My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002 W Alton Ave - Soils Report
PBA
>
Building
>
Soils Reports
>
A
>
Alton Ave
>
2002 W Alton Ave
>
2002 W Alton Ave - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 8:57:47 AM
Creation date
6/28/2021 8:57:13 AM
Metadata
Fields
Template:
Soils Report
Full Address
2002 W Alton Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project No. D-38E5-06 <br />Christ Our Savior Catholic Parish <br />contents and indicate severely corrosive soil. Other soil characteristics that can influence <br />corrosivity toward metals are pH, chemical content, soil types and site drainage. <br />Based on test results, the soils are classified as severely corrosive to ferrous metals and <br />low to Portland cement concrete. Therefore, we recommend Type II cement and a <br />maximum water-cement ratio of 0.50 be used for all concrete Portland cement for all <br />concrete elements in contact with soil. All fenous metals and pipes should be properly <br />coated and wrapped. <br />Soluble sullate content in soil has a significant impact on concrete deterioration over <br />tirne. However, sulfate exposure is negligible for this site. <br />Sitc Dreinrgc: The site should be sloped to direct water from any source away from all <br />structures. Roof gutters and down spouts shall be provided for building and water shall <br />be diverted to storm drain system. <br />Grading Recommendations: <br />The site grading will be required at the project site for clearing and over excavations <br />Grading and excavations shall be accomplished as follows: <br />Prior to grading, existing structures, its foundation, existing asphalt and concrete <br />hardscape areas, free standing walls, trees, grass should be removed to full depth and <br />hauled off-site. Existing utilities should be rernoved and relocated as required. Any <br />construction debris or contaminated material shall be removed and hauled away from the <br />srte <br />Planters near the building should be avoided if possible and if used, they should be water <br />proofed. Inigation should be controlled and an area drain system should be provided to <br />avoid water intrusion beneath the structure. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />T <br />I <br />I <br />l <br />I <br />I <br />I <br />t <br />T <br />E <br />Jb
The URL can be used to link to this page
Your browser does not support the video tag.