Laserfiche WebLink
EXPEDITED PERMIT PROCESS FOR PV SYSTEMS <br />STANDARD STRING SYSTEM <br />The Solar America Board for Codes and Standards (Solar ABCS) Expedited Permit Pro- <br />cess provides a means to differentiate systems that can be permitted quickly and easily <br />due to their similarity with the majority of small-scale PV systems. Those systems with <br />unique characteristics may be handled with small additions to this Expedited Permit <br />Process or may require much more information, depending on the uniqueness of the <br />installation. <br />The tollowing pages contain forms for rhe Standard String System to use with rhe Expe- <br />dited Permit Process. The Micro-lnverter, AC Module, and Supply-Side Connection forms <br />are also available as inreractive PDF files at www.solarabcs.org/permitting. In jurisdic- <br />tions that have adopted the Expedited Permit Process for PV Systems, rhese forms can <br />be Filled out electronically and submitted in either printed form and via email. An elec- <br />tronic format is used so that the supplied information is standardized and legible For the <br />local jurisdiction. <br />R'" E r v ED <br />JUN O I ntC'l <br />?-arLAoT{ <br />EXPIDITED PERMIT PROCESS FOR PV SYSTEMS <br />City of Sari,. , ..,.r