Laserfiche WebLink
a o <br />a <br />RECEiVED <br />uL 0 i; 884 <br />.r"e(qGlE\ <br />Planning & Deve lopment <br />20 Civic Center Plaza <br />P. O. Box 1988 <br />Santa Ana, ca. 927 02 <br />Services Dept. <br />Re: Earthquake compliance for 511-515 S. Main, Santa Ana, Ca. V <br />Dear Mr <br />Enclosed is a copy of a Ietter which we received from <br />our client zeb ziemer, owner of the above mentioned buildings <br />dated June 28, 1984 authorizing our firm to proceed with <br />engineering for fu11 compliance per the request of the Santa <br />Ana Building Dept. <br />we understand that they wanted us to have the engineering <br />drawings and calculations submitted for plan check by the <br />end of June in order that plan check and permit issuance <br />would be completed by the end of JuIy. <br />Please advise as to the latest date for submission for <br />plan check for the buildings mentioned above in order to <br />pull the permit in time. <br />BOB <br />hh <br />lL*" <br />olu <br />Richardson, President <br />RICHARDSON DESIGN & DEVELOPMENT <br />BR: sb <br />enc l, . <br />3I0TWILSHIREBOULEVARD o LOSANGELES,CA90010 o (2I3)480-1095 <br />DESIGN o PLANNING. ARCHITECTURE o ENGINEERING . ENERGY MANAGEMENT . ECONOMICS C DEVELOPMENT <br />cc/ zeb z iemer <br />Mazio <br />JuIy 3, 1984 <br />CITY O <br />DIV OF DE'- I ''-,lr P3.- cEs&r{o <br />\ <br />i <br />In the mean time we are proceeding with engineering on <br />same .