Laserfiche WebLink
,--SANTA <br />NA,'ffiH <br />Planning & Building Agency <br />Bullding Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647.5800 <br />www.santa.ana.org <br />soL-01 cBc 2013 <br />Project Address:4509 SUNSWEPT AVE, SANTA ANA, CA 92703 <br />Contractor Company Name:SOUTHWEST SUN SOLAR, INC <br />contractorLicenseNumber: 1004667 <br />YES NO Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layerwith no <br />overlays? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizonlal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of lhe plans WET stamped and signed by a Caliiornia <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spaclng, anchorage delails and manufacturefs PV support information.) <br />1 tr tr <br />2 8tr <br />Eltr <br />tstr <br />Ettr <br />trtr <br />atr <br />4 <br />5 <br />6 <br />7 <br />I tstr <br />I Etr <br />10 Etr <br />I certify under penalty of pefury under the laws of the Slate of California is true: <br />prinr Name. TRANG CONG PHAM signature <br />phone Number: 714 582 3909 Date: <br />Emait Address: PERIM lT <br />Rev: 8/1 7/201 5 <br />SOUTHWESTSUNSOLAR.COM <br />thpra6ove <br />l< <br />RESIDENTIAL <br />PHOTOVOLTAIG <br />CHECKLIST <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMtLy RESIDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten queslions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. ]f answerinq NOto anv of the questions. plan check shall be reouired.