My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20170742 - Permit
PBA
>
Building
>
Permits
>
R
>
Richland St
>
1514 W Richland St
>
20170742 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2021 12:56:56 PM
Creation date
6/3/2021 12:56:55 PM
Metadata
Fields
Template:
Permit
Permit Number
20170742
Full Address
1514 W Richland St
Permit ID
262979
Master ID Number
2020-157584
Project Name
Miscellaneous Counter1 Permit
Street Number
001514
Street Direction
W
Street Name
Richland
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
2/5/2020
Issued Date
2/5/2020
Finalized Date
2/28/2020
Flood Zone
X-0602320257J
Description of Work
Install solar panels/fee pd on 101103047
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERMIT PROCESS FOR SMALL-SCALE PV SYSTEMS <br />STANDARD STRING SYSTEM <br />The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations <br />are simple, needing only a basic review and when an installation is more complex. It is likely that 50 % -7 5% of all residential <br />systems wilt comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been <br />suggested m provide as a path to permit approval. <br />Required lflJormation for Peflnit: <br />1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it <br />should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings <br />with a 3'perimeter space at ridge and sides may not need separate fire service review <br />2. Electrical diagram showing PV array configuration, wiring system, overcurrent prorection. inverrer, disconnects, <br />required signs, and ac connection to building (see supplied srandard electrical diagram). <br />3. Specihcation sheets and installation manuals (if available) for all manufactured components including, but nor <br />limited to, PV modules, inverter(s), combiner box, disconnecrs, and mounting system. <br />Step '1 : Structural Review of PV Array Mounting System <br />Is the array to be mounted on a defined, permitted roof structure?ves E no <br />U No due to non-compltant roo.f or a ground mount, submit completed worksheet Jor the structure wKSl <br />RooJ InJofinotion: <br />COT,,IP SHINGLEl ls the roofing rype lightweight (Yes = composition, Iightweighi masonry, meral, etc...) <br />If No, submit completed worksheet.for rool structure WKSI (No = heayy masonry, slate, etc. ..) <br />2. Does rhe roof have a single roof coveringz Eves Ef.lo <br />U No, submit completed vorksheet lor rool structure WKSI . <br />3. Provide method and type oI weatherproofrng roof penetrations (e.g. flashing, caulk)FLASHING Y CAULK <br />M ounting Sy s t ern I nfonnation : <br />neered product designed to mount PV modules with no more than an 18" gap <br />Yes [No <br />l. Is the mounting structure an en <br />If No, provide details ol structural attachment certifed by a design professional. <br />2. For manufactured mounting systems. fill out information on the mounting sysrem below <br />benearh the module lrames? <br />b. Total Weig <br />c. Total Number of Artachment Points 30 <br />d. Weighl per Attachment Poinr (b + c) 29.7 lbs (if greater than 45 lbs, see WKS I ) <br />a. Mounrinp svsrem Manulacrurer oulcK MOUNT producr Name 2n6 14s661,q CLASSIC COMPOSITION MOUNT <br />ht of PV Modules 2n6 P2;15 891 lbs <br />Maximum Spacing Between Attachment Points on a Ra <br />maximum spacing allowed based on maximum design <br />il 48 inches (see product manual for <br />Tohl Surface Area of PV Modules (square feet)549 <br />wind speed) <br />fr'? <br />Distributed Weight of PV Module on Roof (b + l)1.62 lbs/ftl <br />$ distributed weight oJ the PV system is greater than 5 lbs[t', see wKSl . <br />Step 2: Electrical Review of PV System (Calculations lor Electrical Diagram) <br />In order for a PV system to be considered for an expedited permit process, the following must apply: <br />1. PV modules. utility-interactive inverters, and combiner boxes are identified for use in PV systems. <br />2. The PV array is composed oF 4 series strings or less per inverter. <br />5. The total inverter capaciry has a continuous ac power output 13,440 Watts or less <br />4. The ac interconnection point is on the load side of service disconnecting means (690.64(8)). <br />5. One of the sEndard electrical diagrams (E1.1, E1.l a, E1.lb, or El.lc) can be used ro accurately represent the PV <br />system. Interacrive PDF diagrams are available at www.solarabcs.org/permifting. <br />Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant <br />understand each blanh to jU tn. U the electrtcal system is more complex than the standard electrical diagrdm can elJecttyely <br />communicate, provide an alternative diagram vith appropriate detail. <br />2 EXPEDITED PERMIT PROCESS FoR PV SYSTEMS <br />{] <br />i.
The URL can be used to link to this page
Your browser does not support the video tag.