Laserfiche WebLink
*,,SANTA <br />NA <br />ul]I[I0 <br />& II.IIJIIC <br />IGIITY <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-o1 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certiflcation section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerinq NO to any of the questions, plan check shall be required. <br />Project Address:614 E Occi.I.".r <1 <br />Contractor Company Name: <br />Contractor License Number: <br />V Nrnv So\."r <br />2 <br />3 <br />6 <br />7 <br />4 <br />YES NO <br />tsu <br />ptr <br />pa <br />pu <br />Ftr <br />fo <br />Ptrfa <br />Iu <br />pu <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ndges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol 2-l12inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedmenl <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />8 <br />I <br />10 <br />I certify under penalty of perjury under the laws of th <br />Print Name: And.CW 6cu.to.r. <br />7bt'\4t'tttt, <br />enk,^. durc(t D V,Vink So\c.r. co.-r <br />e State of <br />Signature <br />Date: <br />Califo hat bove is true:ta <br />Phone Number <br />Email Address: <br />Rev: 11/19/2015 <br />Plann ing & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />1 <br />91<t at <br />1-L1-t 1