILING FINISHES SHALL BE NON-COMBUSTIBLE OR HAVE A
<br />FLAME SPREAD RATING OF 0 TO 25 FEET.
<br />11. ALL DRAPES, HANGING CURTAINS AND OTHER DECORATIVE MATERIALS SHALL BE
<br />TREATED AND MAINTAINED IN FLAME RETARDANT CONDITION.
<br />12. IF REQUIRED BY CODE OR PLAN CHECK, CONSTRUCTION DOCUMENTS FOR THE CITY
<br />OF NEWPORT BEACH TO INCLUDE PLANS FOR FIXED FIRE PROTECTION EQUIPMENT
<br />SUCH AS STANDPIPES, SPRINKLER SYSTEMS AND FIRE ALARM SYSTEMS, MAY BE
<br />SUBMITTED TO AND APPROVED BY THE STATE FIRE MARSHALL PRIOR TO ANY
<br />EQUIPMENT BEING INSTALLED. EXTEND OR MODIFY EXISTING SYSTEM AS REQUIRED
<br />TO ACCOMMODATE THIS PROJECT. (TITE 19, PART 3, TITLE 24).
<br />13. FIRE DAMPERS SHALL BE PROVIDED WHERE AIR DUCTS PENETRATE FIRE RATED
<br />WALLS OR CEILINGS AS PER 2022 CBC CHAPTER 7. SMOKE DAMPERS SHALL BE
<br />PROVIDED WHERE AIR DUCTS PENETRATE FIRE RATED WALLS OR CEILINGS AS PER
<br />2022 CBC CHAPTER 7.
<br />14. EXTEND/MODIFY FIRE/LIFE SAFETY SYSTEM AS REQUIRED. (IF APPLICABLE)
<br />15. EXTEND FIRE SPRINKLER SYSTEMS AS REQUIRED. (IF APPLICABLE)
<br />16. FIRE SPRINKLER/OR LIFE SAFETY PLANS MUST BE SUBMITTED TO THE CITY FOR
<br />REVIEW AND APPROVAL PRIOR TO BUILDING PERMIT ISSUANCE.
<br />17. A PORTALBE FIRE EXTINGUISHER WITH A MINUMUM 2A 1 OBC RATING SHALL BE
<br />PROVIDED EVERY 75' OF TRAVEL DISTANCE FROM ANY POINT WITHIN THE AREA
<br />DEFINED AS SCOPE OF WORK PER THESE PLANS. PROVIDE FIRE EXTINGUISHERS AS
<br />REQUIRED BY FIRE DEPARTMENT FIELD INSPECTOR.
<br />18. ALL EMERGENCY LIGHTING SOURCES SHALL EMIT A MINIMUM VALUE OF ONE FOOT
<br />CANDLE MEASURED AT FLOOR LEVEL.
<br />19. PROVIDE EMERGENCY NOTIFICATION SYSTEM FOR THE HEARING AND VISUALLY
<br />IMPAIRED PER A.D.A. REQUIREMENTS.
<br />20. ADDRESS SHALL BE VISIBLE FROM STREET.
<br />21. KNOX BOX REQUIRED TO BE INSTALLED.
<br />22. FIRE EXTINGUISHERS REQUIRED - 2A 1 OBC EVERY 50' TRAVEL DISTANCE.
<br />23. EMERGENCY EVACUATIONS SIGNAGE REQUIRED TO BE POSTED AT LOCATIONS
<br />APPROVED BY FIRE DEPT.
<br />24. EXIT HARDWARE SHALL COMPLY WITH CBC CHAPTER ON EXITING.
<br />25. DO NOT UNDERCUT FIRE RATED DOORS. EXIT DOORS MUST BE TIED IN TO THE FIRE
<br />SAFETY SYSTEM.
<br />26. ALL MANUALLY OPERATED EDGE OR SURFACE-MOUNTED FLUSH BOLTS ARE
<br />PROHIBITED ON EXIT DOORS. WHEN EXIT DOORS ARE USED IN PAIRS AND
<br />APPROVED AUTOMATIC FLUSH BOLDS ARE USED, THE DOOR LEAD HAVING THE
<br />AUTOMATIC FLUSH BOLTS SHALL HAVE NO DOOR KNOB OR SURFACE-MOUNTED
<br />HARDWARE. THE UNLATCHING OF ANY LEAF SHALL NOT REQUIRE MORE THAN ONE
<br />OPERATION.
