Laserfiche WebLink
Planning & Building Agency <br />Building Safety Oivision <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certlfication section below. Acopyof thisformshall be attached to each of TWO sets of plans, of <br />minimum 1 1 ' x 17' size. lf answerinq NO anv of the ouestions. Dlan chec k shall be reouired <br />Proiect Address:1214W Park Ln, Santa Ana, CA 92706 <br />Contractor Company uame: €|<CCom Fon-t q<( <br />Contractor License Number:loz{Gqtl <br />Are the following applicable to the proposed pro,ect? <br />Will the PV system layout provide the required threejoot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />ovedays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on lhe plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 ioch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />I certify under pe alty of per.iury under the laws of the State of Califo ia that the above is true <br />Print Name du'.Qaet Signature <br />Vt-z <br />YES NO <br />a tr <br />4 <br />2 <br />3 <br />6 <br />7 <br />I <br />8tr <br />Etr <br />trtrtrtr <br />8tr <br />Etr <br />atr <br />ADI <br />10 <br />Phone Number <br />Eltr <br />t ?6 <br />Emarl Address I <br />o <br />c 4 lt-<,1/. c0/^ <br />*,,SANTA <br />NAJffi'ffi <br />r-:--:r <br />'1 <br />Re!, I r I9,2! I <br />Date: