Laserfiche WebLink
PV-C PV-C <br />NON-FUSED <br />AC DISCONNECT <br />UTILITY <br />GROUNDING ROD(S) <br />SET @ 6' APART MIN. <br />4 <br />INVERTER #1 <br />PV-B <br />MAIN SERVICE PANEL <br />UTILITY METER <br />·UPGRADING (E) MAIN TO (N) <br />175A MAIN | 200A BUSBAR <br />·(N) 60A PV OCPD C/B TO BE <br />INSTALLED OPPOSITE END <br />OF MAIN OCPD <br />M SOLAR: HC 144BB-440W MODULE <br />MOD. IMP: (10.74A) * (1 STRING) = 10.74A <br />MOD. ISC: (11.33A) * (1 STRING) = 11.33A <br />SYSTEM DC WIRING: STRING(S) OF (12) <br />VMP: (41.00 VDC MPP) * (12 MODS) = 492.0 VDC <br />VOC: (49.90 VOC) * (12 MODS) = 598.80 VDC <br />VMAX: (598.80 VDC) * (114%) = 682.63 VDC <br />STRING(DC): 5280W <br />ARRAY 1: (12) MODULES <br />ARRAY 2: (12) MODULES <br />(2) #10 PV-WIRE <br />UNDER EACH MODULE <br />FREE-AIR (SECURED) <br />(MANUFACTURE WIRE)1 <br />2 <br />PV-A 3 <br />J-BOXJ-BOX <br />·DC SYSTEM AS UNGROUNDED TYPE <br />·ALL CONDUCTOR(S) TO BE RAN IN RACEWAY <br />·SYSTEM EQUIPPED WITH RAPID SHUTDOWN FUNCTION PER [CEC 690.12] <br />·PHOTOVOLTAIC SYSTEM GROUND WILL BE TIED INTO EXISTING GROUND AT <br />MAIN SERVICE FROM DC DISCONNECT/INVERTER AS PER [NEC 250.166(B)] <br />"THE GROUNDING ELECTRODE CONDUCTOR SHALL NOT BE SMALLER THEN <br />THE LARGEST CONDUCTOR SUPPLIED BY THE SYSTEM & NOT SMALLER THEN <br />#8 AWG." <br />· SYSTEM GROUNDING ELECTRODE CONDUCTOR FOR PHOTOVOLTAIC SYSTEM <br />SIZED TO MEET THE REQUIREMENTS OF 250.66 (AC) & 250.66 (DC), 690.74(C) <br />NOT SMALLER THEN #8 AWG <br />· EQUIPMENT OPERATING 150V OR GREATER SHALL ONLY BE SERVICED OR <br />REPLACED BY QUALIFIED PERSONNEL. FIELD PROTECTION MAY BE IN THE <br />FORM OF CONDUIT, CLOSED CABINET OR AN ENCLOSURE WHICH REQUIRES <br />USE OF TOOLS TO OPEN. <br />· SOLAR PHOTOVOLTAIC SYSTEM EQUIPMENT WILL BE INSTALLED IN <br />ACCORDANCE W/ REQUIREMENTS OF ARTICLE 690 OF THE 2019 CEC. <br />· MIN. HEIGHT OF CONDUIT ABOVE ROOF TO MATCH TEMP. DE-RATING <br />FACTOR <br />· PHOTOVOLTAIC DC CONDUCTORS ENTERING THE BUILDING SHALL BE <br />INSTALLED IN METAL CONDUIT & THE CONDUIT SHALL BE LABELED "CAUTION <br />DC CONDUIT" EVERY 10-FEET <br />· SMOKE ALARMS & CARBON MONOXIDE DETECTORS WILL MEET THE <br />NECESSARY REQUIREMENTS PER [CRC R314, R315] <br />·UTILITY COMPANY WILL BE NOTIFIED PRIOR TO ACTIVATION OF THE <br />PHOTOVOLTAIC SOLAR SYSTEM <br />·GROUNDING TO BE INSTALLED PER MODULE MANUFACTURE INSTRUCTIONS. <br />GROUND METHOD: GROUND LUGS WITH BARE COPPER WIRE <br />·CENTER-FED & OFF-SET SWITCHBOARDS / PANEL BOARDS ARE NOT