My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20163579 - Permit (2)
PBA
>
Building
>
Permits
>
R
>
Raymar St
>
1753 W Raymar St
>
20163579 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2022 1:51:28 PM
Creation date
11/17/2022 1:51:26 PM
Metadata
Fields
Template:
Permit
Permit Number
20163579
Full Address
1753 W Raymar St
Permit ID
231635
Master ID Number
2017-137085
Project Name
Miscellaneous Counter1 Permit
Street Number
001753
Street Direction
W
Street Name
Raymar
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
6/27/2017
Issued Date
6/29/2017
Finalized Date
7/17/2017
Flood Zone
X-0602320257J
Description of Work
Install pv roof mounted solar panels. Per Expedited Permit Process For PV Systems Standard String System. Fees paid on 10193374.
Nature of Work
Solar Panels
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERMIT PRoCESS ,o* ,"o...,.0Til,,ii", .. U- <br />STANDARD STRING SYSTEM <br />The information in this guideline is intended ro help local jurisdictions and conrracbrs identify when Pv sysrem ins[alladons <br />are simPle, needing only a basic review and when an installarion is more complex. lr is likely rhar 50%-75 % of all residenrial <br />systems will comply wirh these slmple ffiteria. For projects thar fail ro meet the simple ffiteria, resolution sreps have been <br />suggested lo provide as a pat}l to permit appmval. <br />Regubed Informatlott for Permit: <br />I Site plan showing locarion of major components on the propeny. This drawing need nor be exactly to scale, bur it <br />should represent relative location of componen[s ar sire (see supplied example site plan). PV arrays on dwellings <br />with a 3' perimerer space ar ridge and sides may not need separare fire service review. <br />2. Electrical diagram showing Pv array configuration, wiring system, overcurrenr protection, invefter, disconnecrc. <br />required signs, and ac connecrion ro building (see supplied sEndard elecrrical diagram). <br />3. sPecihcation sheers and installation manuals (if available) for all manufacrured components including, but nor <br />limited to, PV modules, inverter(s), combiner box, disconnects, and mounring sysrem. <br />Step 'l : Structural Review o[ PV A,rray Mounting System <br />ts the array ul be mounted on a d€fined, pcrmlttad roof structurc? Ey." Eno <br />lj No due to non-compliant r@.1 ot a ground mouni submit completed worhsheet Jor the structure WKS t . <br />RooJ Infonution: <br />I . Is rhe roofrng rype lightweighr (Yes = composirion, lightweighr masonry meral, erc...)Comp Shinglo <br />IJ No, submit completed worksheet Jor rooJ structurc WfiSI (No = heavy masonry, slate, etc . . .) <br />2. Does rhe roof have a singte roof coveringi Ey"s Eno <br />IJ No, submit completed worksheet for rooJ stnrture WKS| . <br />3. Provide method and rype oi weatherprooflng roof penetrations (e.g. nashing, caulk)Flashing <br />M ounting Sy s t en lt{ormation : <br />L Is the mounting srrucrure an ejgineered producr designed to mount PV modules with no more than an 18" gap <br />beneaah the module frames? 14 Yes lJ No <br />II No, provide detaib of sffuctural attachment certijed by a design prolessional. <br />2. For manufacrured mounting sysrems. 6ll out informarion on the mounring sysrem below: <br />a. <br />b. <br />c. <br />d. <br />e. <br />Mounting Sy srem Manufacturer lrmRdgo roduct Name and Model# kn ni@-Attacirnona L-F@t <br />ToEl Weight of PV Modules and Rails 950 bs <br />Toral Number of Athchment Poin r.4 <br />Weight per tutachment Poinr (b + c 339 bs (if greater than 45 lbs. see WKSI) <br />Maximum Spacing Between Artachment Points on a Rail 't8' inches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />f. <br />g <br />Toal Surface Area of Pv Modules (square feeo 361 fr2 <br />Disrribured Weighr of PV Module on Roof (b + f)26 lbs/fi'? <br />If distributed weight oJ the PV system is geater than 5 lbstf, see Wr(Sr. <br />Step 2: Electrical Review o[ PV System (Calculations lor Electrical Diagram) <br />In order for a PV s)rstem to be consider€d for an €xpedited permit ptocess, thc bllowing must apply: <br />L PV modules, utility"interactive inveners. and combiner boxes are identihed for use in PV systems. <br />2. The PV array is composed of 4 series strings or less per inverter. <br />3. The total inverter capacity has a continuous ac power output 13,440 Warts 0r less <br />4. The ac interconnection point is on rhe load side of service disconnecring means (690.64(8)). <br />5. One of rhe sEndard electrical diagrams (El.l, El.l a, E I .l b, or El .I c) can be used to accurarely represent the pV <br />system. lnteractive PDF diagrams are available at wwwsolarabcs.org/permitting. <br />Fill out the stand.ard. electrical dwram completely. A guide to the electrical diagrom is prwided. to help the opplicant <br />understand each blank to l in. II the electrical {ystem is more compkx than the standard electrical diagmm can ellectivel! <br />communicate, prwide an altenlative diagrom tyith aryropriate detail. <br />2 txpEDlrED pERMlr pRocEss FoR pv sysrEMs
The URL can be used to link to this page
Your browser does not support the video tag.