<br />27. ALL EXIT DOOR HARDWARE SHALL BE OF AN APPROVED TYPE AND TESTED IN
<br />ACCORDANCE WITH PROCEDURES ESTABLISHED BY SFM 33.2 AND SFM 33.3 AS
<br />SHOWN IN CHAPTER 2-60 OF TITLE 24.
<br />28. ALL HOLLOW METAL DOOR FRAMES SHALL BE PROVIDED WITH STEEL FRAMES.
<br />ENTRANCES & EXITS
<br />1. ALL ENTRANCES AND ALL EXTERIOR GROUND FLOOR EXIT DOORS TO
<br />BUILDINGS AND FACILITIES SHALL BE MADE ACCESSIBLE TO PERSONS
<br />WITH DISABILITIES. (2022 CBC 11B-206.4)
<br />2. ALL ACCESSIBLE ENTRANCES SHALL BE IDENTIFIED WITH AT LEAST ONE
<br />STANDARD SIGN AND WITH ADDITIONAL DIRECTIONAL SIGNS, AS
<br />REQUIRED, VISIBLE FROM APPROACHING PEDESTRIAN WAYS.
<br />3. ALL GATES, INCLUDING TICKET GATES, SHALL MEET ALL APPLICABLE
<br />ACCESSIBILITY SPECIFICATIONS OF DOORS. (2022 CBC 11B-206.5)
<br />4. EVERY REQUIRED EXIT DOORWAYS WHICH IS LOCATED WITHIN AN
<br />ACCESSIBLE PATH OF TRAVEL SHALL BE CAPABLE OF OPENING AT LEAST
<br />90 DEGREES, SHALL HAVE A MINIMUM CLEAR OPENING OF 32”, AND
<br />SHALL BE OF A SIZE AS TO PERMIT THE INSTALLATION OF A DOOR NOT
<br />LESS THAN 3' IN WIDTH AND NOT LESS THAN 6'-8” IN HEIGHT. (2022
<br />CBC 11B-404.2.3)
<br />5. WHERE PAIR OF DOORS IS UTILIZED AT LEAST ONE OF THE DOORS
<br />SHALL PROVIDE A CLEAR UNOBSTRUCTED OPENING WIDTH OF
<br />32-INCHES WITH THE LEAF POSITIONED AT AN ANGLE OF 90 DEGREES
<br />FROM ITS CLOSED POSITION. (2022 CBC 11B-404.2.2, 404.2.3)
<br />6. LATCHING AND LOCKING DOORS THAT ARE HAND ACTIVATED AND
<br />WHICH ARE IN PATH OF TRAVEL SHALL BE OPERABLE WITH A SINGLE
<br />EFFORT BY LEVER TYPE HARDWARE, BY PANIC BARS, PUSH-PULL
<br />ACTIVATING BARS, OR OTHER HARDWARE DESIGNED TO PROVIDE
<br />PASSAGE. (2022 CBC 11B-404.2.7, 309-4).
<br />7. OPERABLE PARTS OF DOOR HARDWARE HARDWARE MOUNTED
<br />BETWEEN 34-INCHES AND 44-INCHES ABOVE FINISHED FLOOR. (2022
<br />CBC 11B-404.2.7)
<br />8. THE FLOOR LANDING ON EACH SIDE OF AN ENTRANCE OR PASSAGE
<br />DOOR SHALL BE LEVEL AND CLEAR. THE LEVEL AND CLEAR AREA SHALL
<br />HAVE A LENGTH IN THE DIRECTION OF DOOR SWING OF AT LEAST 60 -
<br />INCHES AND THE LENGTH OPPOSITE THE DIRECTION OF DOOR SWING
<br />OF 44 - INCHES AS MEASURED AT RIGHT ANGLES TO THE PLANE OF THE
<br />DOOR IN ITS CLOSED POSITION.
