Laserfiche WebLink
Report ol Soils Investigation <br />2215 South Standard Ave., Proposed Addition <br />Page 26 of 27 <br />Job No. 40-0613 <br />anta <br />10.8 Construction 0bsen,ation <br />The recommendations provided in this report are based on preliminary design <br />information for the proposed construction and the surface conditions lound in the <br />exploratory boring locations. The interpolated subsurface conditions should be checked <br />in the field during construction. Final project drawings should be reviewed by the <br />geotechnical consultant prior to beginning construction. <br />The recommendations provided in this report are based on the understanding and <br />assumption that Construction Testing & Engineering, Inc. (CTE) will provide the <br />observation and testing services for the project. <br />I1.O LIMITATIONS OF INVESTIGATION <br />The field evaluation, laboratory testing and geotechnical analysis presented in this report <br />have been conducted in accordance with current engineering practice and the standard <br />care exercised by reputable geotechnical consultants performing similar tasks in this area. <br />No other warranty, expressed or implied, is made regarding the conclusions, <br />recommendations and opinions expressed in this report. Variations may exist between <br />boring locations and surface exposures, and conditions not observed or described in this <br />repon may be encountered during construction. <br />9 <br />I <br />I <br />I <br />-1 <br />I