Laserfiche WebLink
*-SNTA <br />NA <br />II,I\lIlllC <br />lrlll.Nc <br />rfit0 <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached STNGLE FAM|Ly RESTDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO s ets of plans, of <br />minimum '1 1 " x 17" size. lf answerinq NO to an v of the questions. olan check shall be required <br />Project Address: <br />Contractor Comp <br />u34 ?,. <br />any Name: <br />Contractor License Number:5c <br />Are the following applicable to the proposed project? <br />\Mll the PV system layout provide the required threejoot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? <br />\Mll the PV system be installed on a roof having only one roofing layer with no <br />ovedays? <br />Wll the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Wll the PV system weigh maximum 4 pounds per square feet or less? <br />Wll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Wll the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />VMll the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Wll the minimum 5/16" lag screws be installed with a minimum of 2-1l2 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans VIET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, pV layout, <br />anchorage spacing, anchorage details and manufacturer's pV support information.) <br />YES NO <br />2 <br />3 <br />6 <br />7 <br />4 <br />tro <br />trtr <br />trs <br />Eu <br />tsn <br />\s <br />ro 'El El <br />tr <br />tr <br />tr <br />tg <br />E <br />9 <br />I certify unde <br />Print Name:Signature <br />Phone Number: "\\\. <br />Email Address <br />e State of California that the above is true:r pelalty of(."tr pgrjury under the laws of th <br />\5<o )i-; <br />Rev 8/1712015 <br />35\.1jcl Date: q )e