Laserfiche WebLink
LU <br />C <br />K <br />Y <br /> <br />P <br />L <br />A <br />Z <br />A <br />11/05/2024 <br />AS SHOWN <br />25 <br />0 <br />9 <br /> <br />W <br /> <br />E <br />D <br />I <br />N <br />G <br />E <br />R <br /> <br />A <br />V <br />E <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />Job: <br />Sheet <br />JC <br />Date: <br />Drawn: <br />Scale: <br />REVISIONS <br />2 <br />1 <br />3 <br />4 <br />5 <br />6 <br />626-581-5585 <br />Space Planning. <br />Interior Design. <br />www.rdcsservice.com <br />02/10/2025 <br />02/27/2025 <br />03/19/2025 <br />VICINITY MAP <br />CO <br />V <br />E <br />R <br /> <br />S <br />H <br />E <br />E <br />T <br /> <br />/ <br /> <br />N <br />O <br />T <br />E <br />S <br />A-1.0 <br />1. FIRE SUPPRESSION SYSTEM (ANSUL) CONTRACTOR SHALL SUBMIT PLAN, OBTAIN PERMIT PRIOR TO THE <br />COMMENCEMENT OF WORK FROM FIRE DEPARTMENT. <br />2. LOCATION & CLASSIFICATION OF FIRE EXTINGUISHERS SHALL BE IN ACCORDANCE WITH C.F.C. STANDARDS <br />AND PLACEMENT IS SUBJECT TO APPROVAL OF FIRE INSPECTOR. <br />3. STORAGE, DISPENSING, OR USE OF ANY FLAMMABLE AND COMBUSTIBLE LIQUIDS, FLAMMABLE, AND <br />COMPRESSED GASES, AND OTHER HAZARDOUS MATERIAL SHALL COMPLY WITH CALIFORNIA FIRE CODE <br />REGULATIONS. THE STORAGE AND USE OF HAZARDOUS MATERIALS SHALL BE APPROVED BY THE FIRE <br />AUTHORITY PRIOR TO ANY MATERIALS BEING STORED OR USED ON SITE. A SEPARATE PLAN SUBMITTAL IS <br />REQUIRED PRIOR TO THE STORAGE AND USE OF HAZARDOUS MATERIALS. <br />4. BUILDING(S) NOT APPROVED FOR HIGH-PILED STOCK (MATERIAL IN CLOSELY PACKED PILES OR ON <br />PALLETS, OR IN RACKS WHERE THE TOP OF STORAGE EXCEEDS 12'-0" IN HEIGHT, AND 6'-0" FOR GROUP-A PLASTIC <br />AND CERTAIN OTHER HIGH HAZARD COMMODITIES. HIGH-PILES STOCK SHALL BE APPROVED BY THE FIRE <br />DEPARTMENT PRIOR TO MATERIAL BEING STORED ON SITE. A SEPARATE PLAN SUBMITTAL IS REQUIRED FOR HIGH <br />STORAGE IN ACCORDANCE <br />5. ALL WEATHER ACCESS ROAD SHALL BE APPROVED BY THE GOVERNING FIRE DEPARTMENT AND IN PLACE <br />BEFORE ANY COMBUSTIBLE MATERIALS ARE PLACED ON SITE. ACCESS ROADS SHALL BE CLEAR OF <br />OBSTRUCTIONS; <br />6. ACCESS GATES SHALL BE IN COMPLIANCE WITH CALIFORNIA FIRE CODE 2016 AND LOCAL GOVERNING FIRE <br />DEPARTMENT GUIDELINES. A SEPARATE PLAN SUBMITTAL AND APPROVAL BY FIRE DEPARTMENT. <br />7. PLANS OF NEW OR MODIFICATIONS TO EXISTING FIRE PROTECTION, DETECTION, ALARM, OR MONITORING <br />SYSTEM(S) SHALL BE APPROVED BY THE FIRE DEPARTMENT PRIOR TO INSTALLATION. A SEPARATE PLAN <br />SUBMITTAL AND APPROVAL BY FIRED DEPARTMENT IS REQUIRED PRIOR TO TO THE COMMENCEMENT OF ANY <br />WORK. <br />8. A LETTER OF INTENDED USE FOR THE STRUCTURE(S) MAY BE REQUIRED BY THE FIRE INSPECTOR. <br />9. WHEN THE PROJECT INVOLVES THE CONSTRUCTION OF A NEW STRUCTURE OR AN ADDITION TO AN <br />EXISTING STRUCTURE , PLAN AND DOCUMENTATION FO RHTE FIRE DEPARTMENT ACCESS, HYDRANT LOCATION, <br />WATER AVAILABILITY AND FIRE LANE MARKINGS SHALL BE SUBMITTED TO AND APPROVED <br />BY THE FIRE DEPARTMENT PRIOR TO THE APPROVAL OF ARCHITECTURAL PLAN. FIRE DEPARTMENT APPROVED <br />SITE PLAN SHALL BE SUBMITTED WITH THE ARCHITECTURAL PLANS. <br />10. IN STRUCTURES OF UNDETERMINED USE, THE MINIMUM FIRE SPRINKLER DESIGN DENSITY REQUIRED <br />SHALL BE ORDINARY HAZARD GROUP 2 WITH A DESIGN AREA OF 3,000 SQUARE FEET. <br />11. AN AUTOMATIC EXTINGUISHING SYSTEM SHALL BE PROVIDED TO PROTECT COMMERCIAL TYPE FOOD HEAT <br />PROCESSING EQUIPMENT THAT PRODUCES GREASE-LADEN VAPORS. A SEPARATE PLAN SUBMITTAL IS REQUIRED <br />FOR THE INSTALLATION OF THE SYSTEM AND SHALL BE IN ACCORDANCE WITH C.F.C. <br />12. ALTERATIONS TO FIRE SPRINKLERS WERE NOT CONSIDERED IN THIS REVIEW, ARE PERMITTED <br />SEPARATELY AND WILL REQUIRE A SEPARATE SUBMITTAL. <br />13. MIN. 6 INCHES SUITE NUMBERS SHALL BE PROVIDED ON FRONT AND REAR DOORS. <br />1. CONTRACTOR TO FURNISH AND MAINTAIN TEMPORARY SANITARY FACILITIES AS REQUIRED DURING CONSTRUCTION. <br />2. ALL REQUIRED WORK AND ALL REPAIR OF DAMAGES ON AND OFF PUBLIC PROPERTY (SIDEWALK, CURB, STREET, ETC. <br />) OCCURRING AS RESULT OF CONSTRUCTION PROCEDURE, ETC., SHALL BE DONE ACCORDING TO GOVERNING <br />REGULATIONS, SPECIFICATIONS, ETC., MATCH AND PATCH THIS WORK TO BE CONSISTENT WITH SAID ADJOINING <br />CONDITIONS AT NO EXTRA COST. <br />3. PROVIDE AND COORDINATE SITE PLUMBING, DRAINAGE, ELECTRICAL, TELEPHONE, ETC., WORK TO PROVIDE <br />COMPLETE OPERATING SYSTEMS. ALL NECESSARY WORK INVOLVING EXISTING CURBS, STREETS, SIDEWALKS, ETC., <br />TRENCHING, BACK FILLING, REPAIRING, ETC., INSIDE AND OUTSIDE OF PROPERTY LINES SHALL BE PROVIDED. <br />4. FOR UTILITIES, SEE PLUMBING AND ELECTRICAL DRAWINGS FOR BUILDING WORK. SEE CIVIL AND ELECTRICAL <br />DRAWINGS FOR SITEWORK. <br />5. ALL ROOF DRAINS DISCHARGING RAIN WATER WITHIN 25 FEET OF PROPERTY LINES AT STREETS, SHALL BE <br />CONDUCTED TO DRAINAGE WITHOUT SHEET FLOW OVER SIDEWALKS. SEE BUILDING, PLUMBING AND CIVIL DRAWINGS. <br />6. PROVIDE PEDESTRIAN PROTECTION BARRICADES AND / OR CANOPIES AS REQUIRED BY THE LOCAL AUTHORITIES, OR <br />AS NECESSARY FOR PEDESTRIANS SAFETY. <br />7. ALL WORK MATERIALS, METHODS, ETC., SHALL CONFORM TO ALL GOVERNING CODES, REGULATIONS AND AGENCIES. <br />8. GOVERNING CODES AND FIRE DEPARTMENT FIELD INSPECTOR SHALL DICTATE SIZE, TYPE, QUANTITY AND LOCATIONS <br />OF REQUIRED PORTABLE FIRE EXTINGUISHERS. (NIC) <br />9. GLASS AND GLAZING TO COMPLY WITH 16 CFR PART 2101 OF CONSUMER PRODUCT SAFETY COMMISSION. <br />10. CONTRACTOR SHALL VISIT THE JOBSITE AND VERIFY ALL DIMENSIONS AND CONDITIONS THEREON BEFORE <br />COMMENCING WORK. REPORT ANY DISCREPANCIES AND / OR POTENTIAL PROBLEMS TO THE ARCHITECT IN WRITING. <br />11. DURING CONSTRUCTION, CONTRACTOR SHALL PROVIDE AND MAINTAIN FIRE EXTINGUISHERS AS REQUIRED BY THE <br />FIRE DEPARTMENT FIELD INSPECTOR. <br />12. CONTRACTOR SHALL PROVIDE ALL CEILING OR WALL ACCESS PANELS ( OR ACCESS DOORS ) AS REQUIRED BY THE AIR <br />CONDITIONING, PLUMBING AND ELECTRICAL SYSTEMS. <br />13. ALL DIMENSIONS SHOWN ARE TO CENTER LINE OF COLUMNS AND BEAMS, FACE OF STUDS UNLESS OTHERWISE NOTED. <br />14. ALL OCCUPIABLE AREAS OF THE BUILDING SHALL BE MECHANICALLY VENTILATED. THE VERY MINIMUN AIR CHANGE <br />PER HOUR SHALL NOT BE LESS THAN TWO PER HOUR. SEE MECHANICAL. <br />15. ALL TOILET ROOMS SHALL BE VENTILATED WITH 5 MINUTE AIR CHANGE BY MECHANICAL MEANS. SEE MECHANICAL <br />DRAWINGS. <br />16. SIGN CONTRACTOR TO OBTAIN SEPARATE PERMITS FROM BUILDING DEPARTMENT FOR INSTALLATION OF ALL SIGNS AS <br />REQUIRED BY LOCAL CODE. <br />17. THESE DOCUMENTS WILL INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN <br />CONCEPT, THE DIMENSIONS, MAJOR ARCHITECTURAL ELEMENTS AND THE TYPE OF STRUCTURAL, MECHANICAL AND <br />ELECTRICAL SYSTEMS, AS SCOPE DOCUMENTS, THE DRAWINGS DO NOT NECESSARILY INDICATE OR DESCRIBE ALL <br />WORK REQUIRED FOR FULL PERFORMANCE AND COMPLETION OF THE PROJECT. ON THE BASIS OF THE GENERAL <br />SCOPE DESCRIBED, ANY WORK OR MATERIALS NOT DIRECTLY NOTED IN THE CONTRACT DOCUMENTS, BUT <br />NECESSARY FOR THE INTENT THEREOF, ARE IMPLIED AND ARE TO BE PROVIDED FOR AS IF SPECIFICALLY DESCRIBED. <br />1. BEFORE SUBMITTING THE BID, THE CONTRACTOR SHALL CAREFULLY EXAMINE THE PLANS PERTAINING TO THIS <br />WORK, CONTRACTOR SHALL VISIT THE SITE AND FULLY INFORM HIMSELF AS TO ALL CONDITIONS AND LIMITATIONS <br />APPLYING TO THIS WORK HE SHALL ESTIMATE AND INCLUDE IN HIS BID A SUM SUFFICIENT TO COVER THE COST OF <br />ALL LABOR AND MATERIALS TO ACCOMPLISH THE INTENT OF THESE PLANS, AND NO SUBSEQUENT ALLOWANCE <br />WILL BE MADE TO THIS CONTRACTOR BECAUSE OF HIS NEGLECT IN COMPLYING WITH THESE REQUIREMENTS. <br />2. THE CONTRACTOR SHALL OBTAIN PERMITS AS REQUIRED BY THE GOVERNING AUTHORITIES FOR CONSTRUCTION. <br />3. ELECTRICAL, MECHANICAL AND PLUMBING SYSTEMS SHALL BE DONE BY THE CONTRACTOR. THE CONTRACTOR <br />SHALL PREPARE AND SUBMIT PLANS, AND OBTAIN PERMITS AS REQUIRED BY THE GOVERNING AUTHORITIES FOR <br />PLAN CHECK AND CONSTRUCTION. <br />4. THE CONTRACTOR SHALL PROCURE IN THE OWNER'S NAME, AND CHARGES FOR INSTALLATION OF THE WATER <br />AND GAS METERS AND ALL PIPING FROM MAIN TO SAID METERS. <br />5. THE CONTRACTOR SHALL SENT PROPER NOTICES, MAKE ALL NECESSARY ARRANGEMENTS AND PERFORM ALL <br />SERVICES REQUIRED IN THE MAINTENANCE OF ALL PUBLIC UTILITIES. <br />6. THE CONTRACTOR SHALL REQUIRE SUCH COOPERATION OF THE VARIOUS TRADES AS WILL BE NECESSARY TO <br />COMPLETE EACH AND EVERY PART OF THE WORK, EVEN THOUGH NOT SPECIFICALLY INDICATED, NOTED OR <br />DETAILED ON THE DRAWINGS OR SPECIFICATIONS. <br />7. DIMENSIONS AND CONDITIONS AT THE JOBSITE SHALL BE VERIFIED BY THE CONTRACTORS. DISCREPANCIES IN <br />THE DRAWINGS OR BETWEEN THE DRAWINGS AND ACTUAL FIELD CONDITIONS OR CODE REQUIREMENTS SHALL BE <br />REPORTED TO THE ARCHITECT. CORRECTED DRAWINGS OR INSTRUCTIONS SHALL BE ISSUED BY THE ARCHITECT <br />PRIOR TO THE INSTALLATION OF ANY WORK. <br />8. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ADHERE TO ALL APPLICATABLE REQUIREMENTS OF CAL-OHSA <br />PERTAINING TO CONSTRUCTION SAFETY. <br />9. THE CONTRACTOR SHALL PROTECT ALL PUBLIC PAVING, STREETS AND SIDEWALKS, AND SHALL MAKE ALL <br />NECESSARY REPAIRS AT HIS OWN EXPENSE. <br />10. THE CONTRACTOR SHALL PROTECT ALL PRIVATE PROPERTY, ROADS AND WALLS, AND SHALL MAINTAIN THEM <br />DURING THE COURSE OF THE WORK, AND SHALL REPAIR ALL DAMAGES TO THE WORK, AND SHALL REPAIR ALL <br />DAMAGES AT HIS OWN EXPENSE. <br />11. THE CONTRACTOR SHALL, AND HEREBY DOES, WARRANT ALL WORK PERFORMED BY HIM FOR THE PERIOD OF <br />ONE YEAR FROM THE TIME OF FINAL OCCUPANCY, WORK SHALL INCLUDE ALL MATERIALS, FIXTURES, EQUIPMENT <br />AND LABOR. <br />12. DAMAGE ( HOLES, OPENINGS, SCRATCHES ETC.,) RESULTING FROM DEMOLITION OR CONSTRUCTION ACTIVITIES <br />REQUIRED FOR THIS PROJECT SHALL BE REPAIRED (PATCHED / REPLACED ) TO MATCH AND BE UNNOTICABLE <br />FROM THE EXISTING ADJACENT SURFACE. <br />13. CONTRACTOR SHALL PROVIDE ENOUGH SHORINGS AND BRACINGS TO SUPPORT ALL CONSTRUCTION LOADS. <br />14. SHOP DRAWINGS AND DETAILS SHALL BE APPROVED PRIOR TO INSTALLATION. <br />15. CONTRACTOR TO PROVIDE COMPLETE APPROVED WATER PROOFING SYSTEM AND MEMBRANES IN ALL KITCHEN <br />AREA. WAITER STATION, BAR AREA, SERVICE AREA, RESTROOM AREA AND ANY OTHER AREA SUBJECT TO <br />ROUTINE MAINTENANCE, WASHING AND CLEANING WORKS. FLOOR SURFACE SHALL BE GRADED TO PROVIDE MIN. <br />SLOPE AS REQUIRED BY CODES TOWARD FLOOR DRAINING. <br />1. PLUMBING DRAIN WASTE AND VENT AND/OR MECHANICAL DUCTING AND/OR ELECTRICAL WlRING DIAGRAMS <br />OR DRAWINGS MAY BE REQUIRED BY THE FIELD INSPECTOR AND WILL BE PROVIDED UPON REQUEST. <br />ELECTRICAL LOAD CALCULATIONS MAY BE REQUIRED BY THE FIELD INSPECTOR AND WILL BE PROVIDED <br />UPON REQUEST. <br />2. THE FOLLOWING A & B, SHALL BE PROVIDED TO THE BUILDING FIELD INSPECTOR BEFORE ANY FOUNDATION <br />INSPECTION WILL BE PERFORMED. ITEM C SHALL BE PROVIDED BEFORE THE SHEAR AND ROOF <br />INSPECTION. ITEM D SHALL BE PROVIDED BEFORE A FRAME INSPECTION WILL BE PERFORMED. <br />2.1. BUILDING SETBACKS TO PROPERTY LINES AND PAD ELEVATION(S) MUST BE VERIFIED BY A <br />SURVEYOR. THIS MUST BE IN THE FORM OF A PROFESSIONAL REPORT, STAMPED AND SIGNED BY <br />THE RESPONSIBLE PARTY. THE REPORT MUST STATE THAT THE BUILDING IS IN SUBSTANTIAL <br />COMPLIANCE TO THE APPROVED PLANS. THIS REPORT MUST BE SUBMITTED TO THE FIELD <br />INSPECTOR AT TIME OF FOUNDATION INSPECTION. <br />2.2. PAD COMPACTION MUST BE VERFIED BY A SOILS ENGINEER. THIS MUST BE IN THE FORM OF A <br />PROFESSIONAL REPORT, STAMPED AND SIGNED BY THE RESPONSIBLE PARTY. THE REPORT MUST <br />STATE THAT THE BUILDING IS IN SUBSTANTIAL COMPLIANCE TO THE APPROVED SOILS REPORT. THIS <br />REPORT MUST BE SUBMITTED TO THE FIELD INSPECTOR AT TIME OF FOUNDATION INSPECTION. <br />2.3. FINISH FLOOR ELEVATIONS MUST BE VERIFIED BY A SURVEYOR. THIS MUST BE IN THE FORM OF A <br />PROFESSIONAL REPORT, STAMPED AND SIGNED BY THE RESPONSIBLE PARTY. THIS REPORT MUST <br />STATE THAT THE BUILDING IS IN SUBSTANTIAL COMPLIANCE TO THE APPROVED PLANS. <br />2.4. ELEVATION OF HIGHEST POINT OF ANY ROOF RIDGE OR ROOF PROJECTION MUST BE VERIFIED BY A <br />SURVEYOR ( CUSTOM HOMES ONLY ). THIS MUST BE IN THE FORM OF A PROFESSIONAL REPORT, <br />STAMPED AND SIGNED BY THE RESPONSIBLE PARTY. THE REPORT MUST STATE THAT THE BUILDING <br />IS IN SUBSTANTIAL COMPLIANCE TO THE APPROVED PLANS. <br />3. ALL HOLD DOWN AND ANCHOR BOLTS TO BE IN PLACE AT TIME OF INSPECTION. <br />4. A SEPARATE CIRCUIT FOR A GARBAGE DISP. AND DISHWASHER. <br />5. WHERE PENETRATIONS OCCUR THAT THEY COMPLY W/ 2320.11.7.11.9.11.1012.4, CUTTING, NOTCHING AND <br />BORED HOLES. <br />ALL