Laserfiche WebLink
*,,SANTA <br />NA <br />Itt\Ti0 <br />IBI|IIJT|O <br />rcNl' <br />Planning & Buihling Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (Ml9) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www,santa-ana.org <br />laFqErtlFrEEEItrr.srin-.::ri-Tt..r:-i,.;: _;=:-;;1-::.:.,::.tI:ir@ <br />soL-01 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMTLY RESTDENCES Onty <br />lnstructions: The Iicensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 1 1 " x '17" size. If answerinq NO to anv of the ouesti ons, plan check shall be reouired. <br />Proj ect Address: .71 \ 3 \ee- L-s,o ^) <br />RESIDENT!AL <br />PHOTOVOLTAIC <br />CHECKLIST <br />Contractor Company Name: <br />Contractor License Number: <br />YES NO <br />1. trItr <br />"FA <br />3 qtr <br />4 EB <br />5. E}D <br />Nl <br />?szt1 t1 <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is lhis shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontat anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16'' lag screws be installed with a minimum of 2-112inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project spe ciflc site plan, PV layout, <br />anchorage spacing, anchorage details and man r,S sup ation.) <br />I certify under penalty of perjury under the laws of the S o tiforn true: <br />Print Name: WP?*v L [+-s Signature <br />Date: <br />6. Ertr <br />7. El,,O <br />8 Etr <br />9 Etr <br />10 E}E <br />phone Number: e22 b) 70 I - 3\tL) <br />Email Address: 7u *t,=n <br />\.:) <br />tl <br />Lo/\ <br />Rev 11/19/2015 <br />Ll l>