<br />9. THE WIDTH OF THE LEVEL AREA ON THE SIDE TO WHICH THE DOOR
<br />SWINGS SHALL EXTEND 24-INCHES PAST THE STRIKE EDGE OF THE
<br />DOOR FOR EXTERIOR DOORS AND 18-INCHES PAST THE STRIKE EDGE
<br />FOR THE INTERIOR DOORS. WHERE A DOOR IS REQUIRED TO BE
<br />ACCESSIBLE IS LOCATED IN A RECESS OR ALCOVE WHERE THE DISTANCE
<br />FROM THE FACE OF THE WALL TO THE FACE OF THE DOOR IS GREATER
<br />THAN 8 INCHES, STRIKE SIDE CLEARANCE PER SECTION 11B-404.2.4
<br />SHALL BE PROVIDED. (2022 CBC 11B-404.2.4, 11B-404.2.4.3).
<br />10. THE FLOOR OR LANDING SHALL BE NOT MORE THAN ½ - INCH LOWER
<br />THAN THE THRESHOLD OF THE DOORWAY. CHANGE IN LEVEL BETWEEN
<br />¼ - INCH AND ½ - INCH SHALL BE BEVELED WITH A SLOPE NO
<br />GREATER THAN 1:2. (CBC 2022 404.2.5).
<br />11. THE BOTTOM 10-INCHS OF ALL DOORS EXCEPT AUTOMATIC AND
<br />SLIDING SHALL HAVE A SMOOTH UNITERRUPTED SURFACE TO ALLOW
<br />THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST WITHOUT
<br />CREATING A TRAP OR HAZARDOUS CONDITION. WHERE NARROW
<br />FRAME DOORS ARE USED, A 10-INCH HIGH SMOOTH PANEL SHALL BE
<br />INSTALLED ON THE PUSH SIDE OF THE DOOR, WHICH WILL ALLOW THE
<br />DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST WITHOUT CREATING
<br />A TRAP OR HAZARDOUS CONDITION. (2022 CBC 11B-404.2.10).
<br />12. MAXIMUM EFFORT TO OPERATE INTERIOR AND EXTERIOR DOORS SHALL
<br />NOT EXCEED 5 LBS. SUCH PULL OR PUSH EFFORT BEING APPLIED AT
<br />RIGHT ANGLES TO HINGED DOORS AND AT THE CENTER PLANE OF
<br />SLIDING OR FOLDING DOORS. COMPENSATING DEVICES OR
<br />AUTOMATIC DOOR OPERATORS MAY BE UTILIZED TO MEET THE ABOVE
<br />STANDARDS. WHEN FIRE DOORS ARE REQUIRED, THE MAXIMUM
<br />EFFORT TO OPERATE THE DOOR MAY BE INCREASED TO THE MINIMUM
<br />ALLOWED BY THE APPROPRIATE ADMINSTRATIVE AUTHORITY, NOT TO
<br />EXCEED 15 LBS. (2022 CBC 11B-404.2.9).
<br />13. FOR HINGED DOORS, THE OPENING WIDTH SHALL BE MEASURED WITH
<br />THE DOOR POSITION AT AN ANGLE OF 90 DEGREES FROM THE CLOSED
<br />POSITION. (2022 CBC 11B-404.2.3)
<br />14. WHERE A PAIR OF DOORS IS UTILIZED, AT LEAST ONE OF THE DOORS
<br />SHALL PROVIDE A CLEAR, UNOBSTRUCTED OPENING WIDTH OF 32"
<br />WITH THE LEAF POSITIONED AT AN ANGLE OF 90 DEGREES FROM ITS
<br />CLOSED POSITION. (2022 CBC 11B-404.2.2, 404.2.3)
<br />15. MINIMUM MANEUVERING CLEARANCES AT DOORS SHALL BE AS
<br />SHOWN IN FIGURE 11B-404.2.4.1. THE FLOOR OR GROUND AREA
<br />WITHIN THE REQUIRED CLEARANCES SHALL BE LEVEL AND CLEAR.
