Laserfiche WebLink
Plannlng & Bulldlng Agoncy <br />Bulldlng Safety Division <br />20 Civic Center Plaza <br />P.O. Box '1988 (lil-i9) <br />Santr Ana, CA 92702 <br />{7r4) 6476800 <br />www.aanta-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKL!ST <br />sol-01 cBc 2013 <br />Solar Photovoltalc (PV) Checklist for Detached SINGLE FAIIIILY RESIDENCES Only <br />lnsFuctions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerino NO to anv of the ou plan check shall be reouired. <br />Project Address: '1502 W River Ln, Santa ana, CA 92706 <br />Contractor Company Name:Tesla <br />388 104Contractor Llcense Number: ( <br />YES NO Are the followlng applicabh to the proposed pioject? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 1 of the Califomia Fire Code, and is this shown on the roof plan? <br />Wll the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />\Mll the PV anay be flush mounted lo the existing roof so that the plane of the <br />modules (panels) are parallel to the plan€ of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will th6 PV syst€m be installed with a space of 2'minimum to 10'maimum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag scrows be installed with a minimum ot 2-112inch <br />embedment into roof rafters (with predrilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pag6s of the plans WET stamped and signed by a Califomia <br />licensed professional engineer? (including proiect sp€cific site plan, PV layout, <br />anchorage spacjng, anchorage details and manufuc.ture/s PV support information.) <br />EI tr <br />trtr <br />atr <br />EIDatr <br />trtr <br />3 <br />4 <br />5 <br />6 <br />7. ao <br />8 trtr <br />e. tro <br />10. El El <br />I certlfy under penalty of perjury under the laws of the Stato ol California that the above is true: <br />print Name: MIKE CURRAN Signature . Michael Curran 3:iil"l;iliiI'rli',Y';lrl1';tr;j <br />phone Number: 609-634-2395 <br />Email Address: mCu rran@tesla.com <br />R€vr 8/1712015 <br />oak, 5/3t/2Ot8 <br />-,-SANTA <br />NAqHI