My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Additional Contingency Funds for the 10th and Flower Street Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
07/01/2025
>
Item 15 - Approve Additional Contingency Funds for the 10th and Flower Street Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 8:22:49 AM
Creation date
6/26/2025 8:22:33 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
7/1/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br /> www.santa-ana.org/pw <br /> Item # 15 <br /> City of Santa Ana <br /> 20 Civic Center Plaza, Santa Ana, CA 92701 <br /> Staff Report <br /> July 1, 2025 <br /> TOPIC: Additional Contingency Funds for 10th Street and Flower Street Improvements <br /> AGENDA TITLE <br /> Approve Additional Contingency Funds for the loth and Flower Street Improvements <br /> with an Estimated Project Delivery Cost of$2,220,898 (Project No. 22-1342 & 25-6707) <br /> (Non-General Fund) (Revive Santa Ana) <br /> RECOMMENDED ACTION <br /> 1. Approve an appropriation adjustment recognizing $375,000 in the Residential Street <br /> Improvement, Prior Year Carry Forward revenue account (No. 05817002-50001) <br /> and appropriate the same amount into the Residential Street Improvement, <br /> Improvements Other Than Buildings expenditure account (No. 05817660-66220). <br /> (Requires five affirmative votes.) <br /> 2. Approve an amendment to the Fiscal Year 2025-26 Capital Improvement Program to <br /> include $375,000 in construction funds for loth and Flower Street Improvements <br /> (Project No. 25-6707). <br /> 3. Approve an amendment to the Project Cost Analysis in the amount of$375,000 for a <br /> new estimated construction delivery cost of$2,220,898. <br /> GOVERNMENT CODE §84308 APPLIES: No <br /> DISCUSSION <br /> On October 15, 2024, City Council authorized the award of an American Rescue Plan <br /> Act (ARPA) funded construction contract to Vido Samarzich, Inc. for the construction of <br /> pedestrian and mobility improvements associated with the future park at the southeast <br /> corner of loth Street and Flower Street (Exhibit 1). Improvements include constructing a <br /> cul-de-sac, bioswale, signalized crosswalk, sidewalk, and street improvements (Exhibit <br /> 2). The project is currently under construction and close to completion, however it has <br /> encountered a number of unforeseen conditions and project betterments that <br /> necessitated change orders and use of existing contingency funds. Specifically, <br /> underground gas, water, and sewer utilities needed to be relocated and a new fire <br /> hydrant was installed near the cul-de-sac for adequate fire protection. As a result of the <br /> additional utility trenching, staff recommends extending the limits of street and <br />
The URL can be used to link to this page
Your browser does not support the video tag.