Laserfiche WebLink
A/C AIR CONDITIONING <br />ABV ABOVE <br />ACCEPT ACCEPTANCE <br />ACU AIR CONDITIONING UNIT <br />AD ACCESS DOOR <br />ADA AMERICANS WITH DISABILITIES ACT <br />ADD ADDITION <br />AFF ABOVE FINISH FLOOR <br />AHJ AUTHORITY HAVING JURISDICTION <br />AHU AIR HANDLING UNIT <br />AP ACCESS PANEL <br />APPROX APPROXIMATE <br />ARCH ARCHITECTURAL <br />ARI AMERICAN REFRIGERATION INSTITUTE <br />AS AIR SEPARATOR <br />ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS <br />AUTO AUTOMATIC <br />AUX AUXILIARY <br />AV AIR VENT <br />B BOILER <br />BAS BUILDING AUTOMATION SYSTEM <br />BDD BACKDRAFT DAMPER <br />BFF BELOW FINISH FLOOR <br />BLDG BUILDING <br />BOD BOTTOM OF DUCT <br />BOP BOTTOM OF PIPE <br />BSMT BASEMENT <br />BV BALL VALVE <br />BYV BUTTERFLY VALVE <br />C COMMON, CONDENSATE OR CONDUIT <br />CA CONTROL AIR, or COMBUSTION AIR <br />CAC CALIFORNIA ADMINISTRATIVE CODE <br />CAP CAPACITY <br />CAV CONSTANT AIR VOLUME <br />CB CHILLED BEAM <br />CBC CALIFORNIA BUILDING CODE <br />CC COOLING COIL OR CONTROLS CONTRACTOR <br />CD CONSTRUCTION DOCUMENTS <br />CEC CALIFORNIA ELECTRICAL CODE <br />CFC CALIFORNIA FIRE CODE <br />CFM CUBIC FEET PER MINUTE <br />CH CHILLER <br />CHV CHECK VALVE <br />CHWP CHILLED WATER PUMP <br />CHWR CHILLED WATER RETURN <br />CHWS CHILLED WATER SUPPLY <br />CL CENTERLINE <br />CLG CEILING <br />CMC CALIFORNIA MECHANICAL CODE <br />CONN CONNECTION <br />CP CONTROL PANEL <br />CPC CALIFORNIA PLUMBING CODE <br />CV CONSTANT VOLUME OR CONTROL VALVE <br />CWP CONDENSER WATER PUMP <br />CWR CONDENSER WATER RETURN <br />CWS CONDENSER WATER SUPPLY <br />D DROP OR DRAIN <br />DDC DIRECT DIGITAL CONTROL <br />DEMO DEMOLISH / DEMOLITION <br />DEPT DEPARTMENT <br />DET DETAIL <br />DIA DIAMETER <br />DIFF DIFFERENCE <br />DISCH DISCHARGE <br />DN DOWN <br />DV DIAPHRAGM VALVE <br />DWG DRAWING <br />DX DIRECT EXPANSION <br />(E)EXISTING TO REMAIN <br />EA EXHAUST AIR OR EACH <br />EC ELECTRICAL CONTRACTOR <br />ECON ECONOMIZER <br />EF EXHAUST FAN <br />EL ELEVATION <br />ELEC ELECTRICAL <br />EQUIP EQUIPMENT <br />ET EXPANSION TANK <br />EXH EXHAUST <br />FC FLEXIBLE CONNECTION OR FAIL CLOSED <br />FCU FAN COIL UNIT <br />FD FIRE DAMPER <br />FF FINISH FLOOR OR FINAL FILTER <br />FFE FINISH FLOOR ELEVATION <br />FLR FLOOR <br />FPB FAN POWERED BOX <br />FSD FIRE/SMOKE DAMPER <br />FT FOOT / FEET <br />G GAS <br />GA GAUGE, GAGE <br />GALV GALVANIZED <br />GLV GLOBE VALVE <br />GN GENERAL NOTE <br />GND GROUND <br />GPM GALLON PER MINUTE <br />GV GATE VALVE <br />HC HEATING COIL <br />HP HORSEPOWER <br />HP HIGH PRESSURE <br />HP HEAT PUMP <br />HPC HIGH PRESSURE CONDENSATE <br />HPS HIGH PRESSURE STEAM <br />HRU HEAT RECOVERY UNIT <br />HVAC HEATING, VENTILATION & AIR CONDITIONING <br />HW HEATING WATER <br />HWP HEATING WATER PUMP <br />HWR HEATING WATER RETURN <br />HWS HEATING WATER SUPPLY <br />HX HEAT EXCHANGER <br />ID INSIDE DIAMETER <br />IE INVERT ELEVATION <br />IN INCH <br />L LENGTH <br />LP LOW PRESSURE <br />LPC LOW PRESSURE CONDENSATE <br />LPS LOW PRESSURE STEAM <br />M MOTOR <br />MA MIXED AIR <br />MAX MAXIMUM <br />MC MECHANICAL CONTRACTOR <br />MCC MOTOR CONTROL CENTER <br />MECH MECHANICAL <br />MIN MINIMUM <br />MPC MEDIUM PRESSURE CONDENSATE <br />MPS MEDIUM PRESSURE STEAM <br />MV MANUAL AIR VENT <br />(N)NEW <br />N/A NOT APPLICABLE <br />NC NORMALLY CLOSED <br />NFPA NATIONAL FIRE PROTECTION ASSOCIATION <br />NIC NOT IN CONTRACT <br />NTS NOT TO SCALE <br />OA OUTSIDE AIR <br />OBD OPPOSED BLADE DAMPER <br />OC ON CENTER <br />OD OUTSIDE DIAMETER <br />OFCI OWNER FURNISHED CONTRACTOR INSTALLED <br />OFOI OWNER FURNISHED OWNER INSTALLED <br />P PUMP OR PRESSURE OR POLE <br />PC PUMPED CONDENSATE <br />PD PRESSURE DROP <br />PF PRE FILTER <br />PG PIPE GUIDE OR PRESSURE GAUGE <br />PH PHASE <br />PLBG PLUMBING <br />POC POINT OF CONNECTION <br />POD POINT OF DISCONNECTION <br />PS PRESSURE SENSOR <br />PSI POUNDS PER SQUARE INCH <br />QTY QUANTITY <br />( R )REMOVE <br />R RISERS, RELOCATE OR RISE <br />RA RETURN AIR <br />REFRIG REFRIGERANT <br />REQ'D REQUIRED <br />REV REVISE, REVISION OR REVOLUTIONS <br />RF RETURN FAN <br />RHC REHEAT COIL <br />RM ROOM <br />RS REFRIGERANT SUCTION <br />RTU ROOFTOP UNIT <br />SA SUPPLY AIR <br />SAN SANITARY <br />SD SMOKE DAMPER <br />SEN SENSIBLE <br />SF SUPPLY FAN OR SQUARE FEET <br />SP STATIC PRESSURE <br />SPEC SPECIFICATION <br />SQ FT SQUARE FEET <br />SQ IN SQUARE INCH <br />ST STRAINER OR SOUND TRAP OR STEAM TRAP <br />STD STANDARD <br />STRUC STRUCTURAL <br />T THERMOSTAT OR THERMOMETER OR THROAT <br />TCP TEMPERATURE CONTROL PANEL <br />TDH TOTAL DYNAMIC HEAD <br />TEMP TEMPERATURE <br />THRU THROUGH <br />TI TENANT IMPROVEMENT <br />TS TEMPERATURE SENSOR <br />TSP TOTAL STATIC PRESSURE <br />TYP TYPICAL <br />UC UNDERCUT DOOR <br />UG UNDERGROUND <br />UH UNIT HEATER <br />UNO UNLESS NOTED OTHERWISE <br />VAV VARIABLE AIR VOLUME <br />VD VOLUME DAMPER <br />VEL VELOCITY <br />VFD VARIABLE FREQUENCY DRIVE <br />W/WITH <br />W/O WITHOUT <br />WG WATER GAUGE <br />WPD WATER PRESSURE DROP <br />WSHP WATER SOURCE HEAT PUMP <br />WT WEIGHT <br />XFMR TRANSFORMER <br />FR FIRE WRAP <br />IW INDUSTRIAL WASTE <br />PE PNEUMATIC ELECTRIC <br />PCR PRESSURIZED CONDENSATE RETURN <br />TOP TOP OF DUCT <br />WMS WIRE MESH SCREEN <br />ABBREVIATIONS <br />BACKDRAFT DAMPER <br />OXYGEN SENSOR0 <br />AUTOMATIC DAMPER (WITH ACTUATOR) <br />REMOVE EXIST. EQUIP., PIPES, OR DUCT SHOWN HATCHED <br />SWITCH (MANUAL WALL MOUNT OR DOOR INTERLOCK) <br />HUMIDITY SENSOR <br />DOOR LOUVER OR UNDERCUT <br />DUCT RISE / DUCT DROP <br />D.L./U.C. <br />MANUAL VOLUME DAMPER <br />S <br />H <br />FIRE DAMPER <br />R <br />EXIST. DUCTWORK TO BE REMOVED & CAPPED <br />EXIST. MECHANICAL EQUIPMENT & DUCT <br />EXIST. DIFFUSER, RETURN AIR GRILLE OR EXHAUST GRILLE TO <br />BE REMOVED <br />CO2 SENSORCO2 <br />x ROOM THERMOSTAT & ZONE NUMBERT <br />EM <br />ME <br />M <br />INSTALLED BY MECHANICAL <br />FURNISHED BY ELECTRICAL <br />BY MECHANICAL <br />FURNISHED & INSTALLED <br />INSTALLED BY ELECTRICAL <br />FURNISHED BY MECHANICAL <br />TOTAL LENGTH (FT) <br />CFM/FT <br /># OF SLOTS - SLOT WIDTH <br />AIR QUANTITY (C.F.M.) <br />NECK SIZE <br />SUPPLY, RETURN, & EXHAUST REGISTER <br />LINEAR SUPPLY & RETURN <br />POINT OF CONNECTION <br />E <br />FURNISHED & INSTALLED <br />BY ELECTRICAL <br />LIMIT OF DEMOLITION <br />AIR QUANTITY (CFM) <br />NECK SIZE <br />RELIEF AIR GRILLE <br />DESCRIPTIONSYMBOL <br />HVAC LEGEND <br />CONTROLS (PLAN) <br />SMOKE DETECTORSD <br />DUCTWORK <br />14x12 <br />RECTANGULAR DUCT SIZE <br />(WIDTH x DEPTH IN INCHES) <br />DUCT WITH SOUND INSULATION <br />STAINLESS STEEL DUCTWORK <br />SUPPLY AIR <br />RETURN AIR <br />EXHAUST AIR <br />FLEXIBLE DUCT <br />14x12 <br />ROUND DUCT SIZE <br />(WIDTH x DEPTH IN INCHES) <br />14"Ø <br />14"Ø <br />RECTANGULAR DUCT UP <br />RECTANGULAR DUCT DOWN <br />DUCT TRANSITION (RECTANGULAR TO ROUND) <br />LINEAR DIFFUSER <br />XY.ZZZ KEYNOTE <br />GENERAL <br />MECHANICAL GENERAL NOTES <br />DEMOLITION NOTES <br />EQUIPMENT ANCHORAGE AND SYSTEM BRACING <br />1.ALL MECHANICAL, PLUMBING, AND ELECTRICAL COMPONENTS SHALL BE ANCHORED AND <br />INSTALLED PER THE DETAILS ON THE APPROVED CONSTRUCTION DOCUMENTS. WHERE NO <br />DETAIL IS INDICATED, THE FOLLOWING COMPONENTS SHALL BE ANCHORED OR BRACED TO <br />MEET THE FORCE AND DISPLACEMENT REQUIREMENTS PRESCRIBED IN THE 2022 CALIFORNIA <br />BUILDING CODE REQUIREMENTS IN ACCORDANCE WITH THE AMERICAN SOCIETY OF CIVIL <br />ENGINEERS - ASCE 7-10, SECTION 13.6 AND TABLE 13.6-1. <br />a.ALL PERMANENT EQUIPMENT AND COMPONENTS. <br />b.TEMPORARY OR MOVABLE EQUIPMENT THAT IS PERMANENTLY ATTACHED (E.G. HARD <br />WIRED) TO THE BUILDING UTILITY SERVICE SUCH AS ELECTRICITY, GAS OR WATER. <br />c.MOVABLE EQUIPMENT WHICH IS STATION IN ONE PLACE FOR MORE THAN 8 HOURS AND <br />HEAVIER THAN 400 POUNDS ARE REQUIRED TO BE ANCHORED WITH TEMPORARY <br />ATTACHMENTS. <br />2.THE FOLLOWING MECHANICAL AND ELECTRICAL COMPONENTS SHALL BE POSITIVELY ATTACHED <br />TO THE STRUCTURE, BUT THE ATTACHMENT NEED NOT TO BE DETAILED ON PLAN. THESE <br />COMPONENTS SHALL HAVE FLEXIBLE CONNECTIONS PROVIDED BETWEEN THE COMPONENT <br />AND ASSOCIATED DUCTWORK, PIPING AND CONDUIT. <br />a.COMPONENTS WEIGHING LESS THAN 400 POUNDS AND HAVE A CENTER OF MASS LOCATED <br />4 FEET OR LESS ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT DIRECTLY SUPPORT THE <br />COMPONENT. <br />b.COMPONENTS WEIGHING LESS THAN 20 POUNDS, OR IN THE CASE OF DISTRIBUTED <br />SYSTEMS, LESS THAN 5 POUNDS PER FOOT, WHICH ARE SUSPENDED FROM A ROOF OR <br />FLOOR HUNG FROM WALL. <br />3.FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS ON THE APPROVED DRAWINGS, THE <br />INSTALLATION SHALL BE INSTALLED PER SMACNA GUIDELINES AND/OR MANUFACTURER'S <br />RECOMMENDATIONS. <br />4.SEISMIC ANCHORAGE OF EQUIPMENT AND BRACING OF PIPING/DUCTWORK SYSTEMS SHALL BE <br />PROVIDED IN ACCORDANCE WITH THE AMERICAN SOCIETY OF CIVIL ENGINEERS - ASCE 7-10, <br />SECTION 13.6 AND TABLE 13.6-1. <br />1.ALL DRAWINGS ARE CONSIDERED TO BE PART OF THE CONTRACT DOCUMENT. THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND COORDINATION OF ALL <br />DRAWINGS PRIOR TO ANY CONSTRUCTION, INCLUDING STRUCTURAL, PLUMBING, AIR <br />CONDITIONING AND ELECTRICAL. ANY DISCREPANCIES THAT OCCUR SHALL BE BROUGHT <br />TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF CONSTRUCTION SO <br />THAT A CLARIFICATION CAN BE ISSUED. ANY WORK PERFORMED IN CONFLICT WITH THE <br />CONTRACT DOCUMENTS OR ANY CODE REQUIREMENT SHALL BE CORRECTED BY THE <br />CONTRACTOR AT HIS OWN EXPENSE, AND AT NO EXPENSE TO THE OWNER. <br />2.ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED TO BE <br />CONSTRUCTION STANDARDS. IF CLARIFICATION IS REQUIRED, THE CONTRACTOR SHALL <br />NOTIFY ENGINEER PRIOR TO PROCEEDING WITH THE WORK. <br />3.DO NOT SCALE DRAWINGS. ALL DIMENSIONS AND JOB SITE CONDITIONS SHALL BE <br />VERIFIED BY THE CONTRACTOR AT THE JOB SITE PRIOR TO BID SUBMITTAL, START OF <br />CONSTRUCTION AND/OR FABRICATION OF MATERIALS. IF DISCREPANCIES ARE <br />ENCOUNTERED, THE ENGINEER SHALL BE NOTIFIED FOR CLARIFICATION. <br />4.THE CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR, EQUIPMENT, <br />TRANSPORTATION AND SERVICES NECESSARY FOR COMPLETION OF THE WORK AND <br />PROVIDE A FULLY OPERATIONAL SYSTEM. ALL MATERIALS AND WORK SHALL COMPLY <br />WITH APPLICABLE CODES AND GOVERNING REGULATIONS AND MEET THE APPROVAL OF <br />THE CITY AND STATE FIRE MARSHALL. <br />5.CONTRACTOR SHALL PROVIDE AND BE RESPONSIBLE FOR PROTECTION AND REPAIR OF <br />ADJACENT EXISTING SURFACES AND AREAS WHICH MAY BE DAMAGED AS A RESULT OF <br />DEMOLITION AND/OR NEW WORK. <br />6.ALL EQUIPMENT THAT IS REMOVED AND NOT REUSED SHALL BE COORDINATED WITH, <br />AND/OR RETURNED TO, THE BUILDING OWNER. <br />7.ALL EXISTING DUCT TAPS THAT ARE REMOVED AND NOT REUSED SHALL BE CAPPED <br />AIRTIGHT AND SEALED WITH "MIRACLE" DUCT SEALER AND D-617 OR EQUAL. <br />8.VERIFY FINAL LOCATION OF THERMOSTATS WITH ARCHITECT AND/OR TENANT <br />CONSTRUCTION COORDINATOR PRIOR TO ANY INSTALLATION WORK. <br />9.CONTRACTOR SHALL PROVIDE RECORD/AS BUILT DOCUMENTS TO CONSTRUCTION <br />COORDINATOR, ARCHITECT AND ENGINEER AT COMPLETION OF CONSTRUCTION. <br />10.MAINTAIN NET FREE AREA EQUAL TO DUCT SIZE WHERE FIRE DAMPERS OCCUR. <br />11.ROOM THERMOSTATS SHALL BE CAPABLE OF BEING SET TO MAINTAIN SPACE <br />TEMPERATURE SET POINTS FOR 55° F TO 85° F AND SHALL BE CAPABLE OF OPERATING <br />THE HEATING AND COOLING IN SEQUENCE. THERMOSTATS SHALL BE ADJUSTABLE TO <br />PROVIDE A TEMPERATURE RANGE OF UP TO 5° F BETWEEN FULL HEATING AND FULL <br />COOLING BEING SUPPLIED. TEMPERATURE CONTROL SYSTEM SHALL OPERATE IN <br />ACCORDANCE WITH THE BASE BUILDING SEQUENCE OF OPERATION <br />12.PROVIDE MINIMUM DUCT RADIUS ON ELBOWS AT 1-1/2 TIMES DUCT SIZE. <br />13.ALL CEILING DIFFUSERS ARE 4-WAY THROW UNLESS NOTED OTHERWISE. <br />13.1.DIFFUSERS SHALL BE ADJUSTED BY MECHANICAL CONTRACTOR AND/OR TEST & <br />BALANCE CONTRACTOR FROM 4-WAY TO 3-WAY OR 2-WAY WHEN WITHIN 3'-0" OF <br />ADJACENT WALL OR CORNER. SUBMIT PROPOSED ADJUSTMENTS IN WRITING PRIOR <br />TO ADJUSTING. <br />14.CONTRACTOR SHALL STRICTLY COORDINATE ALL CEILING DIFFUSERS AND GRILLES <br />WITH ARCHITECTURAL REFLECTED CEILING PLAN. IF ANY DISCREPANCIES ARE <br />ENCOUNTERED THE ENGINEER SHALL BE NOTIFIED FOR CLARIFICATION. VERIFY WITH <br />OWNERS REPRESENTATIVE IN FIELD PRIOR TO INSTALLATION. <br />15.RETURN AIR PLENUM SHALL NOT CONTAIN ANY COMBUSTIBLES. <br />16.MATERIALS EXPOSED WITHIN DUCT OR PLENUM SHALL COMPLY WITH SECTION 602.2 OF <br />THE 2022 CMC. ALL MATERIALS EXPOSED WITHIN THE CEILING PLENUM SHALL HAVE A <br />FLAME-SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF <br />NOT MORE THAN 50. <br />17.PROVIDE SMOKE DETECTORS IN MAIN SUPPLY AIR DUCTS OF AIR MOVING SYSTEMS <br />EXCEEDING 2,000 CFM AND ANY COMBINATION OF SYSTEMS SERVING AREAS <br />PERMANENTLY OPEN TO EACH OTHER WHOSE COMBINED SUPPLY AIR EXCEEDS 2,000 <br />CFM PER SECTION 609.1 OF THE 2022 CMC. <br />18.MECHANICAL REFRIGERATION SYSTEMS SHALL COMPLY WITH REQUIREMENTS OF <br />SECTION 608 OF THE 2022 CFC. <br />19.ENVIRONMENTAL AIR DUCTS SHALL NOT TERMINATE LESS THAN 3-FT. FROM A <br />PROPERTY LINE, 10-FT FROM A FORCED AIR INLET, 10-FT ABOVE A PUBLIC WALKWAY <br />AND 3-FT FROM OPENINGS INTO THE BUILDING, PER 2022 CMC 502.2.1. <br />20.HEATING HOT WATER AND CHILLED WATER PIPING SHALL BE INSTALLED AS HIGH AS <br />POSSIBLE. <br />21.THE CONTRACTOR SHALL COORDINATE ALL CEILING ACCESS PANELS FOR SERVICING <br />MECHANICAL EQUIPMENT/DEVICES WITH THE ARCHITECT AND INTERIOR DESIGNER AS <br />APPLICABLE. <br />22.PRIOR TO ROUGH-IN OF ELECTRICAL. PROVIDE COORDINATION SHOP DRAWINGS OF <br />T-STAT LOCATIONS TO ARCH./ENG. FOR REVIEW. <br />23.DUCT SEALING: <br />23.1.DUCTWORK SHALL BE SEALED PRIOR TO DELIVERY TO JOB SITE. <br />23.2.DUCTWORK SHALL BE SEALED DURING DELIVERY. <br />23.3.DUCTWORK SHALL BE SEALED UPON INSTALLATION. <br />23.4.OPENINGS INTO EQUIPMENT AND DUCTWORK SHALL BE SEALED DURING <br />CONSTRUCTION. <br />24.ALL CONTROL WIRING ROUTED IN CEILING PLENUM SHALL BE CLEARLY IDENTIFIED & <br />SECURED TO DUCTWORK OR TIGHT TO STRUCTURE TO PREVENT DAMAGE DURING <br />FUTURE TENTANT IMPROVEMENT PROJECTS. <br />25.THE CONTRACTOR SHALL VERIFY ALL DIFFUSER/GRILLE/REGISTER/BORDER AND FRAME <br />TYPES WITH THE ARCHITECTURAL REFLECTED CEILING PLAN PRIOR TO ORDERING. <br />COORDINATE ALL FINISHES WITH ARCHITECT. <br />26.ALL HVAC SYSTEMS INCLUDING HYDRONIC SYSTEMS SHALL BE BALANCED IN <br />ACCORDANCE WITH AN APPROVED METHOD PER THE 2022 CMC SECTION 314.1, <br />CALGREEN AND THE ENERGY EFFICIENCY STANDARDS. <br />27.THROUGH-PENETRATIONS AND MEMBRANE PENETRATIONS SHALL BE PROTECTED BY AN <br />APPROVED PENETRATION FIRESTOP SYSTEM OR MEMBRANE PENETRATION FIRESTOP <br />SYSTEM INSTALLED AS TESTED IN ACCORDANCE WITH ASTM E 814 OR UL 1479, WITH <br />MINIMUM POSITIVE PRESSURE DIFFERENTIAL OF 0.01 INCH (2.49 PA) OF WATER OR AS <br />OTHERWISE PERMITTED BY 2022 CBC, SECTION 714. LISTED THROUGH-PENETRATION <br />FIRESTOP SYSTEMS AND MEMBRANE PENETRATIONS SHALL BE INSTALLED IN <br />ACCORDANCE WITH THE INSTALLATION FOR DETAILS LISTED SYSTEMS. LISTED <br />THROUGH-PENETRATION FIRESTOP SYSTEMS, MEMBRANE PENETRATION PROTECTION <br />AND OTHER PERMITTED MEANS AND METHODS OF PENETRATION PROTECTION SHALL BE <br />SUBMITTED TO THE AGENCY HAVING JURISDICTIONIAL AUTHORITY FOR REVIEW AND <br />APPROVAL PRIOR TO INSTALLATION. <br />28.PROVIDE BALANCING VOLUME DAMPERS IN EACH BRANCH DUCT AND IN EACH MAIN <br />DUCT TO PROVIDE FOR COMPLETE AIR BALANCING. PROVIDE ADEQUATE ACCESS. <br />OPPOSED BLADE DAMPERS (OBD'S) ARE NOT CONSIDERED BALANCING DAMPERS. <br />COORDINATE ALL LOCATIONS WITH ARCHITECT'S REFLECTED CEILING PLAN WHERE <br />REMOTE BALANCING DAMPERS ARE REQUIRED. <br />29.PROVIDE INTERNALLY LINED DUCTWORK FOR SUPPLY AND RETURN AIR PLENUMS ON <br />ALL FAN COILS WITH MINIMUM ONE-INCH THICK ACOUSTICAL DUCT LINER. <br />30.INSTALL DIELECTRIC INSULATION WHERE COPPER PIPES CONNECT TO FERROUS PIPES, <br />COMPONENTS AND EQUIPMENT. <br />31.OUTDOOR AIR SUPPLY AND EXHAUST EQUIPMENT SHALL BE INSTALLED WITH DAMPERS <br />THAT AUTOMATICALLY CLOSE UPON FAN SHUTDOWN. <br />APPLICABLE CODES <br />2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA MECHANICAL CODE <br />2022 CALIFORNIA PLUMBING CODE <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA FIRE CODE <br />2022 CALIFORNIA ENERGY STANDARDS <br />2022 CAL GREEN CODE <br />ALL OTHER APPLICABLE LOCAL AND STATE LAWS AND REGULATIONS <br />1.THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC ONLY. DO NOT SCALE THE <br />DRAWINGS TO DETERMINE THE LOCATION OF EQUIPMENT OR UTILITIES. SEE <br />ARCHITECTURAL PLANS, WHERE PROVIDED ON PROJECT, FOR EXTENT OF <br />DEMOLITION. <br />2.ITEMS NOT INDICATED TO BE REMOVED SHALL BE PROTECTED IN PLACE. <br />3.OWNER SHALL HAVE FIRST RIGHT OF REFUSAL FOR ALL ITEMS INDICATED TO BE <br />REMOVED. PENDING OWNER'S INSPECTION AND REVIEW, ALL SUCH ITEMS SHALL BE <br />REMOVED INTACT, FULLY FUNCTIONAL AND SUITABLE FOR REUSE, AND SHALL BE <br />PROTECTED FROM DAMAGE. CONTRACTOR SHALL CONFIRM WITH THE OWNER'S <br />REPRESENTATIVE ACCEPTANCE OR REFUSAL OF SUCH ITEMS. ALL ITEMS ACCEPTED <br />BY THE OWNER SHALL BE DELIVERED BY THE CONTRACTOR TO ONSITE STORAGE <br />LOCATIONS AS DIRECTED BY THE OWNER'S REPRESENTATIVE. ALL ITEMS REFUSED BY <br />THE OWNER SHALL BE DISPOSED OF BY THE CONTRACTOR IN AN APPROVED MANNER. <br />4.NO EXISTING EQUIPMENT OR MATERIAL SHALL BE REUSED WITHOUT THE SPECIFIC <br />APPROVAL OF THE OWNER'S REPRESENTATIVE. <br />5.REMOVAL OF CERTAIN EXISTING WORK WILL BE NECESSARY FOR THE SATISFACTORY <br />PERFORMANCE OF THE GENERAL WORK. NOT ALL EXISTING CONDITIONS ARE <br />DETAILED ON THE DRAWINGS. CONTRACTOR SHALL SURVEY THE SITE AND MAKE ALL <br />NECESSARY CHANGES REQUIRED BASED ON THE EXISTING CONDITIONS FOR THE <br />PROPER INSTALLATION OF NEW WORK. <br />6.UNLESS NOTED OTHERWISE, EXISTING PIPING AND COMPONENTS RENDERED <br />DEFUNCT AS PART OF THIS PROJECT SHALL BE ADDRESSED IN THE FOLLOWING <br />MANNER: DEFUNCT PIPING LOCATED IN CONCEALED AREAS WITHIN EXISTING TO <br />REMAIN WALLS, BELOW SLAB, OR BELOW GRADE SHALL BE ABANDONED IN PLACE OR <br />REMOVED AS NECESSARY TO AVOID INTERFERENCE WITH NEW WORK. EXISTING <br />DEFUNCT PIPING AND COMPONENTS LOCATED IN EXPOSED AREAS AND IN ATTIC <br />SPACE SHALL BE REMOVED TO THE NEAREST OPERATIONAL PIPING MAIN AND <br />CAPPED, INCLUDING ALL ASSOCIATED HANGERS AND STRUCTURAL SUPPORTS. <br />EXISTING DEFUNCT VENTS THROUGH ROOF SHALL BE REMOVED. COORDINATE <br />REMOVAL WITH ROOFING CONTRACTOR. <br />7.CONTRACTOR SHALL FIELD VERIFY EXISTING PIPING & DUCT RUNS, REUSE AS <br />REQUIRED AND REMOVE ALL UNUSED DUCT AND PIPING. UNUSED PIPING & DUCT IN <br />INACCESSIBLE LOCATIONS (WALLS/SHAFTS) CAN BE ABANDONED IN PLACE <br />8.THE EXISTING CONDITIONS SHOWN ARE FROM AVAILABLE RECORD DRAWINGS AND <br />SHOWN FOR REFERENCE CONTRACTOR SHALL VERIFY ACTUAL EXISTING CONDITIONS <br />AT SITE PRIOR TO SUBMITTING BID. ALL DEMOLITION, ALTERATION, EXTENSION, <br />RELOCATION, REHABILITATION WORK SHALL BE INCLUDED IN CONTRACT. NO <br />ADDITIONAL ALLOWANCE OR CHANGE ORDERS WILL BE ACCEPTED. <br />9.CONTRACTOR IS RESPONSIBLE TO RELOCATE OR REMOVE FROM WALLS, CEILINGS, <br />FLOOR SPACES, ETC. ANY EXISTING PIPING, DUCT, FIRE-SMOKE DAMPERS, OR OTHER <br />MECHANICAL EQUIPMENT WHICH INTERFERES WITH PLANNED REMODEL WORK. <br />10.NOTIFY THE ENGINEER IMMEDIATELY WHEREVER EXISTING EQUIPMENT IS <br />ENCOUNTERED WHICH MUST BE RELOCATED DUE TO THE NEW CONSTRUCTION, OR <br />NOT INDICATED ON "AS-BUILT" DRAWINGS OR WAS BURIED UNDERGROUND OR <br />EMBEDDED IN STRUCTURE WALLS. <br />11.CAREFULLY PROTECT ALL WALLS, TRIM, FLOORS, EQUIPMENT, UTILITY LINES AND <br />MATERIALS. WHEN WORKING ON FINISHED SURFACES, LIMIT DAMAGE TO THE <br />SMALLEST AREA POSSIBLE AND RESTORE TO THE ORIGINAL CONDITION ALL <br />SURFACES WHICH ARE DAMAGED BECAUSE OF THE INSTALLATION OF THIS WORK. <br />12.EQUIPMENT, MATERIALS AND SUPPLIES TEMPORARILY REMOVED FOR PROTECTION <br />SHALL BE REPLACED IN ORIGINAL LOCATIONS. ANY MATERIALS DAMAGED SHALL BE <br />REPLACED WITH NEW MATERIALS OF LIKE KIND AND QUALITY. <br />13.DEMOLITION WORK SHALL BE DONE IN A MANNER WHICH WILL NOT CAUSE <br />UNNECESSARY INCONVENIENCE OR DANGER TO USERS OF THE PREMISES AND <br />ADJACENT SITE, AND NOT INTERFERE WITH ITS OPERATION. ANY DEMOLITION WORK <br />TO BE PERFORMED MUST BE PLANNED IN ADVANCE. <br />14.RESEAL ALL PENETRATIONS OR OPENING THROUGH WALLS, CEILING, FLOORS, ETC., <br />TO MAINTAIN THE RATING OF STRUCTURE. <br />15.ALL REMOVED MATERIALS AND EQUIPMENT WHICH ARE SALVAGED MATERIALS SHALL <br />REMAIN IN THE PROPERTY OF THE OWNER. DELIVER SUCH SALVAGED MATERIALS AND <br />EQUIPMENT ON THE PREMISES AS DIRECTED BY OWNER AND NEATLY PILE OR STORE <br />AND PROTECT FROM DAMAGE. DISPOSE OF ALL HAZARDOUS MATERIAL PER FEDERAL, <br />STATE AND LOCAL REGULATIONS AND OTHER AGENCIES HAVING JURISDICTION. <br />16.ALL DEMOED, ALTERED AND RELOCATED COMPONENTS SHALL BE REFLECTED ON THE <br />AS-BUILT RECORD DOCUMENTS. <br />DELEGATED DESIGN NOTES <br />FD <br />V VENT <br />COMBINATION FIRE & SMOKE DAMPERFSD <br />CARBON MONOXIDE SENSORCO <br />NITROGEN DIOXIDE SENSOR <br />PRESSURE SENSOR (DUCT MOUNTED)SP <br />PRESSURE SENSOR (ROOM PRESSURE)P <br />NO2 <br />REF RELIEF FAN <br />PSIG POUNDS PER SQUARE INCH - GAUGE <br />ESP EXTERNAL STATIC PRESSURE <br />LBS POUNDS <br />1.THERMAL EXPANSION DELEGATED-DESIGN SUBMITTALS: FOR EACH ANCHOR AND <br />ALIGNMENT GUIDE, INCLUDING ANALYSIS DATA, SIGNED AND SEALED BY THE <br />QUALIFIED PROFESSIONAL ENGINEER RESPONSIBLE FOR THEIR PREPARATION. <br />1.1.DESIGN CALCULATIONS: CALCULATE REQUIREMENTS FOR THERMAL EXPANSION <br />OF PIPING SYSTEMS AND FOR SELECTING AND DESIGNING EXPANSION JOINTS, <br />LOOPS, AND SWING CONNECTIONS. <br />1.2.ANCHOR DETAILS: DETAIL FABRICATION OF EACH ANCHOR INDICATED. SHOW <br />DIMENSIONS AND METHODS OF ASSEMBLY AND ATTACHMENT TO BUILDING <br />STRUCTURE. <br />1.3.ALIGNMENT GUIDE DETAILS: DETAIL FIELD ASSEMBLY AND ATTACHMENT TO <br />BUILDING STRUCTURE. <br />1.4.SCHEDULE: INDICATE TYPE, MANUFACTURER'S NUMBER, SIZE, MATERIAL, <br />PRESSURE RATING, END CONNECTIONS, AND LOCATION FOR EACH EXPANSION <br />JOINT. <br />2.HANGERS & SUPPORTS DELEGATED-DESIGN SUBMITTALS: FOR HANGERS, TRAPEZE <br />HANGERS, ROOF/FLOOR SUPPORTS, WALL SUPPORTS, AND EQUIPMENT SUPPORTS <br />FOR HVAC PIPING, DUCTWORK, AND EQUIPMENT SHALL COMPLY WITH PERFORMANCE <br />REQUIREMENTS AND DESIGN CRITERIA, INCLUDING ANALYSIS DATA SIGNED AND <br />SEALED BY THE QUALIFIED PROFESSIONAL ENGINEER RESPONSIBLE FOR THEIR <br />PREPARATION. <br />2.1.DETAIL FABRICATION AND ASSEMBLY OF HANGERS, TRAPEZE HANGERS, <br />ROOF/FLOOR SUPPORTS, WALL SUPPORTS, AND EQUIPMENT SUPPORTS FOR HVAC <br />PIPING, DUCTWORK, AND EQUIPMENT. <br />2.2.INCLUDE DESIGN CALCULATIONS FOR DESIGNING HANGERS, TRAPEZE HANGERS, <br />ROOF/FLOOR SUPPORTS, WALL SUPPORTS, AND EQUIPMENT SUPPORTS FOR HVAC <br />PIPING, DUCTWORK, AND EQUIPMENT. <br />3.VIBRATION & SEISMIC DELEGATED-DESIGN SUBMITTALS: FOR EACH VIBRATION <br />ISOLATION AND SEISMIC-RESTRAINT DEVICE. <br />3.1.INCLUDE DESIGN CALCULATIONS AND DETAILS FOR SELECTING VIBRATION <br />ISOLATORS, SEISMIC RESTRAINTS, AND VIBRATION ISOLATION BASES COMPLYING <br />WITH PERFORMANCE REQUIREMENTS, DESIGN CRITERIA, AND ANALYSIS DATA <br />SIGNED AND SEALED BY THE QUALIFIED PROFESSIONAL ENGINEER RESPONSIBLE <br />FOR THE PREPARATION. <br />3.2.DESIGN CALCULATIONS: CALCULATE STATIC AND DYNAMIC LOADING DUE TO <br />EQUIPMENT WEIGHT, OPERATION, AND SEISMIC FORCES REQUIRED TO SELECT <br />VIBRATION ISOLATORS AND SEISMIC RESTRAINTS AND FOR DESIGNING VIBRATION <br />ISOLATION BASES. <br />3.2.1.COORDINATE DESIGN CALCULATIONS WITH WIND LOAD CALCULATIONS <br />REQUIRED FOR EQUIPMENT MOUNTED OUTDOORS. COMPLY WITH <br />REQUIREMENTS IN OTHER SECTIONS FOR EQUIPMENT MOUNTED OUTDOORS. <br />3.3.RISER SUPPORTS: INCLUDE RISER DIAGRAMS AND CALCULATIONS SHOWING <br />ANTICIPATED EXPANSION AND CONTRACTION AT EACH SUPPORT POINT, INITIAL <br />AND FINAL LOADS ON BUILDING STRUCTURE, SPRING DEFLECTION CHANGES, AND <br />SEISMIC LOADS. INCLUDE CERTIFICATION THAT RISER SYSTEM WAS EXAMINED <br />FOR EXCESSIVE STRESS AND THAT NONE EXISTS. <br />3.4.SEISMIC-RESTRAINT DETAILS: <br />3.4.1.DESIGN ANALYSIS: TO SUPPORT SELECTION AND ARRANGEMENT OF SEISMIC <br />RESTRAINTS. INCLUDE CALCULATIONS OF COMBINED TENSILE AND SHEAR <br />LOADS. <br />3.4.2.DETAILS: INDICATED FABRICATION AND ARRANGEMENT. DETAIL ATTACHMENTS <br />OF RESTRAINTS TO THE RESTRAINED ITEMS AND TO THE STRUCTURE. SHOW <br />ATTACHMENT LOCATIONS, METHODS, AND SPACINGS. IDENTIFY COMPONENTS, <br />LIST THEIR STRENGTHS, AND INDICATE DIRECTIONS AND VALUES OF FORCES <br />TRANSMITTED TO THE STRUCTURE DURING SEISMIC EVENTS. INDICATE <br />ASSOCIATION WITH VIBRATION ISOLATION DEVICES. <br />3.4.3.COORDINATE SEISMIC-RESTRAINT AND VIBRATION ISOLATION DETAILS WITH <br />WIND-RESTRAINT DETAILS REQUIRED FOR EQUIPMENT MOUNTED OUTDOORS, <br />COMPLY WITH REQUIREMENTS IN OTHER SECTIONS FOR EQUIPMENT <br />MOUNTED OUTDOORS. <br />3.4.4.PREAPPROVAL AND EVALUATION DOCUMENTATION: BY AN AGENCY <br />ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION, SHOWING MAXIMUM <br />RATINGS OF RESTRAINT ITEMS AND THE BASIS OF APPROVAL (TESTS OR <br />CALCULATIONS). <br />AIR VENT VALVE <br />PIPE ANCHOR <br />BALL VALVE <br />BUTTERFLY VALVE <br />CONTROL VALVE <br />THERMOMETER <br />PRESSURE GAUGE <br />UNION <br />STRAINER <br />REDUCER <br />CIRCUIT