Laserfiche WebLink
D <br />EXPEDITED PERMIT PRoCESS ToR PV SYSTEMS <br />STANDARD STRING SYSTEM <br />The Solar America Board fo. Codes and Standards (Solar ABCS) Expedited Permit Pro- <br />cess provides a means !o differentiate sysrems rhar can be permirted quicry and easily <br />due to their similarity with rhe maJorlry of small-scale Pv s)6tems. Those systems with <br />unique characterisdcs may be handled with small additions to thls Expedired Fermit <br />Process or may require much more lnformation, depending on the uniqueness of the <br />installation. <br />The following paSes contain forms for the SEndard Sring System to use wirh the Expe- <br />dited Permit Process. The Micro-lnvertef, AC Module, and Supply-Side Connedion forms <br />are also available as interactive PDF files ar www.solarabcs.org/permitdng. In jurisdlc- <br />tions that have adopted the Expedited Permir Process for PV S),srems, these forms can <br />be filled out electronically and submifted ln either printed form and vla email. An elec- <br />tronic forma[ is used so that rhe supplied informarion is standardized and legible for the <br />local Jurisdiaion. <br />/) <br />I V <br />rErx'lr I r " <br />7,64 <br />-occ.oRou <br />---lr <br />/- <br />o <br />CONSTB,TYPE-It + <br />7 <br />Nol <br />lutilLI <br />L-4 \ <br />I <br />If,D,tj e*-'- <br />I <br />ITION <br />I rr r <br />EXPEDITED PERMIT PROCESS FOR PV SYSTEMS