<br />(2022 CBC 11B-404.2.4, 404.2.4.4)
<br />29. FIRE EXTINGUISHERS HAVING A GROSS WEIGHT NOT EXCEEDING 40 POUNDS
<br />SHALL BE INSTALLED SO THAT THE TOP OF THE FIRE EXTINGUISHER IS NOT
<br />MORE THAT 5 FEET ABOVE THE FLOOR. FIRE EXTINGUISHERS HAVING A
<br />GROSS WEIGHT GREATER THAN 40 POUNDS (EXCEPT WHEELED TYPES)
<br />SHALL BE SO INSTALLED THAT THE TOP OF THE FIRE EXTINGUISHER IS NOT
<br />MORE THAN 3 1
<br />2 FEET ABOVE THE FLOOR. IN NO CASE SHALL THE CLEARANCE
<br />BETWEEN THE BOTTOM OF THE EXTINGUISHER AND THE FLOOR BE LESS
<br />THAN 4 INCHES.
<br />30. WHEELED FIRE EXTINGUISHER SHALL BE CONSPICUOUSLY LOCATED IN A
<br />DESIGNATED LOCATION.
<br />31. PORTABLE FIRE EXTINGUISHER SHALL NOT BE OBSTRUCTED OR OBSCURED
<br />FROM VIEW. IN ROOMS OR AREAS IN WHICH VISUAL OBSTRUCTION
<br />CANNOT BE COMPLETELY AVOIDED, MEANS SHALL BE PROVIDED TO
<br />INDICATE THE LOCATIONS OF EXTINGUISHERS.
<br />32. CABINETS USED TO HOUSE PORTABLE FIRE EXTINGUISHERS SHALL NOT BE
<br />LOCKED.
<br />33. ONLY A CONTRACTORS STATE LICENSING BOARD LICENSED C-16
<br />CONTRACTOR SHALL INSTALL A FIRE SPRINKLER SYSTEM.
<br />34. THE CONTRACTOR SHALL BE FAMILIAR WITH AND SHALL COMPLY WITH
<br />CHAPTER 33 "FIRE SAFETY DURING CONSTRUCTION AND DEMOLITION," AND
<br />CHAPTER 35 "WELDING AND OTHER HOT WORK" OF THE 2016 CALIFORNIA
<br />FIRE CODE.
<br />35. COMBUSTIBLE SCRAP MATERIALS AND SCRAP LUMBER SHALL BE PICKED UP
<br />ON A DAILY BASIS, OR MORE FREQUENTLY, AS REQUIRED BY THE FIRE
<br />DEPARTMENT. COMBUSTIBLE DEBRIS SHALL NOT BE ACCUMULATED WITH
<br />BUILDINGS (CFC 3304.2)
<br />36. OPEN BURNING IS PROHIBITED ANYWHERE ON THE SITE DURING
<br />CONSTRUCTION, ALTERATION OR DEMOLITION (CFC 3304.3)
<br />37. A FIRE DEPARTMENT FINAL INSPECTION IS REQUIRED. CONTACT THE COUNTY
<br />FIRE PREVENTION DIVISION A MINIMUM OF 72 HOURS IN ADVANCE TO
<br />SCHEDULE INSPECTIONS AND TESTS.
<br />16. PROVIDE CLEAR SPACE OF 12" PAST STRIKE EDGE OF THE DOOR ON THE
<br />OPPOSITE SIDE TO WHICH THE DOOR SWINGS IF THE DOOR IS
<br />EQUIPPED WITH BOTH A LATCH AND A CLOSER.
<br />17. WHERE THE DOOR OPENS INTO A STAIR OF A SMOKE PROOF
<br />ENCLOSURE, THE LANDING NEED NOT HAVE A LENGTH OF 60".
<br />18. WHEN THE DOOR HAS A CLOSER, THEN THE SWEEP PERIOD OF THE
<br />CLOSER SHALL BE ADJUSTED SO THAT FROM AN OPEN POSITION OF 90
<br />DEGREES, THE TIME REQUIRED TO MOVE THE DOOR TO A POSITION OF
<br />12 DEGREES FROM THE LATCH IS 5 SECONDS MINIMUM. (2022 CBC
<br />11B-404.2.8.1)
<br />19. ALL DOORS AND ALCOVES SHALL COMPLY WITH THE CLEARANCES FOR
<br />FRONT APPROACHES.
<br />20. PROVIDE TACTILE EXIT SIGN PER SECTION 11B-202.4
<br />21. ACCESSIBLE STALL IN MULTI-ACCOMMODATION TOILET FACILITIES
<br />SHALL BE A MINIMUM OF 60" WIDE PER (2022 CBC 11B-213.2)
<br />22. PROVIDE TACTILE EXIT SIGN PER SECTION 11B-202.4.
