Laserfiche WebLink
PtrCINtrNTIAI <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol,0r cBC 2!11 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete ail sections, answer the ten questlons and <br />sign the certlfication section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />qNOtoan of the o ues tio ns. Dlan check shall be reou iredmrnimum 11' x 17'size lf answerin <br />Project Address:t31C fQ 9t---: WC^. <br />Contractor Company r.tu,ne: SUv']6\41 <br />ontractor License Number: ?SOl .<! t'l <br />YES NC Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? <br />VVill the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the piane of the roof? <br />U/ill the PV system weigh maxlmum 4 pounds per square feet or less? <br />\ /ill the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />U/ill the PV system be installed with a space of 2" minimum to l0" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />U/ill the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol 2-112 tnch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />D <br />2 <br />3 <br />6 <br />7 <br />4tr(u <br />&n <br />4 <br />5 <br />dudu <br />@u <br />8 <br />9 <br />6s <br />@tr <br />ds <br />6o10 <br />Signature <br />phone Number: q\q ZgL SO47 Date L<\Y <br />I certify under penalty of perjury under the laws of th <br />print Name: KqrtsEcl RVSqe I I <br />Emair Address: t< O \r rSSq . vU SSe I \ <br />e State of California th he above is true <br />ll <br />r\-rY\ - <br />Rev 1 l/19/2015 <br />ffi0lufulrIr <br />,. NA,M <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O, Box 1988 (lVl-19) <br />Santa Ana, CA 92702 <br />(714) 647.s800 <br />www.santa-ana.org <br />c