RECOGNIZED TO <br />MEET THE REQUIREMENTS OF [CEC 705.12(D)(7)] <br />·FOR ELECTRICAL SERVICE REPLACEMENTS, PROVIDE BONDING TO THE METAL PIPES OF <br />NATURAL GAS, HOT & COLD WATER PER [CEC 250.104] <br />·IF THE EXISTING MAIN SERVICE PANEL DOES NOT HAVE VERIFIABLE GROUNDING <br />ELECTRODE: IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ONE <br />·THE G.E.C. MUST BE CONTINUOUS AS PER CEC 690.47(A) & 250.64(C) <br />·A SINGLE ROD ELECTRODE SHALL BE SUPPLEMENTED BY AN ADDITIONAL ELECTRODE <br />PER 2019 CEC 250.53(A)(2) <br />· THE COLOR OF UNGROUNDED CONDUCTORS SHALL BE OTHER THEN FOR GROUNDED, <br />(NEUTRAL), CONDUCTORS (SOLID WHITE, GRAY, OR WITH 3 WHITE STRIPES, 200.6, <br />200.7 & 400.22), AND GROUNDING CONDUCTORS (BARE W/O COVERING, GREEN, OR <br />GREEN WITH YELLOW STRIPES, 250.119 & 400.23) PER 310.110(C) <br />·METAL UNDERGROUND WATER PIPE: INDICATE THE CONNECTION TO THE INTERIOR <br />METAL WATER PIPING SHALL BE MADE W/IN 5' FROM THE POINT OF ENTRANCE PER <br />250.68(C)(1) <br />ELECTRICAL EQUIPMENT LIST <br />#ITEM DESCRIPTION QTY. <br />1INVERTER #1 SOLAREDGE: SE10000H-US4 <br />24MODULE M SOLAR: HC 144BB-440W 1 <br />24POWER <br />OPTIMIZER SOLAREDGE: P4852 <br />1JUNCTION BOX UL-LISTED WATER-TIGHT <br />NEMA 3R RATED3 <br />5 <br />6 <br />1PV BREAKER <br />(OCPD)60A-2P, 240V 7 <br />6 MAIN SERVICE <br />PANEL 1 <br />UPGRADING (E) MAIN <br />SERVICE PANEL TO <br />(N) 175A MAIN | 200A BUSBAR <br />5 160A, 2P-240V, BLADE TYPEAC DISCONNECT <br />(NON-FUSED) <br />SOLAREDGE: SE10000H-US INVERTER <br />MAX AC OUTPUT: 10000WAC <br />MAX DC INPUT: 15500WDC <br />NOM VOLTAGE: 240VAC <br />MAX INPUT VOLTAGE: 480VDC <br />NOM DC INPUT VOLTAGE: 400VDC <br />MAX CONT. OUTPUT CURRENT: 42A <br />MAX INPUT SHORT CIRCUIT: 45A <br />SOLAREDGE: P485 OPTIMIZER <br />MAX VOLTAGE: 80VDC|INPUT DC: 485W <br />MAX ISC: 11ADC|MAX DC INPUT: 12.5ADC <br />STRING MIN.: 6|MAX PER STRING: 5700W <br /> (SE7600-SE11400: 6000W) <br />UTILITY <br />PREPARED BY:DATE: <br />PROJECT #: <br />SHEET NAME: <br />SHEET #: <br />PROPOSED EQUIPMENT:SCOPE OF WORK: HOMEOWNER:CONTRACTOR: <br />PV-E.01 <br />ELECTRICAL <br />CONDUCTOR AMPACITY CALCULATIONCONDUCTOR SCHEDULE <br />PROJECTED MINIMUM SYSTEM VOLTAGE <br />MAXIMUM OCPD CALCULATION <br />EQUIPMENT DATA SYSTEM CALCULATIONS <br /> (40 A) * (0.58) * (0.80) = 18.56A >PV-B DESIGN (17.67A) > ROOFTOP <br />AMPACITY <br />TABLE 310.15(B)(16) <br />RATING @ 90° <br />(4) ## THWN-2 <br />(40 A) <br />CORRECTION FACTOR <br />TABLE 690.31(A) <br />AMBIENT TEMP. @ 