Laserfiche WebLink
ffiSfililflili <br />gicNct <br />id**i+i:ffi3,P"vE <br />r v E <br />P.o. Box 1e88(M-1sr SEP Z4 Z01BSanta Ana, CA 92702 <br />(714) 647.5800 <br />www.santa-ana.ors City of Santa Ana <br />RESIDENTIAL <br />PHCTOVOLTAIC <br />CHECKLIST <br />D <br />sol"01 cBc 2013 <br />solar Photovortaic (Pv) checklist for Detached sINGLE FAMILy RESIDENCES only <br />lnstructions: The licensed contraclor of record shall com plete all sections, answer the ten questions andsign the cerlification section below, A copy of this form s hall be attached to each of TWO sets of plans, oFminimum 11" x 17" size. lf answerin N to an the ue stion s lan check shall b ere u ired.o <br />Project A.ddress: <br />Contractor Company Name: <br />Contractor License Number: <br />1 <br />2 <br />3 <br />ves/Ho <br />tItrtr <br />Cu <br />J" <br />Are the following applicable to the proposed project? <br />will the PV system layout provide the required three{oot wide clear access pathways <br />per Section 605.1 1 of ths California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Wll the PV array be flush mounled to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any rool edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will th6 PV system be installed with a space ot 2,,minimum to .10', maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter_weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minlmum ol 2-1lZ inch <br />embedment into roof rafters (with pre-drilred hores) and is thls minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a Califomia <br />licensed professional engineer? (including project specific site plan, pV layout, <br />anchorage spacing' anchorage detairs and minufacturer's pv support intormation.l <br />4 <br />5 <br />6 <br />7 <br />D <br />tr <br />B <br />9 <br />{o <br />dn <br />10 tr <br />Print Name <br />Phone Number: <br />Email Address <br />I certify under penalty of perj the laws of the State of Catiforni <br />Signature <br />Rev; 8/1712015 <br />u und <br />Date <br />hat bove is true: