My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002 W Alton Ave - Soils Report
PBA
>
Building
>
Soils Reports
>
A
>
Alton Ave
>
2002 W Alton Ave
>
2002 W Alton Ave - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 8:57:47 AM
Creation date
6/28/2021 8:57:13 AM
Metadata
Fields
Template:
Soils Report
Full Address
2002 W Alton Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project No. D-3885-06 <br />Christ Our Savior Catholic Parish <br />- During pile driving & Monitoring; <br />- Vibration Monitoring; <br />- Placement of all fill, backfill, and pavement structural sections; <br />- Final excavations for foundations, retaining walls, and slab-on-grade; and <br />- Final as graded report and certification. <br />Rema rks <br />The conclusions and recommendations contained herein are based on the findings and <br />observations made at the test hole locations. It is not unusual to find conditions between <br />and beyond such locations, which differ from the conditions encountered. If conditions <br />are encountered during construction, which appear to differ from those previously <br />disclosed, this office should be notified so as to consider the need for modifications. On- <br />site construction observations and wherever appropriate, tests should be performed during <br />the course of construction by a representative of this office to evaluate compliance with <br />the design concepts, specifications, and recommendations contained herein. <br />This report has been compiled for the exclusive use of the new Sanctuary Building, Parish <br />Center and Meeting Rooms buitding, the client, their agents, or representative. It shall not <br />be transferred to, or used by, other parties, or applied to any project on this site other than <br />described herein without consent and /or thorough review by this office. <br />Limitations <br />This report is issued with the understanding that it is the responsibility of the owner or his <br />representative to see that the information and recommendations contained herein are <br />called to the attention of the other members of the design team for the project and that the <br />applicable information is incorporated into the plans, and that the necessary steps are <br />40 <br />- Observations ofbearing materials for footings;
The URL can be used to link to this page
Your browser does not support the video tag.