CONSTRUCTION TO COMPLY W/ LOCAL CODES & ORDINANCES & THE FOLLOWING: <br />APPLICABLE BUILDING CODES: <br />ALL PLANS TO COMPLY WITH T-24 AND THE FOLLOWING: <br />2022 CALIFORNIA BUILDING CODE. (CBC) <br />2022 CALIFORNIA RESIDENTIAL GREEN BUILDING STANDARDS CODE. (CRC) <br />2022 CALIFORNIA MECHANICAL CODE (CMC) <br />2022 CALIFORNIA PLUMBING CODE (CPC) <br />2022 CALIFORNIA ELECTRICAL CODE (CEC) <br />2022 CALIFORNIA FIRE CODE (CFC) <br />2022 CALIFORNIA ENERGY CODE <br />1. RESTROOMS SHALL BE MADE AVAILABLE FOR BOTH CUSTOMERS AND EMPLOYEES. (422.4 CPC) <br />2. MODIFIED FIRE SPRINKLER PLANS AND FIRE-LIFE-SAFETY PLANS SHALL BE SUBMITTED FOR <br />REVIEW, APPROVAL AND PERMIT ISSUANCE. CBC 107.2.2) <br />3. NO FRAMING OR T-BAR APPROVALS WILL BE GRANTED WITHOUT THE FIRE DEPARTMENT <br />APPROVAL FOR THE FIRE SPRINKLERS. <br />4. EXIT DOORS AND GRILLES SHALL BE OPENABLE FROM WITHIN WITHOUT THE USE OF A KEY OR <br />ANY SPECIAL KNOWLEDGE OR EFFORT WHEN THE SPACE IS OCCUPIED. (CBC 1008.1.4.4 & 1008.19.3 <br />#2) <br />5. LIGHTING AND MECHANICAL FIXTURES MUST BE SUPPORTED BY ADDITIONAL INDEPENDENT NO. <br />12 GAGE WIRES ATTACHED TO EACH CORNER OF FIXTURE.(ASCE 7 SECTION 13.5.6.2.2, CISCA) <br />6.EXISTING SITE, ACCESSIBLE PARKING STALLS, RESTROOMS, ETC. SHALL FULLY COMPLY WITH <br />CURRENT DISABLED ACCESS DESIGN REQUIREMENTS; AND SUBJECT TO FIELD VERIFICATION & <br />APPROVAL. (CBC 11B-202) <br />FIRE DEPARTMENT N O T E S <br />GENERAL NOTES <br />A D D I T I O N A L N O T E S <br />CONTRACTOR NOTES <br /> NOTES <br />BUILDING NOTES <br />SHEET INDEX <br />PROJECT NAME: <br />& ADDRESS <br />LUCKY PLAZA <br />2509 W EDINGER AVE, <br />SANTA ANA, CA 92704 <br />APN 407-014-34 <br />OWNER NAME: <br />& ADDRESS <br />LUCKY PLAZA <br />2509 W EDINGER AVE, <br />SANTA ANA, CA 92704 <br />DESIGNER: <br />RDCS SERVICE INC. <br />15902 HALLIBURTON RD., #182 <br />HACIENDA HEIGHTS, CA 9174 <br />626-581-5885 LIC. #799342 <br />SCOPE OF WORK:PARKING LOT 2" OVERLAY OF EXISTING <br />ASPHALT AND RE-STRIPPING <br />TYPE OF CONSTRUCTION:TYPE V-B (ONE STORY), NO FIRE <br />SPRINKLERED <br />OCCUPANCY GROUP:M <br />BUILDING USAGE:RETAIL <br />FIRE SPRINKLER:NO <br />PROPERTY AREA: 20,534.85 SF <br />A-1.0 COVER SHEET / NOTE <br />A-2.0 SITE PLAN <br />A-3.0 DETAIL <br />LUCKY PLAZA <br />CITY OF SANTA ANA <br />2509 W EDINGER AVE, SANTA ANA, CA 92704 <br />1 <br />Bldg #101122126 <br /> <br />APPROVALS: <br />PLNG - C. Santana <br />BLDG - J. Lo <br />PUBLIC WORKS - Y. Soto <br />2509 W Edinger <br />Ave4/7/2025