Laserfiche WebLink
5 MountingSMA Solar Technology AG <br />Installation Manual SBxx-1SP-US-41-IA-xx-12 25 <br />Dimensions for mounting: <br />126.75 <br />(4.99) <br />126.75 <br />(4.99) <br />153 <br />(6.02) <br />153 <br />(6.02) <br />1 579.2 <br />(7.06) <br />179.25 <br />(7.06) <br />203 <br />(7.99) <br />203 <br />(7.99) <br />535 <br />(21.06) <br />31 <br />0 <br />(1 <br />2 <br />. <br />2 <br />) <br />9 x 16 <br />(0,34 x 0,63) <br />73 <br />0 <br />(2 <br />8 <br />. <br />7 <br />4 <br />) <br />Figure 5 : Position of the anchoring points(Dimensions in mm (in)) <br />Recommended clearances: <br />To guarantee optimal operation and adequate heat dissipation for the inverter as well as a good <br />connection quality when using the SMA Cellular LTE Modem Kit, the following requirements for <br />clearances should be observed. This will prevent the inverter power output from being reduced due <br />to excessive temperatures. However, smaller clearances are permitted without causing any risk. <br />EN <br />G <br />L <br />I <br />S <br />H <br />534 S Sycamore St <br />- 10110979707/01/22