Laserfiche WebLink
RESIDENTIAL <br />PHOTOVOLTAIC <br />GHECKLIST <br />soL-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerino NO to anv of the oues tions. Dlan check shall be required. <br />Project Address:5325 Rhonda Ave., Santa Ana, CA 92703 <br />Contractor Company Name: Complete Solar <br />Contractor License Number: 961988 C-10 <br />trtr <br />Eltr <br />trtr <br />Eto <br />trtr <br />Etr <br />YES NOgtr <br />trD <br />utr <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one rooflng layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to '10" maximum between <br />the underside of modules and the surface ol the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol 2-l12inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specilic site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />I certify under penalty of perjury under the laws of the State of California that the above is true: <br />Print Name: Steve Galindo Signature <br />PhoneNumber: 650-204-4023 Date: 07113118 <br />EmailAddress: permits@completesolar.com <br />Rev 8/1712015 <br />":r--- <br />*,SANTA <br />NA,',lr,ilffi <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box '1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />1 <br />2. <br />a <br />4. <br />6. <br />7. <br />8. <br />9. <br />10.EE