My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20 Civic Center Plaza - Soils Report
PBA
>
Building
>
Soils Reports
>
C
>
Civic Center Plz
>
20 Civic Center Plz
>
20 Civic Center Plaza - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 1:12:02 PM
Creation date
6/23/2022 1:33:09 PM
Metadata
Fields
Template:
Soils Report
Full Address
20 Civic Center Pl
Street Number
20
Street Name
Civic Center
Street Suffix
Pl
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Grifin Realty SA, Inc.-Geotechnical Investigation <br />Uiw/Crandall Project 70131-7-0261.0001 <br />July 8. 1997 <br />planned excavated level should be of sufficient strength to adequately transfer the imposed loads <br />to the surrounding soils. <br />The frictional resistance between the soldier piles and the retained earth may be used in resisting <br />the downward component of the anchor load. The coefficient of friction between the soldier piles <br />and the retained earth may be taken as 0.4. (This value is based on the assumption that uniform <br />full bearing will be developed between the steel soldier beam and the lean-mix concrete and <br />between the lean-mix concrete and the retained earth.) In addition, provided that the portion of the <br />soldier piles below the excavated level is backfilled with structural concrete, the soldier piles <br />below the excavated level may be used to resist downward loads. The frictional resistance between <br />the concrete soldier piles and the soils below the excavated level may be taken as equal to 400 <br />pounds per square foot. <br />Lagging <br />Continuous lagging will be required between the soldier piles. The soldier piles and anchors <br />should be designed for the full anticipated lateral pressure. However, the pressure on the lagging <br />will be less due to arching in the soils. We recommend that the lagging be designed for the <br />recommended earth pressure but limited to a maximum value of 400 pounds per square foot. <br />Anchor Design <br />Tie-back friction anchors may be used to resist lateral loads. For design purposes, it may be <br />assumed that the active wedge adjacent to the shoring is defined by a plane drawn at 35 degrees <br />from the vertical through the bottom of the excavation. The anchors should extend at least 15 feet <br />beyond the potential active wedge and to a greater length if necessary to develop the desired <br />capacities. <br />The capacities of anchors should be determined by testing of the initial anchors as outlined in a <br />following section. For design purposes, it may be estimated that drilled friction anchors will <br />develop an average friction value of 600 pounds per square foot. Only the frictional resistance <br />developed beyond the active wedge would be effective in resisting lateral loads. If the anchors are <br />10
The URL can be used to link to this page
Your browser does not support the video tag.