My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1901-1919 N Fairview St - Soils Report
PBA
>
Building
>
Soils Reports
>
F
>
Fairview St
>
1901 N Fairview St
>
1901-1919 N Fairview St - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 1:07:26 PM
Creation date
6/23/2022 1:32:37 PM
Metadata
Fields
Template:
Soils Report
Full Address
1901 N Fairview St
1902 N Fairview St
1903 N Fairview St
1904 N Fairview St
1905 N Fairview St
1906 N Fairview St
1907 N Fairview St
1908 N Fairview St
1909 N Fairview St
1910 N Fairview St
1911 N Fairview St
1912 N Fairview St
1913 N Fairview St
1914 N Fairview St
1915 N Fairview St
1916 N Fairview St
1917 N Fairview St
1918 N Fairview St
1919 N Fairview St
Street Number
1901
1902
1903
1904
1905
1906
1907
1908
1909
1910
1911
1912
1913
1914
1915
1916
1917
1918
1919
Street Direction
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Street Name
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Street Suffix
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
603284-001 <br />5.0 RECOMMENDATIONS <br />The proposed new buildings and structures may be supported on spread-type shallow <br />foundation systems established in engineered fill or undisturbed natural soils. The <br />following preliminary geotechnical recommendations have been developed based on <br />the engineering properties of the onsite soils and their anticipated behavior during and <br />after construction. Leighton should review the grading plans, shoring plans, foundation <br />plans, and specifications when they are available to verify that the recommendations <br />presented in this report have been properly interpreted and incorporated. <br />5.1 Earthwork and Gradina <br />All earthwork and grading should be performed in accordance with the following <br />recommendations and Earthwork and Grading Guide Specifications presented in <br />Appendix F. <br />5.1.1 Site Preparation <br />Prior to construction, the area of proposed new buildings and structures <br />including site walls, e.g. retaining and freestanding walls, should be <br />cleared of any vegetation and demolition trash and debris. These <br />materials should be removed from the site. Any underground obstructions <br />onsite should be removed. The foundations for the existing buildings to be <br />demolished should be located and removed. <br />Efforts should be made to locate any existing utility lines to be removed or <br />rerouted where interfering with the proposed construction. Any resulting <br />cavities should be properly backfilled and compacted. After the site is <br />cleared, the soils should be carefully observed for the removal of all <br />unsuitable deposits. All undocumented fill should be excavated from <br />below proposed buildings, retaining walls, and concrete slabs on grade. <br />All existing fill, including backfill placed after US removal, is considered <br />undocumented fill until certification documentation becomes available. <br />Existing fill may be left in place below planned asphalt concrete (AC) <br />pavement if the associated risk of increased maintenance is deemed <br />acceptable. All areas with existing fill left in place should be proof-rolled <br />with heavy construction equipment to identify sofUloose zones for removal <br />and recompaction. <br />-19- <br />Leighton
The URL can be used to link to this page
Your browser does not support the video tag.