reduce surface water migration to the underlying soils. The layer of free draining granular <br />material should be separated from the backfill soils by a suitable geotextile, approved by the <br />geotechnical engineer. <br />All retaining wall backfill should be placed and compacted under engineering controlled <br />conditions in the necessary layer thicknesses to ensure an in-place density between 90 and 93 <br />percent of the maximum dry density as determined by the Modified Proctor test (ASTM D1557). <br />Care should be taken to avoid over-compaction of the soils behind the retaining walls, and the <br />use of heavy compaction equipment should be avoided. <br />Subsurface Drainaae <br />As previously indicated, the retaining wall design parameters are based upon drained backfill <br />conditions. Consequently, some form of permanent drainage system will be necessary in <br />conjunction with the appropriate backfill material. Subsurface drainage may consist of either: <br />• A weep hole drainage system typically consisting of a series of 4-inch diameter holes <br />in the wall situated slightly above the ground surface elevation on the exposed side <br />of the wall and at an approximate 8-foot on-center spacing. The weep holes should <br />include a 2 cubic foot pocket of open graded gravel, surrounded by an approved <br />geotextile fabric, at each weep hole location. <br />• A 4-inch diameter perforated pipe surrounded by 2 cubic feet of gravel per linear foot <br />of drain placed behind the wall, above the retaining wall footing. The gravel layer <br />should be wrapped in a suitable geotextile fabric to reduce the potential for migration <br />of fines. The footing drain should be extended to daylight or tied into a storm <br />drainage system. <br />6.9 Pavement Desi(In Parameters <br />Site preparation in the pavement area should be completed as previously recommended in the <br />Site Grading Recommendations section of this report. The subsequent pavement <br />recommendations assume proper drainage and construction monitoring, and are based on either <br />PCA or CALTRANS design parameters for a twenty (20) year design period. However, these <br />designs also assume a routine pavement maintenance program to obtain the anticipated 20-year <br />pavement service life. <br />Pavement Subqrades <br />It is anticipated that the new pavements will be supported on the existing fill and/or native soils <br />that have been scarified, moisture conditioned, and recompacted. These materials generally <br />consist of silty sands and sandy silts. These materials are expected to exhibit fair to good <br />pavement support characteristics, with estimated R-values of 30 to 40. Since R-value testing was <br />not included in the scope of services for the current project, the subsequent pavement designs <br />are based upon a conservatively assumed R-value of 30. Any fill material imported to the site <br />should have support characteristics equal to or greater than that of the on-site soils and be <br />placed and compacted under engineering controlled conditions. It may be desirable to perform <br />r SOUTHERN <br />CALIFORNIA <br />' GEOTECHNICAL <br />G&M Convenience Store #72 - Santa Ana, CA <br />Project No. 16G 123-1R <br />Page 27