My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20171916 - Permit
PBA
>
Building
>
Permits
>
S
>
Sixth St
>
5103 W Sixth St
>
20171916 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2021 1:26:00 PM
Creation date
6/1/2021 1:25:59 PM
Metadata
Fields
Template:
Permit
Permit Number
20171916
Full Address
5103 W Sixth St
Permit ID
268519
Master ID Number
2020-161615
Project Name
Miscellaneous Counter1 Permit
Street Number
005103
Street Direction
W
Street Name
Sixth
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
9/21/2020
Issued Date
9/21/2020
Finalized Date
10/8/2020
Flood Zone
A-0602320256J
Description of Work
Install solar panels, fees pd on 101104697
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Solar PV Standard Plan - Simplified <br />Central/String !nverter System for One- and Two-Family Dwellings <br />SINGLE.LINE DIAGRAM #1 - NO STRINGS COMBINED PRIOR TO INVERTER <br />I rac DESCRIPTION AND CONDUCTOR TYPT <br />CONDUCTOR <br />srzE <br />NUMBER OF <br />CON DUCTORS <br />CO N DUIT/CA BLE <br />TYP I coNDUlT StZt <br />l0 )FRFF AIRUSL,2 OR PV.WIRI X <br />FRF F A]I] <br />B <br />EGC/GEC: <br />!0 2 EMT 3t4" <br />LGc/GLc CEC 10 EMI 314" <br />l EMI 3t4"10 <br />314" <br />c <br />tcc/Gtc: oFC 8 1 EMT <br />D 10 j EMI 314' <br />AG <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />6 & 8 REQUTRED) <br />LOAD CENTER INSTALLED? YES <br />CHECK A BOX FOR WHETHER SYSTEM lS GROUNOTD OR UNGROUNDED: []1 CnOUr,rOeO ltnCtUDE GEC] <br />FoR uNGRouNDED sysrEMs: f l uruenouloto <br />. DC OCPD MUST DISCONNECT BOTH CONDUCTORS OF EACH SOURCE CIRCUIT <br />. UNGROUNOED CONDUCTORS MUST BE IDENTIFIED PER 210,5(C}, WHIIE-FINISHED CONDUCTORS ARE NOT PERMITTED. <br />PV PRODUCTION METER.SEPARATE AC DISCONNECT INSTALLED?NO <br />CONNECT TO INVERTER #2 (USE LINE <br />' Consult with your local AHI and /or Utility <br />2) <br />A A AAA A MAIfl SERVICE PANTI. <br />t5 MODULES r A A <br />wooulrs I <br />MODUTES t <br />t <br />coN DUIT SCHEDULE <br />ENIER "N/A" WHERE SUITASLE FOR <br />MODU LES <br />cg1 <br />cB2 <br />PV OCPD <br />OCPD <br />NOT USING CONDUIT OR CAELT <br />AS PERMITTED BY CODEFGC /cFC. Ct C n l EM I 314 <br />OC/OC CONVERTERS ART USED. CHECK THT BOX BITOW THE CORRESPONOING CONFIGURATION <br />I <br />o <br />CONVERTE <br />DCIDC CONVERTERS ARE ATL RUN <br />rN s€Rrt5 (FtxED souRcE ctRcutT <br />PARALLEI- DCIDC CONVERTERS ON ONE <br />SOURCE CIRCUIT IfIXED UNIT VOTTAGE <br />SOLAR PV MODULE / STRING <br />DC/OC CONVERTERS INSTALLED"NO <br />SOURCE CIRCUIT <br />tr tr tr <br />tr tr
The URL can be used to link to this page
Your browser does not support the video tag.