61 -70° C <br />TEMP. RATING @ 90° <br />(0.58) <br /> (55A) * (0.87) * (1.00) = 47.85A >PV-C DESIGN (40.59A) > GROUND <br />AMPACITY <br />TABLE 310.15(B)(16) <br />RATING @ 90° <br />(4) #8 THWN-2 <br />(55A) <br />CORRECTION FACTOR <br />TABLE 690.31(A) <br />AMBIENT TEMP. @ 41 - 45° C <br />TEMP. RATING @ 90° <br />(0.87) <br />ADJUSTMENT FACTOR <br />TABLE 310.15(B)(3)(a) <br /># OF COND. (3) MAX. <br />(1.00) <br />SYSTEM AC WIRING TOTAL: ENTIRE SYSTEM <br />SYSTEM WAC: 9741.6WAC <br />MODULE ISC: 11.33A * 156% = 17.67A >PV-B DESIGN <br />SYSTEM IMP: 40.59A >PV-C DESIGN <br />SYSTEM PMAX: 52.50A ----> 60A C/B >SYSTEM OCPD <br />SYSTEM AC WIRING RUN: INVERTER #1 <br />CONTINUOUS OUTPUT CURRENT (IMP): <br />(410.0 PTC RATING) * (24 MOD.) * (99.0% CEC INV. EFF.) = <br />9741.6WAC / 240VAC = 40.59A <br />MAX OUTPUT CURRENT (PMAX): <br />42.0A* 125% = 52.50A ---> 60A OCPD C/B <br /> PV MODS. > J-BOX (PV-A) <br /> (4) #10 PV-WIRE (L1, L2) <br /> (1) # 6 BARE COPPER - EGC CONT. (G) <br /> FREE-AIR SECURED <br /> J-BOX > INV. (PV-B) <br /> (4) #10 THWN-2 (L1, L2) <br /> (1) #8 THWN-2 AWG EGC CONT. (G) <br /> RAN THROUGH: 3/4 " EMT <br /> INV. > AC DISCO. > MSP (PV-C) <br /> (2) # 8 THWN-2 (L1, L2) <br /> (1) #8 THWN-2 AWG EGC CONT. (G) <br /> RAN THROUGH: 3/4 " EMT <br />ADJUSTMENT FACTOR <br />TABLE 310.15(B)(3)(a) <br /># OF COND. (4 - 6) MAX. <br />(0.80) <br /> (25°C - (22.2°C + 22°C) * (-0.36%/°C) = 6.92% VOLTAGE DROP <br /> (41.0VMP) * (6.92%) = 2.84V PER - (41.0VMP) = 38.2V VMP <br /> (38.2V) * (ARRAY OF 12) = 457.95V @ AVR. HIGH 22.2°C <br />(200A BUSBAR) * (120%) = 240A MAX. <br />175A MAIN BREAKER + 60A PV BACKFEED = 235A <br />235A ≤ 240A PER [CEC 705.12 (B)(2)(3)(b)] <br />LARSUN SOLAR <br />CSLB: #583458 (C-46) <br />ADDRESS: 439 E HARRISON ST. UNIT E <br />CITY|ZIP: CORONA | CA | 92879 <br />PHONE: (951) 298-9007 <br />best solar <br />3/15/2022 <br />HP-102 <br />INSTALL A NEW 10.56kW (DC)|9.74kW(AC)|9.76kW (CEC AC) PV SOLAR SYSTEM ON AN <br />(E) RESIDENTIAL ROOF. ALL WORK TO BE CONDUCTED UNDER AN ACTIVE CSLB LICENSE <br />& SHALL ADHERE TO ALL FEDERAL|STATE|LOCAL LAWS & CODES. PLEASE REFERENCE <br />ALL CODE(S) THROUGHOUT THIS PLAN SET FOR FULL COMPLIANCE. <br />THE ROD SELLON RESIDENCE <br />2329 PARK DR. <br />SANTA ANA | CA | 92707 <br />APN #: 14014234 <br />ALL-AMERICAN <br />SOLAR SERVICES <br />L.L.C. <br />x AJC <br /> (24) M SOLAR: HC 144BB-440W MOD. <br /> (24) SOLAREDGE: P485 OPTMZR. <br /> (1) SOLAREDGE: SE10000H-US INV. <br />2329 S. Park Drive <br />06/03/22