Laserfiche WebLink
*-SNTA <br />NA#HH <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (Ml9) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa -ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-o1 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certilication section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 1 1" x 'l 7' size. lf answerin NO to an of the stions lan check hall be re uired.u <br />L5".l+cA- fito +C.,Project Address: <br />Contractor Comp any Name:-S .l Se,rC<. <br />Contractor License Number:c,oo / <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1'l of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages ofthe plans stamped and signed by a California <br />licensed professional engineer? (including project speciflc site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />4 <br />5 <br />6 <br />7 <br />YES NO1da <br />2 dJ <br />3da <br />da <br />AJ <br />da <br />da <br />10 d tr <br />Phone Number: <br />Email Address: <br />dada <br />I <br />9 <br />I certify under_penalty qf perir{ry <br />Print Name: i,Qett 'N, <br />64 - 46dI <br />under the laws of the State of Califo <br />v4at1 Signature <br />Date: <br />Rev 11/19/2015 <br />Yzs,.t1 <br />({ co,n <br />J a) f€ <br />s true: <br />7