Laserfiche WebLink
Planning & Building Agency <br />Building Safety Division <br />20 Clvlc Csnter Plaza <br />P.O. Box 1988 (MJg) <br />Santa Ana, CA 92702 <br />(7r4) 647-5800 <br />www.santa-ana.org <br />sol-o1 cBc 2016 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all seclions, answer the len questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17"size. lf answerinq NOtoanyof the questions, plan check shall be required. <br />Proj oct Address: '1602 S RENE DR <br />Contractor Company 116mg; Vivint Solar <br />Contractor Licen59 llnm6gT; 973756 <br />YES NO Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV syslem be instjalled on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay be flush mounled to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV syslem be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the root? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-l12inch <br />embedment into roof rafters (with pre{rilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacture/s PV support information.) <br />1 E tr <br />2 <br />3 <br />tr <br />tr <br />4 trtr <br />Btr <br />trtr <br />Etr <br />o <br />7 <br />8 tr <br />9 trtr <br />10 mtr <br />I certify under penalty of perjury under the laws of th <br />pdnl 11sms. Kayla Horta <br />e State of California that the <br />Signature: <br />phone Number: 951 496-2292 <br />Email Address: kayla.horta@vivintsolar.com <br />Rev: 8/29/ 19 <br />Aa1s. O9l25l2O <br />is true: <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST