THE CONTRACTOR SHALL PROVIDE, WITH THE ASSISTANCE OF THE SWITCHGEAR MANUFACTURER, POWER SYSTEMS STUDIES CONSISTING OF A <br />SHORT CIRCUIT STUDY, A COORDINATION STUDY, AND AN ARC FLASH STUDY - ALL PER LATEST PUBLISHED EDITIONS OF THE FOLLOWING <br />STANDARDS: ANSI C37, IEEE 141, IEEE 242, IEEE 399 - BROWN BOOK, NFPA 70E AND IEEE STD 1584/1584a. ADDITIONALLY: <br />DURING THE CONSTRUCTION PHASE OF THE PROJECT, ALL GROUND FAULT RELAYS SHALL BE SET AT THE LOWEST AVAILABLE TIME DELAY <br />AND PICK-UP SETTINGS. <br />h. <br />g. <br />e. <br />THE STUDY SHALL INCLUDE ALL PORTIONS OF ELECTRICAL SINGLE LINE DIAGRAM TO INCLUDE UPSTREAM OR DOWNSTREAM ELEMENTS THAT <br />MAY NOT BE SHOWN INCLUDING, BUT NOT LIMITED TO, UTILITY SOURCE CONTRIBUTION, RELEVANT PORTIONS OF THE EXISTING ELECTRICAL <br />DISTRIBUTION SYSTEM WITHIN A BUILDING AND/OR CAMPUS ELECTRICAL DISTRIBUTION SYSTEMS AS DESCRIBED ABOVE. <br />CONTRACTOR SHALL PERFORM STUDY USING SKM "SYSTEMS ANALYSIS POWER TOOLS FOR WINDOWS" COMPUTER SOFTWARE PROGRAM - <br />LATEST AVAILABLE VERSION OR EQUAL BY ETAP. <br />a. <br />THE SHORT CIRCUIT STUDY SHALL INCLUDE CALCULATED SHORT-CIRCUIT MOMENTARY AND INTERRUPTING DUTIES FOR 3-PHASE BOLTED <br />FAULTS AND LINE-TO-GROUND FAULTS THROUGHOUT THE SINGLE LINE TO INCLUDE UTILITY SERVICE SUPPLY, GENERATORS AND TRANSFER <br />SWITCHES, SUBSTATIONS, SWITCHGEAR, PANEL BOARDS ETC. STUDY SHALL EVALUATE ALL ELECTRICAL DISTRIBUTION EQUIPMENT AND <br />PROTECTIVE DEVICES AGAINST SHORT CIRCUIT CURRENT RATINGS. THIS STUDY EFFORT SHALL EXTEND TO SCCR RATINGS OF EQUIPMENT, <br />EQUIPMENT CONTROL PANELS, VARIABLE FREQUENCY DRIVES ETC PROVIDED BY OTHER TRADES THAT ARE CONNECTED TO THE ELECTRICAL <br />SYSTEM. NOTE ANY EXISTING CIRCUIT PROTECTIVE DEVICE(S)/ELECTRICAL DISTRIBUTION THAT IS INADEQUATELY RATED TO WITHSTAND <br />CALCULATED FAULT VALUES OR WHERE EQUIPMENT SCCR IS EXCEEDED. WHERE THE UTILITY COMPANY PROVIDES MULTIPLE FAULT CURRENT <br />VALUES REFLECTING INITIAL TRANSFORMER CAPACITY AND WORST CASE TRANSFORMER CAPACITY, THE CONTRACTOR SHALL PROVIDE <br />SHORT CIRCUIT ANALYSIS PRIMARILY BASED ON WORST CASE TRANSFORMER CAPACITY. ALL SERVICE EQUIPMENT SHALL BE LABELED WITH <br />THE MAXIMUM AVAILABLE FAULT CURRENT AND FAULT CURRENT CALCULATION DATE PER NEC (OR CEC WHERE ADOPTED) 110.24. SEE <br />LABELING SPECIFICATION FOR ADDITIONAL REQUIREMENTS. <br />CONTRACTOR SHALL FURNISH/OBTAIN ALL DATA REQUIRED FOR POWER SYSTEMS STUDIES. DATA COLLECTION EFFORT SHALL BE <br />PERFORMED IN AN EXPEDITIOUS MANNER AND AS SOON AS POSSIBLE AFTER CONTRACT AWARD TO ENSURE STUDY COMPLETION FOR <br />SUBMISSION AS PART OF THE ELECTRICAL DISTRIBUTION EQUIPMENT SHOP DRAWINGS AND SUBMITTALS. DATA COLLECTION EFFORTS MAY <br />INCLUDE, BUT ARE NOT LIMITED TO, CALCULATED UTILITY COMPANY FAULT VALUES, SERVICE TRANSFORMER PRIMARY PROTECTIVE DEVICE <br />AND APPLIED VOLTAGE, ELECTRICAL CHARACTERISTICS AND FAULT CONTRIBUTION FROM EXISTING MOTORS/GENERATORS, EXISTING <br />CONDUCTOR QUANTITIES, SIZE AND LENGTHS, EXISTING/ NEW OVERCURRENT PROTECTIVE DEVICE SPECIFICATIONS AND PART NUMBERS, <br />TRANSFER SWITCH CHARACTERISTICS AND SHORT CIRCUIT CURRENT RATINGS IN ADDITION TO ANY OTHER DATA REQUIRED TO PERFORM <br />COMPREHENSIVE POWER SYSTEM STUDIES. RANGES OF FAULT CURRENT VALUES OR GENERIC FAULT CURRENT VALUES PROVIDED BY THE <br />UTILITY COMPANY ARE UNACCEPTABLE AS ARE ANY FAULT CURRENT VALUES SHOWN ON THE SINGLE LINE DIAGRAM OR FEEDER SCHEDULE. <br />b. <br />c. <br />THE COORDINATION STUDY SHALL INCLUDE TIME-CURRENT CURVES (TCC) FOR OVER CURRENT PROTECTIVE DEVICES (OCPDs) ALONG WITH <br />TRANSFORMER FULL-LOAD CURRENT, INRUSH CURRENT, AND THROUGH-FAULT PROTECTION CURVES, CONDUCTOR DAMAGE CURVES, <br />GROUND FAULT PROTECTIVE DEVICE CURVES, MOTOR STARTING CURVE(S)/DAMAGE POINT(S), GENERATOR SHORT-CIRCUIT CURVE(S) <br />/DAMAGE POINT(S) ETC. - CLEARLY IDENTIFIED AND PLOTTED ON LOG-LOG SCALE GRAPH(S). TCC GRAPH(S) SHALL INCLUDE A ONE-LINE <br />DIAGRAM IDENTIFYING THE SPECIFIC PORTION COVERED BY THE GRAPH. DEMONSTRATE THAT ADEQUATE CLEARING TIME/SELECTIVE <br />OPERATION EXISTS BETWEEN PROTECTIVE DEVICES WHILE PROVIDING PROPER SYSTEM PROTECTION & COORDINATION. STUDY SHALL <br />INCLUDE ALL MAIN AND FEEDER OCPDs INCLUDING SECONDARY SIDE OF EACH TRANSFORMER DOWN TO BREAKERS IN PANEL BOARDS AND <br />INDIVIDUAL BREAKERS IN DISTRIBUTION BOARDS. IN ALL CASES, SOLID STATE AND/OR ADJUSTABLE OCPDs SHALL BE ANALYZED WITH <br />UPSTREAM AND DOWNSTREAM OCPDs AS REQUIRED TO ESTABLISH PROPER COORDINATION SETTINGS. SPECIAL EMPHASIS SHALL BE PLACED <br />ON ANALYZING PORTIONS OF THE ELECTRICAL SYSTEM REQUIRING SELECTIVE COORDINATION WHICH INCLUDE, BUT ARE NOT LIMITED TO, NEC <br />(OR CEC WHERE ADOPTED) ARTICLES 517, 620, 700, 701 & 708; ALONG WITH ANY ARTICLE 702 OPTIONAL STANDBY SYSTEMS SERVING SERVER <br />ROOMS/DATA CENTERS OR OTHER AREAS REQUIRING HIGH AVAILABILITY/PROPER COORDINATION SUCH AS MANUFACTURING, CLEAN ROOM <br />OR LAB FACILITIES. CONTRACTOR SHALL BE RESPONSIBLE TO RECOMMEND SETTINGS OF ALL DEVICES, TO INCLUDE GROUND FAULT <br />SETTINGS, TO ACHIEVE SYSTEM COORDINATION. THE CONTRACTOR SHALL FIELD ADJUST NEW AND EXISTING DEVICES ACCORDINGLY <br />UTILIZING A QUALIFIED MANUFACTURER'S REPRESENTATIVE OR A THIRD-PARTY ELECTRICAL TESTING AGENCY. <br />d. <br />j. <br />CONTRACTOR IS SOLELY RESPONSIBLE FOR OBTAINING UTILITY DATA FROM THE UTILITY COMPANY - INCLUDE ALL COSTS IN BASE BID FOR <br />ANY UTILITY COMPANY FEES FOR PROVIDING NECESSARY DATA. WHERE THE PROJECT IS LOCATED ON A CAMPUS WITH AN <br />OWNER-FURNISHED ELECTRICAL DISTRIBUTION SYSTEM, CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN SUFFICIENT ELECTRICAL SYSTEM <br />DATA TO DEMONSTRATE COORDINATION OF THE PROJECT'S ELECTRICAL SYSTEM WITH CAMPUS DISTRIBUTION SYSTEM. THIS DATA MAY BE <br />AVAILABLE IN THE FORM OF AN OWNER-PROVIDED CAMPUS POWER SYSTEM STUDY. WHERE SUCH STUDIES ARE NOT AVAILABLE, THE <br />CONTRACTOR SHALL INCLUDE ALL COSTS IN BASE BID TO PERFORM NECESSARY FIELD INVESTIGATION OF CAMPUS DISTRIBUTION SYSTEM <br />INCLUDING CAMPUS SERVICE ENTRANCE AND SERVING UTILITY DATA AS REQUIRED TO DEMONSTRATE COORDINATION OF THE PROJECT'S <br />ELECTRICAL SYSTEM WITH CAMPUS DISTRIBUTION SYSTEM. INCLUDE ALL COSTS FOR RECOMMENDING ADJUSTMENTS TO EXISTING CAMPUS <br />DISTRIBUTION SYSTEM SETTINGS DISCOVERED TO BE INCORRECT. OWNER SHALL BE RESPONSIBLE TO UNDERTAKE ANY PHYSICAL <br />ADJUSTMENTS TO EXISTING MEDIUM OR HIGH VOLTAGE DISTRIBUTION EQUIPMENT WITH THE EXCEPTION OF FUSES, RELAYS OR OTHER <br />CIRCUIT PROTECTIVE DEVICES LOCATED IN EXISTING DISTRIBUTION EQUIPMENT THAT ARE DEDICATED TO SERVE ONLY THIS PROJECT'S <br />ELECTRICAL SYSTEM. <br />THE ARC FLASH ANALYSIS SHALL BE BASED ON THE INCIDENT ENERGY ANALYSIS METHOD (NFPA 70E 130.5). THE ARC FLASH ANALYSIS SHALL <br />DETERMINE THE FLASH BOUNDARY, THE WORKING DISTANCE, THE INCIDENT ENERGY AND MINIMUM ARC RATING OF CLOTHING(CAL/CM²) AT <br />LOCATIONS IN THE ELECTRICAL SYSTEM WHERE WORK CAN OR MIGHT BE PERFORMED ON ENERGIZED COMPONENTS WHERE MULTIPLE <br />SYSTEM CONFIGURATION SCENARIOS ARE POSSIBLE, THE CONFIGURATION WITH GREATEST INCIDENT ENERGY MUST BE SHOWN. <br />DECREMENT FAULT CONTRIBUTIONS FROM MOTOR(S) AND GENERATOR(S) BASED ON INDUSTRY STANDARDS. THE CONTRACTOR SHALL MAKE <br />RECOMMENDATIONS WITH REGARD TO SYSTEM ADJUSTMENTS OR OTHER MITIGATION MEASURES TO OPTIMIZE THE RESULTS OF THE STUDY <br />AS IT RELATES TO SAFE AND RELIABLE ELECTRICAL SYSTEM OPERATION (E.G. OVERCURRENT DEVICE SETTINGS, WORKING DISTANCES, <br />CURRENT LIMITING DEVICES). THIS INCLUDES MITIGATION, WHERE POSSIBLE, OF INCIDENT ENERGY LEVELS THAT EXCEED 40 CAL/CM². <br />PERFORM ITERATIVE CALCULATIONS TO DEMONSTRATE EFFECTS OF OPENING PROTECTIVE DEVICES UTILIZING A VARIETY OF