Laserfiche WebLink
,,,SANTA <br />NA,',i:r,ffi <br />Plannlng & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Sanla Ana, CAS2702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKL!ST <br />soL-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIOENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 1 1" x 1 7" size. lf answerinE NO to any of the ques tions. Dlan check shall be reouired. <br />Project Addtess:flO 5r, fu. ))errnis <*r"el <br />,...\l'\Ye--fctae n' J)€ q. nContractor Company Name: <br />Contractor License Numbor: <br />YES NO <br />4( r tt-t <br />Are the following applicable to tho proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on lhe roof plan? <br />Will the PV system be installed on a roof having only one roofing layer wilh no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counler-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Wll the minimum 5/16" lag screws be installed with a minimum of 2-1l2 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project speciflc site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />I certify under penalty of perjury under the laws of the State of Cal at <br />D.oA a <br />1 Ftr <br />Fn <br />Fo <br />2 <br />3 <br />4 <br />( <br />(u <br />Ftr <br />F10 <br />U Ftr <br />, Efl <br />a Etr <br />s,Eltr <br />tr <br />Print Name: <br />Phone Num oe,, bGt qlL{ ?oq t <br />Signature: <br />Datei r <br />Email Address <br />Revr 8/1712015 <br />o N /'J <br />N <br />0a r.t <br />ve is truo: