My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2215 S Standard Ave - Soils Report
PBA
>
Building
>
Soils Reports
>
S
>
Standard Ave
>
2215 S Standard Ave
>
2215 S Standard Ave - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 9:12:16 AM
Creation date
6/28/2021 9:12:10 AM
Metadata
Fields
Template:
Soils Report
Full Address
2215 S Standard Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Report of Soils Investigation <br />2215 South Standard Ave., Proposed Addition <br />Santa Ana. Califomia <br />Page27 of27 <br />Job No. 40-0613 <br />April 5. 1999 <br />Our conclusions and recommendations are based on analysis ofthe observed conditions. <br />If conditions other than those described in this repon are encountered, our ofiice should <br />be notified and additional recommendations, ifrequired, wilI be provided upon request. <br />We appreciate this opportunity to be of service on this project. If you have any questions <br />regarding this report, please do not hesitate to contact the undersigned. <br />Respectfu lly submitted, <br />CONSTRUCTION TESTING & ENGINEERING, INC_1 <br />I tLlWbtl <br />dn t)allard, GE #2173 <br />Geotechnical Engineering Manager <br />Vincent J. Patula, CEG #2057 <br />Senior Engineering Geologist <br />!/!,Mk^,, <br />Staff Geologist <br />l'0. 2.<73 <br />Ep.6/30ffi <br />7E <br />0 <br />s <br />(o <br />** <br />OF <br />I <br />I <br />ar <br />o
The URL can be used to link to this page
Your browser does not support the video tag.