SETTER <br />CHECK VALVE <br />GLOBE VALVE <br />GATE VALVE <br />PIPING <br />#"-####PIPE TAG (E.G. 2"-CHWS) <br />PIPE RISE <br />PIPE DROP <br />PIPE BRANCH <br />PURGE EXHAUST CONTROL SWITCHV <br />VISUAL STROBE AND AUDIBLE HORNHS <br />REFRIGERANT LEAK DETECTION SENSORRS <br />(RAR/EAR) <br />DTR DOWN THRU ROOF <br />MAU MAKEUP AIR <br />NO NORMALLY OPENED <br />REB REBALANCE <br />REL RELOCATE <br />RL REFRIGERANT LIQUID <br />UTR UP THRU ROOF <br />PRESSURE & TEMPERATURE RELIEF VALVE <br />PRESSURE REDUCING VALVE <br />EXIST. DIFFUSER, RETURN AIR GRILLE OR EXHAUST GRILLE TO <br />REMAIN OR BE RELOCATED <br />RELOCATED EXIST. DIFFUSER, RETURN AIR GRILLE OR <br />EXHAUST GRILLE TO <br />P.I. FLOW LIMITING DEVICE <br />(REAG) <br />EQUIPMENT NUMBER <br />TYPE MARK <br />EQUIPMENT TAG <br />file name: <br />drawn by:checked by: <br />drawing no.: <br />ar <br />c <br />h <br />i <br />t <br />e <br />c <br />t <br />u <br />r <br />e <br />pl <br />a <br />n <br />n <br />i <br />n <br />g <br />in <br />t <br />e <br />r <br />i <br />o <br />r <br />s <br />tB <br />P <br />/ <br />A <br />r <br />c <br />h <br />i <br />t <br />e <br />c <br />t <br />u <br />r <br />e <br />46 <br />1 <br />1 <br /> <br />T <br />e <br />l <br />l <br />e <br />r <br /> <br />A <br />v <br />e <br />n <br />u <br />e <br />Ne <br />w <br />p <br />o <br />r <br />t <br /> <br />B <br />e <br />a <br />c <br />h <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />6 <br />6 <br />0 <br />ph <br />: <br /> <br />9 <br />4 <br />9 <br />. <br />6 <br />7 <br />3 <br />. <br />0 <br />3 <br />0 <br />0 <br />consultant <br />agency <br />owner <br />date: <br />drawing title: <br />description:date:Rev: <br />tBP project number : <br />architect <br />THIS DRAWING AND THE DESIGNS, DEPICTIONS, IDEAS AND OTHER INFORMATION <br />CONTAINED HEREIN CONSTITUTE UNPUBLISHED WORK OF tBP/ARCHITECTURE AND <br />SHALL REMAIN THE PROPERTY OF tBP/ARCHITECTURE IN PERPETUITY. NO PART <br />THEREOF SHALL BE REPRODUCED, DISCLOSED, DISTRIBUTED, SOLD, PUBLISHED OR <br />OTHERWISE USED IN ANY WAY WITHOUT THE ADVANCED EXPRESS WRITTEN CONSENT <br />OF tBP/ARCHITECTURE. <br />ph: 714.667.2700 <br />SANTA ANA, CA 92701 <br />20 CIVIC CENTER PLAZA <br />SANTA ANA PLANNING AND BUILDING AGENCY <br /># <br />DA <br />N <br />C <br />E <br /> <br />S <br />T <br />U <br />D <br />I <br />O <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br />L <br />I <br />F <br />O <br />R <br />N <br />I <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />12 <br />0 <br />2 <br /> <br />W <br /> <br />E <br />D <br />I <br />N <br />G <br />E <br />R <br /> <br />A <br />V <br />E <br />MA <br />T <br />E <br />R <br /> <br />D <br />E <br />I <br /> <br />H <br />I <br />G <br />H <br /> <br />S <br />C <br />H <br />O <br />O <br />L <br />21125.00 <br />XX/XX/2023 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br />L <br />I <br />F <br />O <br />R <br />N <br />I <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />12 <br />0 <br />2 <br /> <br />W <br /> <br />E <br />D <br />I <br />N <br />G <br />E <br />R <br /> <br />A <br />V <br />E <br />MA <br />T <br />E <br />R <br /> <br />D <br />E <br />I <br /> <br />H <br />I <br />G <br />H <br /> <br />S <br />C <br />H <br />O <br />O <br />L <br />21125.00 <br />XX/XX/2023 <br />11870 Pierce Street, Suite 160 <br />Riverside, California 92505 <br />951.299.4160 www.tk1sc.com <br />Project Leader - Bill Voller <br />tk1sc Job #: B2305501.000 <br />Mechanical Lead - Joe Millham <br />LEGEND, ABBREVIATIONS <br />& NOTES <br />M0-0 <br />21159.00 <br />1202 W Edinger <br />Ave10/3/2024