Laserfiche WebLink
1 <br />RES!DENT!AL <br />PHOTOVOLTAIC <br />CHECKLIST <br />*,,SANTA <br />NA <br />llr\]1\c <br />TBIIDNC <br />$NI <br />sol{1 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer lhe ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x17" size. lf answerinq NO to anv of the questions, plan checkshall be required. <br />Project Address:4. <br />Contractor Company Name: <br />Contractor License Number: <br />T)O d4b.- (a^lrtr(fly'6 <br />9g 3</r z A <br />4 <br />5 <br />YES NOEtr <br />trtr <br />Ertr <br />Ertr <br />10 Etr <br />2 <br />3 <br />6 <br />7 <br />8 <br />9 <br />Etr <br />Etr <br />Etr <br />Etr <br />tstr <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum o12-112 inch <br />embedment into roof rafters (with preirilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including proje if pla n PV layout, <br />anchorage spacing, anchorage details and o tion.)S <br />I certify under penalty of perjury under the laws of the State of a lifor <br />prinl 11"r". 74tlr- I{A rlSa n/ signatu <br />Phone Number: GZb\ 70, -3\3D Date:5-lt7lt7 <br />Revl 11/19/2015 <br />?e v <br />true: <br />c-t \rTl>le?() Zn o e*e".=^rci>. <-6 ,^ <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />Email Address: