My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4006 W Flight Ave - Misc. Permit
PBA
>
Building
>
Permits
>
F
>
Flight Ave
>
4006 W Flight Ave
>
Misc.
>
4006 W Flight Ave - Misc. Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 11:24:04 AM
Creation date
7/27/2021 11:23:15 AM
Metadata
Fields
Template:
Misc. Permit
Full Address
4006 W Flight Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NorCal Engineering <br />Soils and Geotechnical Consultants <br />10641 Humbolt Sfieet Los Alamitos, CA 90720 <br />(562)799-9469 Fax (562) 799-9459 <br />January 23, 2020 ProJect Number 21 622-20 <br />Kennah Construction <br />6251 Vatcher Drive <br />Huntington Beach, California 92647 <br />Attn: Mr. Steve Espenschied <br />RE Report of Geotechnical Observation and Testing of Swimming Pool <br />Backfill Operations - Located at 4006 West Flight Avenue, in the City of <br />Santa Ana, California <br />Dear Mr. Espenschied: <br />Pursuant lo your request, this firm has provided this geotechnical report to summarize <br />the observation and testing performed by this firm for the swimming pool backfill <br />operations at the above referenced project. Our geotechnical services pertaining to the <br />backfill of the excavation are summarized in the subsequent sections of this report. <br />Backfill O Derations <br />The existing pool shell was left intact and two 3 feet by 3 feet holes, one in the middle <br />and one in the shallow end of the pool and one 6 feet by 6 feet hole in the deep end of <br />the pool were placed through the bottom to allow for drainage. The upper 2 feet of the <br />pool walls were removed. The fill area was approximately 28 feet by 15 feet with a <br />maximum depth of 8 feet. The pool was backfilled with approximately 2 feet of 1 inch <br />minus crushed concrete. The crushed concrete was overlain with a filter fabric prior to <br />the placement of compacted fill soils. Fill material placed was compacted to a minimum <br />of 90% of the laboratory standard in lifts not in excess of eight inches in thickness. A <br />rubber{ire Bobcat loader was utilized for compaction control. A water hose provided <br />moisture control.
The URL can be used to link to this page
Your browser does not support the video tag.