Laserfiche WebLink
EXPEDITED PERMIT PROCESS FOR SMALL-SCALE PV SYSTEMS <br />STANDARD STRING SYSTEM <br />The information in this guideline is inrended to help local jurisdictions and conLractors identify when PV system insEllarions <br />are simple, needing only a basic review. and when an insEllation is more complex. It is likely that 50%-75% of all residential <br />systems will comply wirh these simple criteria. For projects that fail ro meet the simple criteria, resolurion sreps have been <br />suggesled lo provide as a path to permit approval. <br />Requireil Infonnation for Permit: <br />l. Site plan showing location of major components on the property This drawing need not be exactly to scale, bur ir <br />should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings <br />with a 3 perimeler space at ridge and sides may not need separate fire service review. <br />2. Electrical diagram showing PV array conhguration, wiring system, overcurrent protection, invener, disconnects, <br />required signs, and ac connection ro building (see supplied standard electrical diagram). <br />3. Specihcation sheets and installation manuals (if available) for all manufactured components including, but nor <br />limited to, PV modules, inverrer(s), combiner box, disconnects, and mounting system. <br />Step 1 : Structural Review o[ PV Array Mounting System <br />ls the array to be mounted on a defined, permitted roof structure?Yes E No <br />U No due to non-coupliant roo.f or a ground mount, submit completed worksheetJor the structure WKSI <br />Roof Infonnation: <br />1. Is the rooflng type lightweight (Yes = composition. lightweight masonry. metal, etc. .) <br />Comp shingle <br />YES <br />If No, submit completed worksheet for roof stucture WtrSI fNo = heayy masonry, slqte, etc...) <br />2 Does the roof have a single roof coveringt Elyes n r,lo <br />If No, submit completed worhsheet Jor roof structure WRSI. <br />3. Provide method and type of weatherproohng roof penetrations (e.g flashing, caulk)Flashing, geocell sealant <br />tem Manufacturer ZeP product Name and 14o,1"14 Comp Mount Type C <br />t ot PV Modules 3n6 nu;11 495 lbs <br />a Mounting Sys <br />b. Total Weigh <br />c Total Number of Attachment Poinrs 27 <br />d. Weight per Attachment Point (b: c)bs (if greater than 45 lbs, see WKS I ) <br />22.128 <br />e Maximum Spacing Between Attachment Points on a Rail 48 <br />maximum spacing allowed based on maximum design wind speed) <br />Tolal Surface Area of PV Modules (square feet)464 <br />nches (see product manual for <br />t. <br />e <br />Irl <br />Distributed Weight of PV Module on Roof (b + l)3.0 lbs/ftl <br />If distributed weight ol the PV system b greater than 5 lbsff , see WKS 1 . <br />Step 2: Elecvical Review of PV System (Calculations for Electrical Diagram) <br />In order for a PV system to be considered for an expedited permit process, the following must apply: <br />l PV modules, utility-interactive inverters, and combiner boxes are identifred for use in PV systems <br />2. The PV array is composed of 4 series strings or less per invefter <br />3. The toral inverter capacity has a continuous ac power output 13,440 Watts or less <br />4. The ac interconneclion point is on the load side of service disconnecting means (690.64(8)). <br />5. One of the standard electrical diagrams (El.l. El.la. El.lb. or El.lc) can be used to accurarely represenr rhe PV <br />system lnteractive PDF diagrams are available at www.solarabcs.org/permitting. <br />FilI out the standard electrical diagram completely. A guide to the electrico.l diagram is proyided to help the arylicant <br />understand each blank tofll in. If the electrical system is more complex than the standatd elecffical diagram can efJectively <br />communicqte, proyide an slternatiye diagram with appropriate d.etail. <br />2 ExpEDrrED PERMTT PRocEss FoR PV sysrEMs <br />M oltflting Sy stem Infonnatton: <br />l. Is the mounting structure an elgrneered product desrgned to mount PV modules wirh no more than an I8" gap <br />benealh thc module [rames? Llyes Ll tto <br />IJ No, provide d.etails oJ structurol attachment certijed b)/ a design proJessional. <br />2. For manufactured mounting systems, fill out information on the mounting syitem below: