Laserfiche WebLink
.,,-{ANT{- <br />ANA <br />lLl\l[G <br />Mtn"0N <br />ICI\O <br />PlanDing &'BdildiAb Agency <br />Building Safuty Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (ulg) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana,org sol{l cBc 20,3 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />Project Address:2119 SOUTH ROSS STREET SANTA ANA CA, 92707 <br />Contractor Company Name: ar I soLAR <br />contractor License Number: 4 (q1 fZ <br />2 <br />3 <br />Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the rooP <br />Wll the PV system weigh maximum 3 pounds per square feet or less? <br />Vvlll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to'10" maximum between <br />the underside of modules and the surface of the rooP <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Wll the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Wll the PV system layout provide a three-foot wide clear access pathway per the <br />latest edition ol "Guideline for Fire Safety Elements of Solar Photovoltaic Sysfems" <br />by OCFA? (Guidelane available on the OCFA website: !-rtto iiwww ocfa ora) <br />Do the plans show a maximum horizontal anchor spacing of6 feet? <br />Do the plans show a minimum of 2-112 incn lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (includang project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacture/s PV support information.) <br />I certify under p ena of periury under the laws of the State of C e above is true <br />Print name <br />YES NOtrtr <br />trtrutr <br />Etr <br />trtr <br />tr <br />tr <br />trtr <br />4 <br />6 <br />7 <br />trtr <br />tr tr <br />I <br />o <br />10 <br />Phone Number <br />Email Address: <br />(562) 61S-4770 Oale . 07 t07 t2017 <br />1--l 4 <//to/a.to <br />X <br />X <br />Rev:211712015 <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />lnstructions: The licensed contractor of record shall lill in the address of the pro.lect, contractods <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section.*lf answering NO to any of the questions, plan check ahall be required.* <br />Signature: <br />,,.. ,/