Laserfiche WebLink
EXPEDITED PERMIT PROCESS FOR PV SYSTEMS <br />STANDARD STRTNG SYSTEM <br />The Solar America Board for Codes and Standards (Solar ABCS) Expedited Permir Pro- <br />cess provides a means to diflerentiate systems that can be permitred quickly and easily <br />due to their similarity with rhe majority of small-scale PV sysrems. Those systems with <br />unique characteristics may be handled with small additions ro rhis Expedired Permir <br />Process or may require much more information, depending on rhe uniqueness of the <br />installation. <br />The following pages contain forms for the Standard Srring Sysrem ro use wirh rhe Expe- <br />dited Permit Process. The Micro-lnverter, AC Module, and Supply-Side Connecrion forms <br />are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- <br />tions that have adopted the Expedited Permit Process for PV Systems, these forms can <br />be filled out electronically and submified in either prinred form and via email. An elec- <br />tronic format is used so that the supplied informarjon is standardized and legible for rhe <br />local jurisdiction. <br />EXPEDITED PERMIT PROCESS FOR PV SYSTEMS <br />I 7"7 +z