Laserfiche WebLink
*-SANTA <br />NAJhffi <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(7r4) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11 x 17" size. lf answerinq NO to anv of the oues tions, plan check shall be reouired. <br />Project Address:u3{ ?,,a2 <br />Contractor Company Name: <br />Contractor License Number: <br />2 <br />3 <br />15c .a\ <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.'l l of the California Fire Code, and is this shown on the roof plan? <br />Wll the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Wll the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Wll the PV system weigh maximum 4 pounds per square feet or less? <br />\Mll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />\Mll the PV system be installed with a space of 2" minimum to 10'maximum between <br />the underside of modules and the surface of the roof? <br />Wll the PV system be installed without using any ballast system or counter-weight <br />system? <br />\Mll the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Wll the minimum 5/16" lag screws be installed with a minimum ol2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans VVET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />er penalty of <br />K.;r,lu..;Signature <br />under the laws of the State of California that the above is true: <br />Phone Number: "\\\. 3t ) <br />Email Address <br />YES NOEn <br />Etr <br />tr <br />tr <br />tr <br />tr <br />\l <br />4 <br />u bo <br />,Eu <br />'tso,.\u <br />ro -El E <br />I certify und <br />Print Name: <br />\' 13qt Date: t-{ <br />Rev: 8/1712015 <br />1