My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
106 E 4th St - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Fourth St
>
106 E Fourth St
>
106 E 4th St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 11:53:51 AM
Creation date
6/1/2025 11:53:45 AM
Metadata
Fields
Template:
Plan
Permit Number
20180879
101116506
Full Address
106 E Fourth St
Document Relationships
101116506 - Permit
(Permit - Plan)
Path:
\Building\Permits\F\Fourth St\106 E Fourth St
20180879 - Permit
(Permit - Plan)
Path:
\Building\Permits\F\Fourth St\106 E Fourth St
Polygon
ID:
1
Creator:
Import Agent
Created:
6/1/2025 11:53 AM
Modified:
5/30/2025 11:39 AM
ID:
2
Creator:
Import Agent
Created:
6/1/2025 11:53 AM
Modified:
5/30/2025 11:39 AM
ID:
3
Creator:
Import Agent
Created:
6/1/2025 11:53 AM
Modified:
5/30/2025 11:39 AM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Name: <br />George Hansen <br />Property address: <br />106 E 4th St, <br />Santa Ana, CA 92701 <br />DATE: 08/18/2023 <br />ROOF PLAN1 <br />EMT Conduit <br />(E) Main Service Panel <br />Solar Module <br />INDEX <br />(N) Junction Box <br />Microinverters <br />Setback <br />MSP <br />JB <br />Total Roof Area: 2563 <br />Total Module Area: 682 <br />26.60% of Coverage <br />AC(N) AC Disconnect <br />ECB(N) Enphase Combiner Box <br />SSP(E) 0A Sub Panel <br />AC <br />ECB <br />E 4th St <br />Solar PV Array <br />31- Silfab 490Watt Modules <br />31- Enphase IQ8A MicroInverters <br />Tilt: 10 Deg <br />Orientation: 180 Deg <br />36'' fire setback <br />48 <br />' <br />' <br /> <br />f <br />i <br />r <br />e <br /> <br />s <br />e <br />t <br />b <br />a <br />c <br />k <br />36 <br />' <br />' <br /> <br />f <br />i <br />r <br />e <br /> <br />s <br />e <br />t <br />b <br />a <br />c <br />k <br />48'' fire setback <br />c c <br />c c <br />c c <br />c c <br />c c <br />b c <br />b b <br />b b <br />b <br />b <br />b b <br />a b <br />a a <br />a a <br />a a <br />a <br />a <br />a <br />48'' Pathway <br />48'' Pathway <br />6'-6"3'-4" <br />SCALE: 3/32" = 1'-0" <br />S <br /> 180 ° <br />E <br /> 90 ° <br />W <br /> 270 ° <br />N <br />0° <br />PEAK POWER SOLUTIONS <br />360 E 1ST STREET #947, <br />TUSTIN, CA 92780 <br />Phone: 714-258-3900 <br />License # 973253 C10 <br />(3DUDSHW6XSSRUW <br />(6WHSRYHU <br />INSIDE THE BUILDING <br />All of the equipment is minimum 48" off the ground <br />and has a maximum height of 78" <br />ROOF ACCESS HATCH <br />www. Loyd W Martin .com <br />Solar Structures Engineering <br />#2023-4620 Structural Only <br />August 24, 2023 <br />NOTE: <br />Engineer of Record assumes that all structural components of <br />the existing building were permitted and met the requirements <br />of the Building Code at the time of construction. Solar <br />Contractor shall field verify that the roof framing is in its <br />existing permitted condition and capable of supporting <br />required live loads. Framing specified on solar plans shall be <br />assumed to be minimum size and spacing, actual framing may <br />be different. <br />Ma <br />i <br />n <br /> S <br />t <br />The height of the parapet wall on the Main Street side and the <br />parapet for the rear of the building are both about 3'. <br />48 <br />'' <br /> <br />Pa <br />t <br />h <br />w <br />a <br />y <br />48 <br />' <br />' <br /> <br />P <br />a <br />t <br />h <br />w <br />a <br />y <br />106 E 4th St - 101116506 <br />& 2018087910/10/2023
The URL can be used to link to this page
Your browser does not support the video tag.