Laserfiche WebLink
*,,SANTA <br />ANA <br />ll,1\\l\c <br />t8tltDrrc <br />lct\tl <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />,d!EEE[la-{rk?-*35II5t?J4f }trij- I}l+5: l8 ?FIj-,;,!,ffi:a:=EEW.ffiEtImE6 t: =:f:.,;soL{1 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMTLY RESIDENCES Onty <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKL!ST <br />lnstructions: The licensed contractor of record shall complele all section <br />sign the certiflcation section below. A copy of this form shall be attached <br />minimum 11" x 17" size. lf answ fln NOtoa of the uestion la <br />Project Address:o C <br />Contractor Company Name: <br />Contractor License Number: <br />S an swer the ten questions and <br />/''t <br />2 <br />-60 <br />P'a <br />, ,za <br />4 A.l) <br />',EE)da <br />gia <br />YES NO Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maxlmum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do nol overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed wathout using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof raflers (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including pro.iecl speciflc site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />6 <br />7 <br />trtr <br />Eltr <br />fia <br />I certify unde <br />Print Name: <br />f e <br />4,h <br />nalty ol perjury u nder the laws of th California that the above is true:e State of <br />SignatureaDate: z-Phone Number: <br />Email Address: <br />5 <br />L <br />check s <br />ea <br />Rev: 11/19/2015 <br />lt <br />/.L, <br />a ,,'474-2,2.-* <br />9. <br />10. <br />4t <br />+i) <br />,/)r