Laserfiche WebLink
*-SANTA <br />NA <br />lLr\INC <br />& BIITDIC <br />ICTICI <br />Planning & Building Agency <br />Building Salety Division <br />20 Civic Center Plaza <br />P.O. 8ox 1988 (M-r9) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKL!ST <br />sol-01 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all seclions, answer the ten questions and <br />sign the certification section below. A copy ol this form shall be attached to each ol TWO sets of plans, ol <br />minimum 11" x 17" size. It answerinq NO to anv of the oue ions, olan check shall be reouired.6 bLu tr1 UfProlect Address: <br />Contractor Company Name: <br />Contractor License Number: <br />Fa <br />,da <br />o Etr <br />z EE <br />a EE <br />g EE <br />ro DEI <br />\1cs0 a <br />YES NO <br />tr <br />tr <br />tr <br />E <br />tr <br />D <br />22, <br />Are the following applicable to the proposed proiect? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer wlth no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so lhat the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weighl <br />system? <br />Will lhe anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ot 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed prolessional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support inlormation.) <br />2 <br />4 <br />5 <br />I certify under p€nalty ol pe.iury under the laws ol the <br />PrintName: lilrr'[f,\\eH s <br />State of <br />ignature: <br />Californ that lhe above is true: <br />{ <br />phone Number: q;^ q?-A lliO <br />Rev: 11/19/2015 <br />Date:?l./5 <br />\ <br />I <br />Email Address: