Laserfiche WebLink
*,,SANTA <br />NAJ}ilil <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-o1 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certiflcation sectjon below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17'size. lf answerin NO to an of the u e stions lan check hall be re u ired <br />L5".l+c)- fitotProiect Address: <br />Contractor Comp any Name s .l s ('r - <br />a <br />, C< . <br />4 <br />5 <br />-s <br />a00 / <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one rooflng layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to l0" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol 2-112 incn <br />embedment inlo roof raflers (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />YES NO1dl <br />, lzl) <br />3da <br />da <br />da <br />da <br />da <br />d tr <br />Phone Number <br />Email Address:s r I co,, <br />dada <br />6 <br />7 <br />I certify under_penalty qf peri{ry <br />Print Name: <br />'t?,,0"t* 'tLo <br />t(zs,t le 'l 4(.ctt <br />under the laws of the State of Califo <br />v11acl Signature <br />Date: <br />h is true <br />J J^e 1+ <br />Rev 1 1/19/2015 <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />Contractor License Number: <br />8. <br />9. <br />'10.