DIFFERENT <br />SETTINGS TO BEST MITIGATE ARC FLASH ENERGY WHILE MAINTAINING AN ACCEPTABLE LEVEL OF SYSTEM COORDINATION. WHERE SUCH <br />RECOMMENDATIONS COMPROMISE SELECTIVE COORDINATION SETTINGS, SO STATE IN THE ANALYSIS. <br />POWER SYSTEMS STUDIES SHALL BE SUBMITTED AS PART OF THE OVERALL SWITCHGEAR SUBMITTAL. THE RESULTS OF THE POWER SYSTEMS <br />STUDY SHALL BE PRESENTED IN A COMPREHENSIVE REPORT THAT INCLUDES: <br />-REPORT SUMMARY WITH ANALYSIS METHODOLOGY, FINDINGS AND RECOMMENDATIONS <br />SUMMARY OF INPUT DATA FOR UTILITY SOURCE, EQUIPMENT AND CABLES <br />AVAILABLE FAULT CURRENT AT EACH EQUIPMENT LOCATION WITH COMPARISON TO EQUIPMENT RATING <br />OVERCURRENT DEVICE SETTINGS (E.G. PICK-UP, TIME DELAY, CURVE), “AS FOUND” AND “AS RECOMMENDED” <br />INCIDENT ENERGY LEVEL (CAL/CM²) FOR EACH EQUIPMENT LOCATION, RECOMMENDED PPE AND SAMPLE ARC FLASH WARNING LABELS <br />OVERCURRENT DEVICE COORDINATION CURVES INCLUDING RELATED SECTION OF THE SINGLE-LINE DIAGRAM <br />COMPLETE SYSTEM SINGLE-LINE DIAGRAM FOR THE SYSTEM ANALYZED <br />A DVD OR CD CONTAINING ELECTRONIC PROJECT FILES USED TO DEVELOP THE STUDY TO INCLUDE SKM OR ETAP PROJECT AND <br />REFERENCE LIBRARY FILES. ALL FILES SHALL BE AVAILABLE FOR REVIEW AND/OR FUTURE MODIFICATION WITHOUT LIMITATION. LOCKING <br />OR SECURING FILES BY OTHER MEANS IS NOT ACCEPTABLE. FAILURE TO SUBMIT COMPLETE STUDIES AND FULLY ACCESSIBLE FILES <br />SHALL RESULT IN THE REJECTION OF THE ENTIRE SWITCHGEAR SUBMITTAL. <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />BASED ON THE RESULTS OF THE ARC FLASH ANALYSIS, THE CONTRACTOR SHALL PRODUCE AND INSTALL A WARNING LABEL (ORANGE <40 <br />CAL/CM2) OR DANGER LABEL (RED > 40 CAL/CM2) FOR EACH PIECE OF EQUIPMENT PER NEC (OR CEC WHERE ADOPTED) 110.16 AND IN <br />ACCORDANCE WITH ANSI Z535.4-2007 OR LATEST PUBLISHED EDITION. THE LABEL MUST BE READABLE IN BOTH INDOOR AND OUTDOOR <br />ENVIRONMENTS FOR AT LEAST 3 YEARS AND CONTAIN THE FOLLOWING INFORMATION: NOMINAL SYSTEM VOLTAGE, ARC HAZARD BOUNDARY <br />(INCHES), WORKING DISTANCE (INCHES), AVAILABLE ARC FLASH INCIDENT ENERGY AT THE WORKING DISTANCE (CAL/CM²), MINIMUM ARC <br />RATING OF CLOTHING, EQUIPMENT/BUS NAME, DATE PREPARED, SUPPLIER'S NAME AND ADDRESS. PROVIDE LABEL AS MANUFACTURED BY <br />BRADY OR EQUAL. PRIOR TO PLACING ARC FLASH LABELS, CONTRACTOR SHALL SET ALL PROTECTIVE DEVICE SETTINGS PER THE APPROVED <br />COORDINATION STUDY. <br />f. <br />TRANSFORMER SCHEDULE <br />TRANSFORMER INSTALLATION REQUIREMENTS: <br />TRANSFORMERS SHALL BE EQUIPPED WITH TWO (2) 2 1/2% FCAN AND TWO (2) 2 1/2% FCBN TAPS. TAP <br />LEADS SHALL BE TERMINATED ON AN INTERNAL BLOCK WITH LUGS FOR CONNECTION OF INCOMING <br />CONDUCTORS. THE TERMINAL COMPARTMENT SHALL BE LOCATED BELOW THE LEVEL OF THE <br />TRANSFORMER WINDINGS. PROVIDE ACCESS TO TERMINALS FROM THE FRONT FOR WALL AND FLOOR <br />MOUNTED TRANSFORMERS, AND FROM THE FRONT AND BOTTOM FOR SUSPENDED TRANSFORMERS. <br />TRANSFORMERS SHALL BE DRY TYPE, INTEGRAL, SELF-COOLED, ENCLOSED DISTRIBUTION, <br />TWO-WINDING TYPE PER UL 506. TRANSFORMERS SHALL BE PROVIDED WITH WINDINGS AS SPECIFIED <br />IN THE TRANSFORMER SCHEDULE. EACH TRANSFORMER MUST UNDERGO RESISTANCE, IMPEDANCE <br />AND RATIO TESTING, THE RESULTS OF WHICH SHALL BE PROVIDED AS PART OF THE TRANSFORMER <br />SUBMITTAL PACKAGE. <br />TRANSFORMER SYSTEM SPECIFICATIONS: <br />2. <br />1. <br />THE "GEC/BJ SIZE" COLUMN INDICATES THE MINIMUM CONDUIT AND COPPER GROUNDING ELECTRODE <br />CONDUCTOR AND BONDING JUMPER SIZES. THE G.E.C. AND CONDUIT SIZE SHALL BE INCREASED PER <br />NEC OR CEC WHERE ADOPTED, TABLE 250.66 BY THE CONTRACTOR BASED ON EQUIVALENT SIZE OF <br />THE TRANSFORMER SECONDARY CONDUCTORS. <br />- 50 DECIBELS. <br />- 45 DECIBELS. <br />- 55 DECIBELS. <br />- 60 DECIBELS. <br />WHEN THE TRANSFORMER SCHEDULE INDICATES A "REDUCED SOUND LEVEL" TRANSFORMER, <br />PROVIDE A TRANSFORMER THAT PRODUCES 3 DECIBELS LESS SOUND AS COMPARED TO NEMA <br />STANDARD SOUND LEVELS. WHEN REDUCED SOUND LEVEL TRANSFORMER IS NOT INDICATED, <br />PROVIDE A TRANSFORMER THAT MEETS NEMA STANDARD SOUND LEVELS, WHICH ARE: <br />TRANSFORMERS SHALL BE GROUNDED TO A CODE APPROVED GROUND SOURCE PER NEC, OR CEC <br />WHERE ADOPTED, ARTICLE 250.30. <br />THE "DIMENSIONS" COLUMN INDICATES "H" HEIGHT, "W" WIDTH, AND "D" DEPTH. ALL DIMENSIONS AND <br />WEIGHTS ARE BASED UPON SQUARE D PRODUCTS. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL <br />COST IMPACTS OF LARGER DIMENSIONS FROM AN ALTERNATE MANUFACTURER. <br />SHOP DRAWINGS SHALL BE SUBMITTED PER THE ELECTRICAL SUBMITTAL REQUIREMENTS SHOWING <br />CONFORMANCE TO THESE SPECIFICATIONS. <br />IF THE SINGLE LINE DIAGRAM INDICATES TWO (2) SECONDARY FEEDERS THE TRANSFORMER SHALL BE <br />PROVIDED WITH A DOUBLE LUG KIT. <br />THE "NEMA/MNTG" COLUMN INDICATES THE NEMA RATED ENCLOSURE TYPE AS WELL AS THE <br />MOUNTING METHOD: <br />16. <br />17. <br />18. <br />15. <br />51-150 KVA <br />10-50 KVA <br />151-300 KVA <br />301-500 KVA <br />14. <br />13. <br />VENTILATION OPENINGS SHALL BE LOCATED TO PERMIT PLACING THE TRANSFORMER IN A CORNER <br />WITHIN 6" OF THE TWO ADJACENT WALLS. ENCLOSURE SHALL BE CONSTRUCTED OF HEAVY GAUGE <br />STEEL, COATED INSIDE AND OUT WITH ZINC CHROMATE OR IRON OXIDE RUST INHIBITING PRIMER. <br />ENCLOSURE SHALL THEN BE FINISHED IN GRAY ENAMEL. EACH TRANSFORMER SHALL BE FURNISHED <br />WITH A MANUFACTURER'S NAMEPLATE LOCATED ON THE FRONT OF THE UNIT. THE NAMEPLATE SHALL <br />BE ANODIZED ALUMINUM STENCILED WITH VOLTAGE, KVA RATING, K-RATING, PHASE, TAP <br />ADJUSTMENTS AND WIRING DIAGRAMS. <br />THE "A.I.C. VALUE" COLUMN INDICATES THE INTERRUPTING CURRENT AT THE SECONDARY TERMINALS <br />BASED UPON AN INTERRUPTING CURRENT OF INFINITY AT THE PRIMARY TERMINALS. <br />THE "MIN. %Z" COLUMN INDICATES THE MINIMUM ALLOWED TRANSFORMER IMPEDANCE. <br />TRANSFORMERS SHALL BE MANUFACTURED BY GE, CUTLER-HAMMER, SIEMENS, SQUARE D, MGM, <br />HAMMOND POWER SOLUTIONS, OR OLSEN. <br />USE FLEXIBLE CONDUIT FOR PRIMARY AND SECONDARY CONNECTIONS WITH A SEPARATE EQUIPMENT <br />GROUND CONDUCTOR. <br />STANDARD TRANSFORMERS SHALL HAVE CLASS 220 INSULATION, HAVING A 150 DEGREE CELSIUS <br />TEMPERATURE RISE ABOVE 30 DEGREE CELSIUS AVERAGE AND 40 DEGREE CELSIUS MAXIMUM, WHEN <br />OPERATING AT FULL LOAD - WITHOUT A LOSS OF LIFE. STANDARD TRANSFORMERS SHALL COMPLY <br />WITH NEMA ENERGY EFFICIENCY STANDARD "TP-1". WHERE TRANSFORMER STOCKS BECOME <br />DEPELETED, INCLUDE ALL COSTS IN BASE BID TO PROVIDE 2016 DEPARTMENT OF ENERGY (DOE) <br />TRANSFORMER EFFICIENCY STANDARD-COMPLIANT TRANSFORMERS. <br />K RATED TRANSFORMERS SHALL HAVE CLASS 220 INSULATION, HAVING A 115 DEGREE CELSIUS <br />TEMPERATURE RISE ABOVE 30 DEGREE CELSIUS AVERAGE AND 40 DEGREE CELSIUS MAXIMUM, WHEN <br />OPERATING AT FULL LOAD - WITHOUT A LOSS OF LIFE. K RATED TRANSFORMERS SHALL COMPLY WITH <br />NEMA ENERGY EFFICIENCY STANDARD "TP-1". WHERE TRANSFORMER STOCKS BECOME DEPLETED, <br />INCLUDE ALL COSTS IN BASE BID TO PROVIDE 2016 DEPARTMENT OF ENERGY (DOE) TRANSFORMER <br />EFFICIENCY STANDARD-COMPLIANT TRANSFORMERS. <br />THE "K VALUE" COLUMN INDICATES THE MINIMUM UL APPROVED K RATING. K RATED TRANSFORMERS <br />SHALL BE PROVIDED WITH DOUBLE SIZE NEUTRAL TERMINALS, ADDITIONAL COIL CAPACITY, AN <br />ELECTROSTATIC SHIELD, AND SHALL BE U.L. LISTED FOR NON-LINEAR LOADS. <br />11. <br />12. <br />9. <br />10. <br />6. <br />8. <br />7. <br />5. <br />4. <br />3. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FURNISHING OF ALL MATERIAL, LABOR, EQUIPMENT, AND SERVICES, <br />IN CONNECTION WITH THE INSTALLATION OF A COMPLETE AND FULLY FUNCTIONING AND CODE COMPLIANT <br />INSTALLATION. <br />2. <br />3. <br />1. <br />4. <br />IT IS THE INTENT OF THE CONTRACT DOCUMENTS, WHICH ARE PRESENTED IN A DIAGRAMMATIC FORMAT, TO PROVIDE <br />CONTRACTOR INFORMATION THAT SUPPLEMENTS AND ENHANCES THE GENERALLY ACCEPTED CONSTRUCTION MEANS, <br />METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES EMPLOYED IN CONNECTION WITH INSTALLATION OF THIS TYPE <br />OF PRODUCT / SYSTEM. <br />THE CONTRACTOR SHALL ALSO INCORPORATE THE REQUIREMENTS OF THE MANUFACTURER'S INSTALLATION <br />INSTRUCTIONS / WARRANTY REQUIREMENTS AS PART OF THE REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS. IN <br />THE EVENT OF A CONFLICT BETWEEN THE CONTRACT DOCUMENT REQUIREMENTS AND THE MANUFACTURERS <br />INSTALLATION REQUIREMENTS, THE MORE STRINGENT REQUIREMENTS SHALL APPLY - UNLESS THE MORE STRINGENT <br />REQUIREMENT VOIDS APPLICABLE WARRANTIES OR VIOLATES THE REQUIREMENTS OF THE LOCAL AUTHORITY HAVING <br />JURISDICTION. ANY SUCH CONFLICT SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ENGINEER IN WRITING <br />THROUGH THE FORMAL RFI PROCESS. <br />REFER TO THE ASSOCIATED SCHEDULES, SCHEMATICS, DRAWINGS, AND SPECIFICATIONS FOR DETAILED INFORMATION / <br />REQUIREMENTS ON THIS PRODUCT / SYSTEM. <br />INDICATES AN INDOOR TYPE. <br />INDICATES AN NEMA 3R, OUTDOOR TYPE WITH VENTILATED OPENINGS AND RODENT/TAMPER <br />SCREENS. <br />INDICATES RAISED FLOOR MOUNTING WHICH REQUIRES A CUSTOM MOUNTING FRAME <br />SUCH THAT THE RAISED FLOOR DOES NOT SUPPORT THE TRANSFORMER(S). <br />SUGGESTED SOURCE: MASON WEST INC. (www.masonwest.com) <br />INDICATES FLOOR MOUNTED. <br />INDICATES WALL MOUNTED. <br />"RF" - <br />"W" - <br />"F" - <br />"3" - <br />"1" - <br />SIZE <br />GEC/BJ <br />W <br />NAME KVA <br />V P <br />INPUT <br />%Z <br />MINOUTPUT <br />V WP VAL. <br />A.I.C. <br />VALUE <br />K DIMENSIONSNEMA/REDUCED <br />LEVEL HMNTG.DW <br />REMARKSWGT.SOUNDWINDING <br />MATERIAL <br />SEISMICALLY-RATED VIBRATION ISOLATORS (KORFUND COMPANY, MASON INDUSTRIES, CALDYN OR <br />EQUAL) SHALL BE LOCATED AT EACH CORNER OF THE TRANSFORMER. ELASTOMER PADS MAY BE <br />USED FOR ISOLATION OF TRANSFORMERS 1) WEIGHTING LESS THAN 1000 LBS AND 2) THAT ARE NOT <br />SPECIFIED WITH REDUCED SOUND LEVELS PER THE TRANSFORMER SCHEDULE. ELASTOMER PADS <br />SHALL BE EQUIPPED WITH SHOULDERED BUSHINGS PREVENTING METAL-TO-METAL CONTACT <br />BETWEEN ANCHOR BOLT AND THE TRANSFORMER. NEOPRENE ISOLATORS SHALL BE USED FOR <br />TRANSFORMERS WEIGHING 1000 LBS OR MORE OR ANY TRANSFORMER SPECIFIED WITH REDUCED <br />SOUND LEVEL OUTPUT PER THE TRANSFORMER SCHEDULE. NEOPRENE ISOLATORS SHALL HAVE <br />CAPTIVE STEEL OR DUCTILE IRON HOUSINGS AS REQUIRED BY SEISMIC CONDITIONS AND WEIGHT OF <br />THE TRANSFORMER. NEOPRENE ELEMENTS SHALL BE ARRANGED IN OPPOSITION TO PROVIDE <br />POSITIVE MECHANICAL RESTRAINT IN ALL DIRECTIONS. NEOPRENE ISOLATORS SHALL BE SELECTED <br />TO PROVIDE NOMINAL 0.2" OF NOMINAL STATIC DEFLECTION IN COMPRESSION (0.15" MINIMUM <br />DEFLECTION) AND LESS THAN 70 DUROMETER (BASED ON SHORE SCALE A AND IN COMPLIANCE WITH <br />ASTM D2240 TYPE A) TO LIMIT SOUND/VIBRATION TRANSMISSION TO THE STRUCTURE - SUBMIT <br />ISOLATOR DEFLECTION CALCULATIONS FOR SELECTED ISOLATORS WITH TRANSFORMER SUBMITTAL. <br />TRANSFORMER SHALL BE BOLTED, VIA VIBRATION ISOLATORS, TO THE FLOOR, HOUSEKEEPING PAD, <br />CEILING OR WALL MOUNTING BRACKETS AT ALL FOUR CORNERS. WHEN SHOWN AS WALL-MOUNTED, <br />PROVIDE EITHER MANUFACTURER'S STANDARD TRANSFORMER WALL MOUNTING BRACKETS OR <br />FIELD-FABRICATED MOUNTING SYSTEMS. TRANSFORMER INSTALLATIONS SHALL, AT MINIMUM, MEET <br />THE SEISMIC BRACING AND ANCHORAGE REQUIREMENTS MANDATED BY GOVERNING BUILDING <br />CODES. SEE GENERAL ELECTRICAL SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. <br />POWER SYSTEMS STUDY SPECIFICATIONS: <br />DATA GATHERING SHALL BE CONDUCTED IN A SAFE MANNER WITH 1) EQUIPMENT COMPLETELY DE-ENGERIZED IN COORDINATION WITH THE <br />OWNER DURING A SCHEDULED POWER SHUTDOWN OR 2) UTILIZING A LICENSED ELECTRICIAN WEARING APPROPRIATE PERSONNEL <br />PROTECTIVE EQUIPMENT PER NFPA 70E STANDARDS. <br />INCLUDE INCIDENT ENERGY/FLASH PROTECTION BOUNDARY CALCULATIONS FOR BOTH LINE/LOAD SIDE OF ALL SEPARATELY ENCLOSED MAIN <br />CIRCUIT BREAKERS. ALL CALCULATIONS SHALL BE BASED ON ACTUAL OVERCURRENT DEVICE CLEARING TIMES. <br />GROUNDING ELECTRODE & CONDUCTOR - ALTERNATE: <br />WHERE GROUNDED STRUCTURAL MEMBER OR EFFECTIVELY <br />GROUNDED WATER PIPE IS UNAVAILABLE ON THE PREMISES, <br />PROVIDE 1 # CU. IN CONDUIT TO A CONCRETE-ENCASED <br />ELECTRODE WITH MIN OF 20 FT IN LENGTH OF MIN. #4 BARE <br />ENCASED IN MIN. 2" OF CONCRETE ALL AROUND, OR A GROUND <br />RING IN DIRECT CONTACT WITH EARTH AT A DEPTH NOT LESS <br />THAN 2-1/2 FT. WITH 20 FT. LENGTH MIN. OF #2 BARE COPPER, <br />WHICHEVER IS AVAILABLE, PER ART. 250.52(A) (3) & (4). <br />10' COPPER GROUND ELECTRODE(S) WITH <br />EXOTHERMIC CONNECTION(S) TO GROUND <br />CONDUCTOR. PROVIDE FIBER GLASS INSPECTION <br />WELL(S). QUANTITY AS REQUIRED TO ACHIEVE <br />CODE-REQUIRED RESISTANCE VALUES. <br />NEUTRAL BUS WITHIN EQUIPMENT. <br />WHEN SEPARATELY DERIVED SYSTEM IS A UPS, <br />CPC, PDU OR TRANSFORMER LOCATED IN <br />INFORMATION TECHNOLOGY ROOM, AS DEFINED <br />BY NEC (OR CEC WHERE ADOPTED) ART. 645, <br />SERVER ROOM, DATA CENTER, OR COMPUTER <br />ROOM, PROVIDE 1#2 INSULATED GREEN <br />CONDUCTOR, 3/4"C. AND MECHANICALLY <br />CONNECT TO MAIN TELECOMMUNICATIONS <br />GROUNDING BUS AND, WHEN LOCATED ON A TILE <br />ACCESS FLOOR, TO UNDER FLOOR SIGNAL <br />REFERENCE OR GROUNDING GRID AS REQUIRED. <br />PROVIDE CONNECTION OF GROUNDING <br />CONDUCTORS/BONDING JUMPERS PER ART.250.8. <br />GROUNDING ELECTRODE & CONDUCTOR: <br />IF AVAILABLE ON THE PREMISES AT EACH BUILDING AND/OR <br />STRUCTURE SERVED, PROVIDE 1 # CU. IN CONDUIT TO AN <br />EFFECTIVELY GROUNDED STRUCTURAL STEEL OR EFFECTIVELY <br />GROUNDED UNDERGROUND METAL WATER PIPE (MIN.10FT <br />LONG) WITHIN 5 FT. FROM POINT OF ENTRANCE TO THE <br />BUILDING AND/OR STRUCTURE TO THE SEPARATELY DERIVED <br />SYSTEM PER ART. 250.30(A)(4). <br />BONDING JUMPER(S): <br />PROVIDE BONDING WITH 1 # CU. IN CONDUIT TO NEAREST METAL <br />WATER PIPE (HOT, COLD, SPRINKLER, SEWER, BUILDING MOUNTED - <br />INTERIOR OR EXTERIOR, ETC), UNINTENTIONALLY UNGROUNDED <br />BUILDING STEEL, GAS PIPE, HVAC DUCTS IN THE BUILDING PER ART. <br />250.104 (A), (B), & (C) <br />GROUNDING ELECTRODE CONDUCTOR/BONDING <br />JUMPER SHALL BE SIZED AS FOLLOWS: <br />SEE RESPECTIVE SYSTEM/DEVICE SCHEDULE <br />FOR G.E.C. SIZE. <br />SUPPLY SIDE BONDING JUMPER (SSBJ): <br />SSBJ CONDUCTOR SIZED PER ART. 250-66 (OR <br />LARGER PER ART. 250.30A(2)) TO BE INCLUDED IN <br />FEEDER TO NEXT DEVICE - SEE FEEDER <br />SCHEDULE. SSBJ SHALL BE CONNECTED TO THE <br />GROUNDING SYSTEM AT THE FIRST <br />DISCONNECTING MEANS. <br />SYSTEM BONDING JUMPER: <br />COPPER CONDUCTOR/BUSSING SIZED PER TABLE 250.66 (OR <br />LARGER PER ART. 250.28(D)(1)) TO THE METAL FRAME OF THE <br />SEPARATELY DERIVED SYSTEM. <br />A SCALE: NTS <br />SEPARATELY DERIVED SYSTEM (SDS) GROUNDING DETAIL <br />(OCPD NOT A PART OF SDS) <br />CONTRACTOR IS SOLELY RESPONSIBLE FOR OBTAINING EQUIPMENT SCCR RATING FROM ALL OTHER PROJECT TRADES AND FOR ANY <br />OWNER-FURNISHED OR TENANT-FURNISHED EQUIPMENT CONNECTED TO THE ELECTRICAL SYSTEM IN ORDER TO VALIDATE AVAILABLE FAULT <br />CURRENT AT THE EQUIPMENT CONNECTIONS IS LESS THAN THE RESPECTIVE EQUIPMENT SCCR. <br />i.AS A PART OF A CLOSEOUT SUBMITTAL TO BE SUBMITTED TO THE ENGINEER PRIOR TO FINAL PROJECT CONSTRUCTION OBSERVATIONS, <br />CONTRACTOR SHALL PROVIDE PHOTOS OF ALL ADJUSTABLE CIRCUIT BREAKERS DEPICTING THEIR FINAL SETTINGS BASED ON THE POWER <br />SYSTEMS STUDY. SUBMITTAL SHALL BE ORGANIZED WITH OCPD IDENTIFICATION, OCPD PHOTO IMAGE AND RESPECTIVE POWER SYSTEM <br />STUDY OCPD SETTING REQUIREMENTS TO ALLOW EFFICIENT CONFIRMATION OF RECORD SETTINGS. PLEASE NOTE THAT IMAGES MAY NEED <br />TO BE TAKEN PRIOR TO INSTALLATION OF EQUIPMENT COVERS/EQUIPMENT ENERGIZATION SINCE OCPD SETTINGS MAY BE OBSTRUCTED BY <br />EQUIPMENT COVERS. <br />GROUNDING ELECTRODE & CONDUCTOR - ALTERNATE #2: <br />WHERE NO EFFECTIVE GROUNDING ELECTRODE IS AVAILABLE PER ART. <br />250.30(A)(4) OR ART. 250.52(A)(3) OR (4), PROVIDE 1 # CU. IN CONDUIT TO <br />OTHER LOCAL METAL UNDERGROUND PIPING SYSTEMS AND TANKS, OR <br />ROD AND PIPE ELECTRODES, MIN. OF 10 FT. IN LENGTH, WHICH SHALL BE <br />INSTALLED PER ART. 250.52(A)(5)(a) & (b), OR PLATE ELECTRODES, <br />WHICHEVER IS AVAILABLE, PER ART 250.52 (A)(5), (A)(6), (A)(7), & (A)(8). <br />TD1 75 ALUMINUM 480 3 3 120/208 3 4 2.6 8,010 N/A 1/2"C, #2 N/A 3R/F 43 35 27 710 - <br />FINISHED FLOOR <br />B SCALE: NTS <br />FEEDER TO REMOTE BUILDING / STRUCTURE GROUNDING DETAIL <br />TELECOMMUNICATION GROUND: <br />1 # cu., IN CONDUIT TO TELECOMMUNICATIONS <br />ROOM BACKBOARDS AND GROUNDING BUS BARS. IF <br />PROVIDED IN PROJECT DRAWINGS, SEE TELECOM <br />PATHWAYS AND GROUNDING RISER FOR ADDITIONAL <br />REQUIREMENTS. <br />GROUNDING ELECTRODE CONDUCTOR: <br />1 # cu., GROUNDING ELECTRODE CONDUCTOR PER ART. 250.32(E). <br />EXTENDED FROM SWITCHBOARD GROUND BUS WITH CODE-SIZED EMT, <br />IMC, OR RIGID CONDUIT AS CONDITIONS DICTATE. TERMINATE FEEDER <br />EQUIPMENT GROUNDING CONDUCTOR AT THE SWITCHBOARD GROUND <br />BUS AS WELL - SEE SINGLE LINE. <br />1 # cu. IN CONDUIT TO EFFECTIVELY <br />GROUNDED METAL FRAME OF THE BLDG. PER <br />ART. 250.52(A)(2). <br />(1) MINIMUM 20 FT. LENGTH OF #4 MINIMUM/ <br />1# BARE COPPER ENCASED IN MINIMUM 2" <br />OF CONCRETE ALL AROUND PER ART. <br />250.52(A)(3).GROUNDING ELECTRODE & CONDUCTOR - ALTERNATE: <br />1 #6 cu., 1/2"C. TO ELECTRODE PER ART. 250.52(A)(4), (A)(5), (A)(6), (A)(7) & <br />250.53 WHERE NONE OF THE ELECTRODES IN ART. 250.52 (A)(1), (A)(2) & <br />(A)(3) ARE AVAILABLE. <br />PROVIDE CONNECTION OF GROUNDING CONDUCTORS/ BONDING JUMPERS PER <br />ART.250.8 (TYPICAL) USING 2-HOLE CONNECTORS. <br />TELEPHONE/CATV UTILITY GROUND: <br />1 # cu. IN CONDUIT TO UTILITY CO. <br />TELEPHONE/CATV BACKBOARD. <br />TO GROUND BUS LOCATED WITHIN EACH BUILDING SWITCHBOARD, DISTRIBUTION <br />BOARD, PANEL BOARD AND/OR FEEDER DISCONNECT FEEDING THE REMOTE <br />BUILDING OR STRUCTURE. <br />BONDING JUMPER(S): <br />PROVIDE BONDING WITH 1 # cu., IN CONDUIT TO NEAREST METAL, WATER PIPE <br />(HOT, COLD, SPRINKLER, SEWER, BUILDING MOUNTED - INTERIOR OR EXTERIOR ETC), <br />UNINTENTIONALLY UNGROUNDED BUILDING STEEL, GAS PIPE, HVAC DUCTS IN THE <br />BUILDING PER ART. 250.104 (A), (B), & (C). <br />THIS DETAIL APPLIES TO BUILDINGS OR STRUCTURES SUPPLIED BY FEEDERS OR BRANCH CIRCUITS GOVERNED BY ART. 250.32 AND SPECIFICALLY BY ART. <br />250.32(B)(1) WHERE THE GROUNDED CONDUCTOR IS NOT CONNECTED TO THE GEC IN THE SUPPLIED BUILDING DUE TO THE POSSIBILITY OF PARALLEL CIRCUIT <br />PATHS FOR NEUTRAL CURRENT. WHERE THE STUCTURE OR BUILDING SUPPLIED IS EXISTING, CONTRACTOR SHALL MAKE EVERY EFFORT TO <br />EXTEND/RECONNECT EXISTING GROUNDING ELECTRODE(S)/SYSTEM. <br />MOUNT TO WALL USING STAND-OFF INSULATORS <br />AND BRACKETS. TYPICAL. <br />2,000A <br />0-200A <br />201-400A <br />OVER 401A <br />2,500A <br />4,000A <br />3,000A <br />SERVICE SIZE <br />SERVICE SIZE <br />0-1,000A <br />1,600A <br />1,200A <br />#400KCMIL, 1-1/4"C <br />#4, 3/4"C <br />#3/0, 3/4"C <br />#1/0, 3/4"C <br />G.E.C. SIZE <br />#500KCMIL, 1-1/4"C <br />#700KCMIL, 1-1/2"C <br />#600KCMIL, 1-1/2"C <br />B.J. SIZE <br />#300KCMIL, 1"C <br />#3/0, 3/4"C <br />#4/0, 1"C <br />BONDING JUMPER (B.J.) SHALL BE <br />SIZED AS FOLLOWS: <br />GROUNDING ELECTRODE CONDUCTOR <br />SHALL BE SIZED AS FOLLOWS: <br />TELECOMMUNICATIONS GROUND <br />CONDUCTOR. MINIMUM SIZE SHALL BE BASED <br />ON DISTANCE BETWEEN <br />TELECOMMUNICATIONS ROOM AND SYSTEM <br />GROUNDING BUS BAR AS FOLLOWS: <br />LESS THAN 13' <br />14'-41' <br />42'-66' <br />67'-105' <br />106'-175' <br />176'+ <br />#6, 3/4"C <br />#1, 3/4"C <br />#2/0, 3/4"C <br />#4/0, 1"C <br />#300 KCMIL, 1-1/4"C <br />#500 KCMIL, 1-1/2"C <br />PROVIDE AT LEAST (3) SPARE DRILLED CONNECTION POINTS. <br />PROVIDE PERMANENT TAG TO IDENTIFY EACH CONDUCTOR. <br />1/4"x3"x LENGTH AS REQUIRED. COPPER GROUND BUS OUTSIDE <br />SWITCHBOARD, DRILLED AND TAPPED AS REQUIRED. PROVIDE PHENOLIC <br />LABEL INDICATING "MAIN ELECTRICAL SERVICE GROUND". SEE <br />ELECTRICAL SPECIFICATIONS FOR MORE INFORMATION. <br />1 # cu., 1"C. INTERCONNECT TO ALL OTHER <br />ELECTRICAL FEEDERS. PER ART. 250.58. <br />GROUNDING ELECTRODE & CONDUCTOR: <br />1 # cu., 3/4"C. TO METAL UNDERGROUND WATER <br />PIPE (MINIMUM OF 10FT LONG) PER ART. 250.52(A)(1) <br />WITH A CONNECTION MADE WITHIN 5 FT. OF POINT OF <br />ENTRANCE INTO THE BUILDING PER ART. 250.68(C)(1). <br />tk1sc project number: B2305501.000 <br />drawn by:checked by: <br />drawing no.: <br />ar <br />c <br />h <br />i <br />t <br />e <br />c <br />t <br />u <br />r <br />e <br />pl <br />a <br />n <br />n <br />i <br />n <br />g <br />in <br />t <br />e <br />r <br />i <br />o <br />r <br />s <br />tB <br />P <br />/ <br />A <br />r <br />c <br />h <br />i <br />t <br />e <br />c <br />t <br />u <br />r <br />e <br />46 <br />1 <br />1 <br /> <br />T <br />e <br />l <br />l <br />e <br />r <br /> <br />A <br />v <br />e <br />n <br />u <br />e <br />Ne <br />w <br />p <br />o <br />r <br />t <br /> <br />B <br />e <br />a <br />c <br />h <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />6 <br />6 <br />0 <br />ph <br />: <br /> <br />9 <br />4 <br />9 <br />. <br />6 <br />7 <br />3 <br />. <br />0 <br />3 <br />0 <br />0 <br />consultant <br />agency <br />owner <br />date: <br />drawing title: <br />description:date:Rev: <br />tBP project number : <br />architect <br />THIS DRAWING AND THE DESIGNS, DEPICTIONS, IDEAS AND OTHER INFORMATION <br />CONTAINED HEREIN CONSTITUTE UNPUBLISHED WORK OF tBP/ARCHITECTURE AND <br />SHALL REMAIN THE PROPERTY OF tBP/ARCHITECTURE IN PERPETUITY. NO PART <br />THEREOF SHALL BE REPRODUCED, DISCLOSED, DISTRIBUTED, SOLD, PUBLISHED OR <br />OTHERWISE USED IN ANY WAY WITHOUT THE ADVANCED EXPRESS WRITTEN CONSENT <br />OF tBP/ARCHITECTURE. <br />ph: 714.667.2700 <br />SANTA ANA, CA 92701 <br />20 CIVIC CENTER PLAZA <br />SANTA ANA PLANNING AND BUILDING AGENCY <br /># <br />DA <br />N <br />C <br />E <br /> <br />S <br />T <br />U <br />D <br />I <br />O <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br />L <br />I <br />F <br />O <br />R <br />N <br />I <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />12 <br />0 <br />2 <br /> <br />W <br /> <br />E <br />D <br />I <br />N <br />G <br />E <br />R <br /> <br />A <br />V <br />E <br />MA <br />T <br />E <br />R <br /> <br />D <br />E <br />I <br /> <br />H <br />I <br />G <br />H <br /> <br />S <br />C <br />H <br />O <br />O <br />L <br />21125.00 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br />L <br />I <br />F <br />O <br />R <br />N <br />I <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />12 <br />0 <br />2 <br /> <br />W <br /> <br />E <br />D <br />I <br />N <br />G <br />E <br />R <br /> <br />A <br />V <br />E <br />MA <br />T <br />E <br />R <br /> <br />D <br />E <br />I <br /> <br />H <br />I <br />G <br />H <br /> <br />S <br />C <br />H <br />O <br />O <br />L <br />21125.00 <br />09/06/2023 <br />11870 Pierce Street, Suite 160 <br />Riverside, California 92505 <br />951.299.4160 www.tk1sc.com <br />Project Leader - Bill Voller <br />tk1sc Job #: B2305501.000 <br />Electrical Lead - Marie Rothenberger <br />City Submittal 09/06/23- <br />TRANSFORMER <br />INFORMATION + <br />GROUNDING DETAILS <br />E2-2 <br />21159.00 <br />1202 W Edinger <br />Ave10/3/2024