Laserfiche WebLink
,s <br />NA'ffi <br />flIY <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-o1 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certificatjon section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />o NO to anv of the questions . olan check shall be reou iredminimum 11' x 17" size. lf answerin <br />Project Address:DOV-Q9I--- WO\ <br />Contractor Company 113ms...-S\ry1{e\y'z^\ <br />Contractor License Number:-?sol t t-,1 <br />YES NO <br />tr <br />6u <br />@tr <br />ds <br />6o <br />f33() <br />4 <br />5 <br />2 <br />3 <br />6 <br />7 <br />8 <br />tr <br />tr <br />tr <br />tr <br />4 <br />q <br />d <br />dd <br />4 <br />9 <br />10 <br />lcertify under penalty of periury under the laws of th <br />prinr Name: KqrtSEq RVSSC t I <br />e State of California th e above is true <br />Phone Number: q4q 7BZ gO47 Date <br />Emair Address: FOY lSSq Y! SSel\1) <br />II L<\Y <br />f\-rr\ ' C <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required threejoot wide clear access pathways <br />per Section 605.1 '1 of the California Fire Code, and is this shown on the roof plan? <br />\ /ill the PV system be installed on a roof having only one rooflng layer with no <br />overlays? <br />Will the PV array be flush mounted to the exlsting roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where lhe modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />\ /ill the PV system be installed with a space of 2" minimum to l0" maximum between <br />the underside of modules and the suriace of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimurn ol 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including prolect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />Signature: <br />Rev I 1i 19/2015