<br />23. ACCESSIBLE STALL IN MULTI-ACCOMMODATION TOILET FACILITIES
<br />SHALL BE A MINIMUM OF 60” WIDE PER (2022 CBC 11B-213.2).
<br />AISLES
<br />1. EVERY CORRIDOR SHALL BE AS SHOWN ON THE PLANS AND SHALL BE
<br />DETERMINED AS PER CBC CHAPTER 10.
<br />2. EVERY PORTION OF EVERY BUILDING IN WHICH ARE INSTALLED SEATS,
<br />TABLES, MERCHANDISE, EQUIPMENT OR SIMILAR MATERIALS SHALL BE
<br />PROVIDED WITH AISLES LEADING TO AN EXIT. (2022 CBC CHAPTER 10,
<br />SECTION 1017)
<br />NOTIFICATION APPLIANCES FOR THE HEARING IMPAIRED
<br />1. APPROVED NOTIFICATION APPLIANCES FOR THE HEARING IMPAIRED
<br />SHALL BE INSTALLED IN ACCORDANCE WITH THE PROVISIONS OF NFPA
<br />72 AND CBC, CHAPTER 9, SECTION 907.9.1 AND 907.9.2
<br />2. STROBE SIGNALING DEVICES REQUIRED FOR THE HEARING IMPAIRED
<br />SHALL BE STATE FIRE MARSHALL, NFPA 72: PER CHAPTER 6, SECTION
<br />6-4, VISIBLE CHARACTERISTICS, PUBLIC MODE.
<br />3. THE FLASH RATE SHALL NOT EXCEED 3 FLASHES PER SECOND NORBE
<br />LESS THAN 1 FLASH EVERY THREE SECONDS NFPA 72: PER CHAPTER 6,
<br />SECTION 6-4.2, LIGHT PULSE CHARACTERISTICS.
<br />4. AUDIBLE SIGNALS INTENDED FOR OPERATION IN THE PUBLIC MODE
<br />SHALL HAVE A SOUND LEVEL OF NOT LESS THATN 75 dBA AT 10' OR
<br />MOREE THAN 130 dBA AT THE MINIMUM HEARING DISTANCE FROM
<br />THE AUDIBLE APPLIANCE. NFPA 72: PER CHAPTER 6, SECTION 6-3,
<br />AUDIBLE CHARACTERISTICS, PUBLIC MODE.
<br />ACCESSIBLE DOORS
<br />1. ACCESSIBLE ENTRANCES AND EXITS FROM A BUILDING MUST BE
<br />PROVIDED, ACCORDING TO 2022 CBC.
<br />2. MANEUVERING CLEARANCES AT DOORS SHALL BE LEVEL (1:50 MAX.
<br />SLOPE) AND CLEAR IF DOORS ARE NOT AUTOMATIC OR POWER
<br />ASSISTED.
<br />3. GATES MUST MEET ACCESSIBLE REQUIREMENTS FOR DOORS.
<br />4. PROVIDE ACCESSIBLE DOORS OR GATES ADJACENT TO REVOLVING
<br />DOORS OR TURNSTILES.
<br />5. DOUBLE LEAF DOORS SHALL HAVE AT LEAST THE ACTIVE LEAF MEET ALL
<br />DOOR REQUIREMENTS.
<br />6. ALL DOORS IN ALCOVES SHALL COMPLY WITH THE CLEARANCES FOR
<br />FRONT APPROACHES.
<br />STATE REQUIREMENTS
<br />1. AT TIME OF PERMIT ISSUANCE, CONTRACTOR SHALL SHOW THEIR VALID
<br />WORKERS' COMPENSATION INSURANCE CERTIFICATE.
<br />2. ALL WORK SHALL CONFORM TO ALL REQUIREMENTS OF STATE OF
<br />CALIFORNIA TITLE 24 REGARDLESS OF THE INFORMATION INDICATED ON
<br />THESE PLANS. IT IS THE RESPONSIBILITY OF THE INDIVIDUAL SUPERVISING
<br />THE CONSTRUCTION TO ENSURE THAT THE WORK IS DONE IN ACCORDANCE
<br />WITH CODE REQUIREMENTS PRIOR TO REQUESTING INSPECTION.
<br />3. EXCESS OR WASTE CONCRETE MAY NOT BE WASHED INTO THE PUBLIC WAY
<br />OR ANY OTHER DRAINAGE SYSTEM. PROVISIONS SHALL BE MADE TO RETAIN
<br />CONCRETE WASTES ON SITE UNTIL THEY CAN BE DISPOSED OF AS SOLID
<br />WASTE.
<br />4. SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) SHALL
<br />NOTIFIED IN ACCORDANCE WITH CALIFORNIA STATE LAW PRIOR TO START OF
<br />ANY DEMOLITION, ADDITION, AND/OR REMODEL WORK. THE SOUTH COAST
<br />AIR QUALITY MANAGEMENT DISTRICT OFFICE IS LOCATED AT 21865 COPLEY
<br />DRIVE, DIAMOND BAR, CA. PHONE NO. (909) 396-2000. BE ADVISED,
<br />SCAQMD MAY REQUIRE A 10 DAY WAIT PERIOD PRIOR TO START OF WORK.
<br />5. SEDIMENTS AND OTHER MATERIALS MAY NOT BE TRACKED FROM THE SITE
<br />BY VEHICLE TRAFFIC. THE CONSTRUCTION ENTRANCE ROADWAYS MUST
<br />STABILIZE SO AS TO INHIBIT SEDIMENTS FROM BEING DEPOSITED INTO THE
<br />PUBLIC WAY. ACCIDENTAL DEPOSITIONS MUST BE SWEPT UP IMMEDIATELY
<br />AND MAY NOT BE WASHED DOWN BY RAIN OR OTHER MEANS.
<br />6. STOCKPILES OF EARTH AND OTHER CONSTRUCTION RELATED MATERIALS
<br />MUST BE PROTECTED FROM BEING TRANSPORTED FROM THE SITE BY
<br />FORCES OF WIND OR WATER.
<br />7. TRASH AND CONSTRUCTION RELATED SOLID WASTES MUST BE DEPOSITED
<br />INTO A COVERED RECEPTACLE TO PREVENT CONTAMINATION OF RAINWATER
<br />AND DISPERSAL BY WIND.
<br />8. FUELS, OILS, SOLVENTS AND OTHER TOXIC MATERIALS MUST BE STORED IN
<br />ACCORDANCE WITH THEIR LISTING AND ARE NOT TO CONTAMINATE THE SOIL
<br />AND SURFACE WATERS. ALL APPROVED STORAGE CONTAINERS ARE TO BE
<br />PROTECTED FROM THE WEATHER. SPILLS MUST BE CLEANED UP
<br />IMMEDIATELY AND DISPOSED OF IN A PROPER MANNER. SPILLS MAY NOT
<br />BE WASHED INTO THE DRAINAGE SYSTEM.
<br />CITY BUILDING DEPT. NOTES
<br />1. THE ISSUANCE OF A PERMIT SHALL NOT PREVENT THE BUILDING OFFICIAL
<br />FROM REQUIRING THE CORRECTION OF ERRORS ON THESE PLANS OR FROM
<br />PREVENTING ANY VIOLATION OF THE CODES ADOPTED BY THE CITY, RELEVANT
<br />LAWS, ORDINANCES, RULES AND/OR REGULATIONS.
<br />2. PLUMBING FIXTURES SHALL HAVE THE FOLLOWING MAX. FLOW RATES:
<br />LAVATORY FAUCETS - 0.4 GPM; KITCHEN FAUCETS - 1.8 GPM; WATER
<br />CLOSETS - 1.28 GPF.
<br />A.1.0 SITE PLAN
<br />T-24.0 TITLE-24 DOCUMENTS
<br />T-24.1 TITLE-24 DOCUMENTS
<br />A FOR PERMIT
<br />A.1.2 AS-BUILT DEMOLITION PLAN
<br />CONSULTANTS
<br />· CITY OF SANTA ANA PLANNING DIVISION
<br />· CITY OF SANTA ANA BUILDING DEPARTMENT
<br />· ORANGE COUNTY FIRE AUTHORITY
<br />· ORANGE COUNTY SANITATION
<br />JURISDICTIONAL APPROVAL
<br />PARKING CALCULATIONS
<br />CO2 GAS DETECTION SYSTEM
<br />UNDER SEPARATE APPLICATION AND
<br />PERMIT.
<br />CO2 ENRICHMENT NOTES
<br />CO2 STORAGE AND DISTRIBUTION /
<br />ENRICHMENT PLAN
<br />UNDER SEPARATE APPLICATION AND
<br />PERMIT.
<br />1. CO2 ENRICHMENT WILL BE CONDUCTED ON THESE PREMISES WITHIN THE CULTIVATION ROOMS. CO2 WILL BE STORED AT THE EXTERIOR OF THE BUILDING IN LIQUID
<br />FORM WITHIN A FIXED TANK DESIGNED FOR THIS PURPOSE (SEE A.1.0 SITE PLAN, KEYNOTE 'F'). LIQUID CO2 IS CONVERTED TO GAS AT THE EXTERIOR OF THE BUILDING
<br />AND DISTRIBUTED TO THE CULTIVATION ROOMS WITHIN THE BUILDING. THE CO2 ENRICHMENT OPERATIONS WILL BE CONTROLLED USING A MONITORING AND
<br />CONTROL SYSTEMS DESIGNED FOR THIS PURPOSE. A SEPARATE CO2 DETECTION AND ALARM SYSTEM IS PROVIDED PER FIRE CODE REQUIREMENTS.
<br />2. THE STORAGE, USE AND HANDLING OF COMPRESSED GASSES IN COMPRESSED GAS CONTAINERS, CYLINDERS, TANKS AND SYSTEMS SHALL COMPLY WITH THE FIRE
<br />CODE CHAPTER 53 AND NFPA 55.
<br />3. COMPRESSED GAS CYLINDERS SHALL BE CLEARLY MARKED WITH THE NAME OF THE GAS CONTAINED THEREIN. FIRE CODE 5301.1 CYLINDERS CONTAINING CARBON
<br />DIOXIDE SHALL BEAR GRAY COLOR MARKINGS AND LABELS.
<br />4. A GAS DETECTION SYSTEM SHALL BE PROVIDED TO MONITOR AREAS WHERE CO2 CAN ACCUMULATE. THE SYSTEM SHALL BE SESIGNED TO INITIATE A LOCAL AUDIBLE
<br />AND VISIBLE ALARM IN THE ROOM OR AREA IN WHICH THE SENSOR IS INSTALLED WHEN THE LEVEL OF CO2 EXCEEDS 5,000 PPM. FIRE CODE 5307.5.2
<br />5. INDOOR STORAGE AND USE AREAS AND STORAGE BUILDINGS SHALL BE PROVIDED WITH VENTILATION IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 5004.3.
<br />WHERE MECHANICAL VENTILATION IS PROVIDED, THE SYSTEMS SHALL BE OPERATIONAL DURING SUCH TIME AS THE BUILDING OR SPACE IS OCCUPIED. EXCEPTION: A
<br />GAS DETECTION SYSTEM COMPLYING WITH SUBSECTION (I.5) SHALL BE PERMITTED IN LIEU OF MECHANICAL VENTILATION. FIRE CODE 5307.5.1
<br />HAZARDOUS MATERIALS DECLARATION
<br />THIS BUILDING WILL USE CARBON DIOXIDE IN THE AMOUNT OF 8 TONS (MAX.),
<br />WHICH IS IN EXCESS OF NON-REPORTABLE AMOUNTS OF HAZARDOUS
<br />MATERIALS.
<br />CULTIVATION RUN-OFF STATEMENT
<br />THE PROPOSED GROW MEDIA (POTTING MATERIAL) FOR THIS FACILITY IS ROCK
<br />WOOL ONLY. NOT SOIL OR PARTICULATE WILL BE INCLUDED IN THE RUN-OFF
<br />LIQUID.
<br />N E W F L O W E R R O O M
<br />CANNABIS PRODUCTS STATEMENT
<br />THE PURPOSE OF THIS PROPOSED FACILITY WILL BE TO GROW AND TRIM BULK
<br />CANNABIS FLOWER ONLY AND THE RETAIL SALES OF CANNABIS.
