My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20163923 - Permit (2)
PBA
>
Building
>
Permits
>
W
>
Wisteria Pl
>
4206 W Wisteria Pl
>
20163923 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 9:54:03 AM
Creation date
11/18/2022 9:54:01 AM
Metadata
Fields
Template:
Permit
Permit Number
20163923
Full Address
4206 W Wisteria Pl
Permit ID
233097
Master ID Number
2017-138066
Project Name
Miscellaneous Counter1 Permit
Street Number
004206
Street Direction
W
Street Name
Wisteria
Street Suffix
Pl
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
8/15/2017
Issued Date
8/15/2017
Finalized Date
10/26/2017
Flood Zone
X-0602320256J
Description of Work
Solar roof mounted PV panels - (15) panels, 4.275 Kwa
Nature of Work
Solar PV System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERMIT PROCESS FOR SMALL-SCALE PV SYSTEMS <br />STANDARD STRINC SYSTEM <br />The information in this guideline is in:ended ro help local jUrisdictions and connactors rdentrfy when PV system insrallarions <br />are simple, needing only a basic review and when an installation is more complex. lt is :ikely that fi%-75% of all residenrial <br />systems will comply wiLh these sirnpls criteria. For projects that fail to nleet the simple criterfa. resolution steps have been <br />suggested to provide as a parh ro permit approval. <br />Reqdteil InJonnttion fot Pennit: <br />l. Slte plan showing locarion of major components on the properry. This drawing need not be exacrty to scale, bur it <br />should represent .elative location of components at sire (see supplied example site plan). PV arrays on dwelllngs <br />with a 3' perimeter space at ridge and sides may not need separare hre service review. <br />2. Electrical diagram showlng PV array conhguration, wiring system, overcurrenL protection, inverteC disconnec6, <br />required signs, and ac connection to building (see supplied standard elecrrical diagram). <br />3 specihcation sheeB and insrallarion manuals (if available) for all manufactured components including, bur nol <br />limired ro, PV modules, invefier(s), combiner box disconnects, and mounring sysrem. <br />Step 1 : Structural Review ol PV Array Mounting System <br />ls the array to be mountcd on a dehned, permitted roof srructurer dYes Eno <br />U No due to non-compliont rool or a gound mount. submit completed worhsheet Jor the strucnre WKSI. <br />RooJ Inforfiation: <br />l,lsrheroohngtypelighrwelght(Yes=compositron,llgh:weightmaSonry'metal'elc,)- <br />Il No, submit compteted worksheetJor rcof structurc l,/?dsl (No - hedvy masonry, slate. etc. <br />2 Does rhe roof have a srngle rooF.overirgz Mves Eno <br />U No, submit completed wotkEheet Jor rcof structure WI<SI. <br />3 Provrde method and rype of weatherproofi ng rool penerrarions (e g nashrng, caulk) <br />M ou'r,ting Ey st ern I rtonnation : <br />Flashing <br />L Is rhe mounting structure an ejrineelgd producr desrgned to mount PV modules wirh no more Lhan an 18" gap <br />benearh rhe module iramesrllt Yes Ll No <br />l.f No. provide details of s uctural attachnent cerdrted 4) a destgn prokssional. <br />2. For manufactured mounting systems, hll out informarion on rhe mounring system below: <br />a. Mounting System Manufacturer EcoFasten Producr Name and Modelt Rocket <br />b. Tot,al weighr of Pv Modules and n"it, l!j--tUt <br />c. Total Number of Attachment Points 22 <br />d. weight per Attachnrinl Po nt (b - cl 32.4 bs (rf {reI8 ater than 45 lbs. see WKSI ) <br />e. Maximum Spacing Berw-ben Attachment Points on a Rajl inches (see product manual for <br />maxinium spacing allowed based on maximu <br />f. Total Surface Area of PV Modiles (souare fee) <br />m design wind speed) <br />g. Distributed Weight of PV Module on Roof (b + 0 2.9 lbsi ft? <br />If distributei weight ol the PV system is grcater tlan 5 lbstf , see WI<51. <br />Step 2: Electrical Review o[ PV System (Calculations lor Electrical Diagram) <br />tn order for a PV system to be considercd for an expedited permit process, the followtng must apply: <br />1 PV modules. utiliry-interactive inver(ers. and combiner boxes arc identifred for use in PV systems. <br />2. The Pv array is composed of 4 senes strings or less per inverter <br />3. The total inverter capacity has a continuous ac powcr oulput :3.440 Watts or less <br />4.' The ac interconnection point is on the load side of service disconnecring means (690.64(B)). <br />5. One ofrhesrandard electrical diagrarns (El.l. El.ta, El.lb, orEl.lc) can be used Lo accurately represcnt the PV <br />system. lnteractive PDF diagrams are available at wwwsolarabcs.org/permiBing. <br />Fill out the sta,ndatd electrical diagtam completely. A guide to the electrical diagrum is provided to help the dpplicdnt <br />understand each blanh to jll in. IJ the electticql system is more complet than the standard electricol diagrum can elJectively <br />comtnunicate, Wide an alternative d,iogratn with dryropriate detail. <br />2 ExpEDtrED PrRMlr pRoctss FoR pv sysrEMs
The URL can be used to link to this page
Your browser does not support the video tag.