Laserfiche WebLink
.-,,SANTA <br />NA <br />tLlllNC <br />&BIIIDNC <br />tcil0 <br />Planning & Building Agency <br />Building Safety 0ivision <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-'19) <br />Santa Ana, CA92702 <br />(714) 647-s800 <br />www.sanla-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the len questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17' size. lf answerinq NO to anv of the q uestions. olan check shall be required. <br />Project Address:1tt a. lreu-sozJ -D rz- <br />Contractor Company Name: <br />Contractor License Number: <br />Zeuc, F'N€u4 7 <br />?<3t'1 t1 a7- <br />YES NO <br />1. tr} tr <br />2FA <br />3, EItr <br />4 Eltr <br />5. Eltr <br />6 E]tr <br />7 El.E <br />8 ETEI <br />s. da <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to '10" maximum between <br />the underside of modules and the surface of the roof? <br />Will lhe PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California10 E}E <br />licensed professional engineer? (including project speci fic site plan, PV layoul, <br />anchorage spacing, anchorage details and man r's su pp tion.) <br />I certify under penalty of perjury under the laws of the Sta lifo rn true: <br />Print Name: WP?*v L ll*^, sc,J Signature <br />phone Number: Ub>7o I -3\8D Date: 4 l= 't <br />Email Address <br />'7c, nn>r-.-nt€Zeuo @ 7 <br />ove I <br />Rev: 11/19/2015