<br />BUILDING AREA
<br />A. CONSTRUCTION TYPE (CHAPTER 6):III-B
<br />B. FULLY SPRINKLERED (CHAPTER 9):NO
<br />C. ALLOWABLE (CHAPTER 5)
<br />C.A. ALLOWABLE STORIES (TABLE 504.4)2
<br />C.B. ALLOWABLE HEIGHT (TABLE 504.3)55 FT.
<br />C.C. ALLOWABLE FLOOR AREA (TABLE 506.2)
<br />M OCC.: 12,500 SF
<br />B OCC: 19,000 SF
<br />F-1 OCC: 12,500 SF
<br />D. ACTUAL:
<br />D.A. ACTUAL STORIES 1
<br />D.B. ACTUAL HEIGHT 19'-2" AFG
<br />D.C. ACTUAL FLOOR AREA (TOTAL)
<br />M OCC. : 2,910 SF.
<br />F-1 OCC.: 7,490 SF.
<br />NOTE: SEE A.1.3 FOR SF TOTALS, OCCUPANCIES AND FIRE SEPARATION ANALYSIS.
<br />NOTE: DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE DESIGN AND SUBMITTED DOCUMENTS HAVE BEEN APPROVED
<br />BY THE BUILDING DIVISION.
<br />NEW FLOWER
<br />R O O M
<br />1821 NEWPORT CIRCLE
<br />SANT A A NA, CA 92 05
<br />3419 Via Lido, Ste. 225
<br />Newport Beach, CA 92663
<br />949.500.9416 www.intrepid-group.net
<br />MEP ENGINEER
<br />BF CONSULTING
<br />12200 STAGG STREET
<br />NORTH HOLLYWOOD, CA 91605
<br />818-795-3487
<br />A.1.0a (E) FIRE MASTER PLAN (FOR REFERENCE ONLY)
<br />A6.2 DETAILS
<br />ACS.0
<br />S1 STRUCTURAL PLAN
<br />SCOPE OF WORK
<br />TENANT IMPROVEMENT. CONVERSION OF PART OF THE EXISTING RETAIL USE TO A
<br />CANNABIS FLOWER ROOM.
<br />E1-0 ELECTRICAL LEGEND-NOTES-SYMBOLS
<br />E2-0 ELECTRICAL POWER PLAN
<br />E3-0 ELECTRICAL LIGHTING PLAN
<br />E3-1 ELECTRICAL GROW LIGHTING PLAN
<br />E4-0 ELECTRICAL ROOF PLAN
<br />E5-0 ELECTRICAL FIXTURE SCHEDULE
<br />E6-0 ELECTRICAL SINGLE LINE DIAGRAM
<br />E7-0 ELECTRICAL PANEL SCHEDULE
<br />E8-0 ELECTRICAL SPECIFICATIONS
<br />E9-0 ELECTRICAL DETAILS
<br />E10-0 ELECTRICAL TITLE-24
<br />M1-0 MECHANICAL LEGEND-NOTES-SYMBOLS
<br />M1-1 MECHANICAL EQUIPMENT SCHEDULES
<br />M2-0 MECHANICAL FLOOR PLAN
<br />M2-1 MECHANICAL EQUIPMENT PLAN
<br />M3-0 MECHANICAL ROOF PLAN
<br />M4-0 MECHANICAL DETAILS
<br />M4-1 MECHANICAL DETAILS
<br />P1-0 PLUMBING LEGEND NOTES SCHEDULES
<br />P2-0 PLUMBING WASTE AND VENT
<br />P2-1 PLUMBING WATER PLAN
<br />P3-0 PLUMBING DETAILS
<br />B PCC-1
<br />GROW ROOM RACKING SYSTEM
<br />UNDER SEPARATE APPLICATION AND
<br />PERMIT.
<br />B
<br />B
<br />APPROVALS:
<br />
<br />Bldg #101120205
<br />PLNG - C. Santana
<br />BLDG - A. So
<br />POLICE - B. Martin
<br />PUBLIC WORKS - B. Sarlak
<br />
<br />Elect #20183508
<br />M. Smith
<br />
<br />Plumb #30147555
<br />T. Luka
<br />
<br />Mech #40139341
<br />T. Luka
<br />1821 E Newport Cir
<br />12/23/2024
|