Laserfiche WebLink
,--SANTA <br />NAJ|il}ffi <br />Planning & Building Agency <br />Building Safety DiviBlon <br />20 Civic Center Plaza <br />"'' "t*[f,oENrALr.mT <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s8oo <br />www.santa-ana.org <br />rq R[C'D PHOTOVOLTAIC <br />CHECKLIST <br />IUI <br />CitY of Santa Ana <br />sol-01 cBC 2013 <br />Solai Photovoltaic (PV) Checklist for Detached STNGLE FAMTLY RESIDENGES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 1 1" x 17" size. lf answerino NO to anv of the ouestions. Dlan check shall be required. <br />Project Address:1209 ELAINE DR, SANTA ANA, CA 92703 <br />contractor company Name: SOUTHWEST SUN SOLAR, INC <br />contractorLicenseNumber: 1004667 <br />4 <br />6 <br />7 <br />YES NO <br />Ettr <br />z. Eltr <br />I Etr <br />g tstr <br />ro. BE <br />mtr <br />Ettr8tr <br />Etr <br />atr <br />Are the following applicable to the proposed proJect? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the Califomia Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roollng layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of lhe <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system bs installed without using any ballast system or counter-weight <br />system? <br />Will lhe anchors be installed wilh a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol2-112inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a Californja <br />licensed professional engineer? (including project speciflc site plan, PV layout, <br />anchorage spacing, anchorage detalls and manufaclurer's PV support information.) <br />I certify under penalty of perjury under the laws of the State of California that the above is true: <br />print Name: MlMl NGO <br />phone Number: 714 582 3909 <br />Signature <br />Date: <br />Email Address <br />Re\:al1712015 <br />PERMIT@SOUTHWESTSUNSOLAR.COM