Laserfiche WebLink
DATE REVISIONS BY <br />SEAL <br />GE <br />N <br />E <br />R <br />A <br />L <br /> <br />N <br />O <br />T <br />E <br />S <br />No <br />501 S. BRAND BLVD., SUITE 3 <br /> SAN FERNANDO, CA 91340 <br />(323)486-4151 <br />STENENGINEERING.COM <br />SHEET: <br />S1 <br />DRAWN: <br />CHECKED: <br />DATE: <br />SCALE: <br />JOB #: <br />B.O. <br />E.N. <br />N.T.S. <br />EVGENY NA GOVITSY <br />N <br />07/26/24 <br />24-24-456 <br />AD <br />D <br />R <br />E <br />S <br />S <br />: <br /> <br />1 <br />5 <br />0 <br />6 <br /> <br />C <br />L <br />E <br />M <br />E <br />N <br />S <br />E <br />N <br /> <br />A <br />V <br />E <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />OW <br />N <br />E <br />R <br />: <br /> <br />N <br />A <br />N <br />C <br />Y <br /> <br />C <br />A <br />L <br />T <br />A <br />G <br />I <br />R <br />O <br />N <br />E <br />NOTICE TO OWNER <br />1.THE ENGINEER DOES NOT WARRANT OR GUARANTEE THE ACCURACY AND COMPLETENESS OF <br />THE WORK HEREIN BEYOND A REASONABLE DILIGENCE. IF ANY OMISSIONS, MISTAKES OR <br />DISCREPANCIES ARE FOUND TO EXIST WITHIN THE WORK PRODUCT, THE ENGINEER SHALL BE <br />PROMPTLY NOTIFIED SO THAT HE MAY HAVE THE OPPORTUNITY TO TAKE WHATEVER STEPS <br />NECESSARY TO RESOLVE THEM. FAILURE TO PROMPTLY NOTIFY THE ENGINEER OF SUCH <br />CONDITIONS SHALL ABSOLVE HIM FROM ANY RESPONSIBILITY FOR THE CONSEQUENCES OF <br />SUCH FAILURE. <br />2.THE CONTRACTOR SHALL BE REQUIRED TO PERFORM AND INSTALL ANY AND ALL WORK, <br />LABOR AND MATERIALS WHICH ARE NECESSARY. ALL CONTRACTORS SHALL BE LICENSED AND <br />INSURED, OTHERWISE THE ENGINEER DOES NOT ASSUME ANY RESPONSIBILITY FOR HIS WORK. <br />CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND EXISTING CONDITIONS PRIOR <br />TO STARTING ANY WORK. <br />3. ALL WORK SHALL CONFORM TO LOCAL AND NATIONAL CODES AND THE WORK HEREIN IS <br />DEEMED TO BE AN ADDITION TO THE CALIFORNIA BUILDING CODE (CBC) <br />NOTICE TO CONTRACTOR <br />1.ALL WORK SHALL COMPLY WITH THE CRC/CBC 2022 AND LATEST EDITION OF ALL LOCAL <br />LAWS AND ORDINANCES, INCLUDING ENERGY CONSERVATION REQUIREMENTS BY THE STATE <br />OF CALIFORNIA. <br />2.ALL WORK SHALL BE DONE IN AN APPROVED WORKMANLIKE MANNER. <br />3.CONTRACTOR SHALL VERIFY AND CHECK ALL DIMENSIONS AND ELEVATIONS AT THE PROJECT <br />SITE AND THE OVERALL CORRECTNESS OF THESE DOCUMENTS BY STUDYING THEM THOROUGHLY <br />AND IF THERE ARE ANY QUESTIONS TO CONTACT THE OWNER OR ENGINEER IMMEDIATELY FOR <br />CLARIFICATION PRIOR TO THE BIDDING AND BEFORE THE START CONSTRUCTION. <br />4.DIMENSIONS HAVE PREFERENCE OVER SCALE. <br />5.APPROVALS BY BUILDING INSPECTOR SHALL NOT CONSTITUTE AUTHORITY TO DEVIATE FROM <br />THESE PLANS AND SPECIFICATIONS. <br />6.ALL CONTRACTOR SHALL BE REQUIRED TO MAINTAIN WORKMAN'S COMPENSATION INSURANCE AS <br />PROVIDED BY CALIFORNIA LAW, ALSO PUBLIC LIABILITY AND PROPERTY DAMAGE INSURANCE OF <br />ADEQUATE COVERAGE, FIRE INSURANCE DURING CONSTRUCTION UP TO THE OCCUPANCY PERMIT, <br />LIKEWISE FOR THEFT AND VANDALISM. <br />7.FOR GENERAL AND PLAN LAYOUT, CONSTRUCTION DETAILS, ETC. REFER ONLY TO THE <br />ARCHITECTURAL SHEETS WHICH SHALL TAKE PRECEDENCE OVER ANY OTHER DRAWINGS. UNLESS <br />OTHERWISE NOTED, ALL DIMENSIONS ARE SHOWN AS FOLLOWS: FACE OF WALL AT MASONRY, <br />INDICATED FACE OF STUD, CENTER LINE,GRID LINE, TOP OF CONCRETE SLAB OR FOUNDATION, TOP <br />OF PLYWOOD,ETC. DRAWINGS SHALL NOT BE SCALED TO DETERMINE ANY DIMENSIONS, REFER <br />ONLY TO WRITTEN INFORMATION AND DETAIL DRAWINGS. <br />GENERAL NOTES <br />1.ALL DETAILS, SECTIONS AND NOTES SHOWN ON THE DRAWING ARE INTENDED TO BE TYPICAL <br />AND SHALL APPLY TO SIMILAR SITUATIONS ELSEWHERE UNLESS OTHERWISE NOTED. NOTES <br />AND DETAILS ON DRAWINGS TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL <br />DETAILS. <br />2.IN NO CASE SHALL WORKING DIMENSIONS BE SCALED FROM PLANS, SECTIONS OR DETAILS ON <br />THE STRUCTURAL DRAWINGS. <br />3.SEE ARCHITECTURAL DRAWINGS FOR DOORS, WINDOWS, NON-BEARING INTERIOR AND <br />EXTERIOR WALLS, ELEVATIONS, SLOPES, STAIRS, CURBS, DRAINS, DEPRESSIONS, RAILINGS, <br />WATERPROOFING, FINISHING, ETC. <br />4.ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING <br />DRAWINGS AND/OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE <br />ARCHITECT AND/OR THE STRUCTURAL ENGINEER BEFORE PROCEEDING WITH ANY OF THE <br />WORK INVOLVED. <br />5.ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF THE <br />GOVERNING BUILDING CODE. <br />6.ALL ASST. DESIGNATIONS SHALL BE AS AMENDED TO DATE UNLESS OTHERWISE NOTED. <br />7.REFER TO THE SPECIFICATIONS FOR INFORMATION NOT COVERED BY THESE GENERAL MOTES <br />OR THE STRUCTURAL ENGINEER WHERE APPLICABLE. <br />8.CONTINUOUS (OR SPECIAL) INSPECTION SHALL MEAN INSPECTION DONE CONTINUOUSLY BY A <br />REGISTERED DEPUTY INSPECTOR CURRENTLY LICENSED BY THE CITY OR GOVERNING AGENCY. <br />9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY IN AND AROUND THE JOB SITE <br />AND/OR ADJACENT PROPERTIES. <br />10.SHOP DRAWINGS SHALL BE SUBMITTED TO THE BUILDING DEPARTMENT, ARCHITECT, AND <br />STRUCTURAL ENGINEER PRIOR TO FABRICATION WITH SUFFICIENT TIME FOR REVIEW OF DESIGN <br />INTENT (MIN. OF 10 WORKING DAYS). <br />11.DURING AND AFTER CONSTRUCTION, BUILDER AND/OR OWNER SHALL KEEP LOADS ON <br />STRUCTURE WITHIN THE LIMITS OF DESIGN LOADS. <br />12.THE CONTRACTOR SHALL BE RESPONSIBLE FOR BRACING AND SHORING ALL EXCAVATIONS, <br />TEMPORARY AND EXISTING STRUCTURES, AND PARTIALLY COMPLETED PORTIONS OF THE <br />WORK TO ASSURE THE SAFETY OF ANY PERSON COMING IN CONTACT WITH THE WORK. <br />13.THE CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO ENSURE THE PROPER ALIGNMENT <br />OF THE STRUCTURE AFTER THE INSTALLATION OF ALL STRUCTURAL AND FINISH MATERIALS. <br />14.CONTRACTOR SHALL NOTIFY ADJACENT PROPERTY OWNERS, IN WRITING, OF HIS INTENSION <br />THE START OF WORK SO THAT PROPERTY OWNERS MAY PROTECT THEIR PROPERTY. <br />BASIS OF DESIGN <br />1.SOILS <br />A. SOIL BEARING PRESSURE: 1500 PSF <br />2. LATERAL LOADS <br />A. OCCUPANCY CATEGORY: II <br />B. SEISMIC DESIGN CATEGORY: D <br />C. SEISMIC IMPORTANCE FACTOR: 1.0 <br />D. WIND DESIGN DATA: SPEED - 94 MPH, EXPOSURE - B <br />E. SITE CLASS: D <br />F. MAPPED SPECTRAL RESPONSE ACCELERATIONS SS AND S1: 1.332 AND 0.474 RESPECTIVELY <br />G. SPECTRAL RESPONSE COEFFICIENTS SDS: 1.066 <br />H. SEISMIC RESPONSE COEFFICIENT CS: 0.1640 <br />I. DESIGN BASE SHEAR: 4.98 PSF <br />J. REDUNDANCY FACTOR P: 1.3 <br />K. ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE PROCEDURE <br />L. BASIC SEISMIC FORCE RESISTING SYSTEM: PLYWOOD SHEAR WALLS <br />M RESPONSE MODIFICATION FACTOR: 6.5 <br />3.DESIGN LOADS <br />A. ROOF LOAD: DL=15 PSF, LL=20 PSF <br />B. CEILING LOAD: DL=5 PSF, LL=10 PSF <br />C. FLOOR LOAD: DL=15 PSF, LL=40 PSF <br />FOUNDATION <br />1.FOOTING EXCAVATION SHALL BE CLEAN AND FREE FROM LOOSE DEBRIS, STANDING WATER, <br />OR UNCOMPACTED MATERIAL AT THE TIME OF CONCRETE PLACEMENT. <br />2.IF PROBLEMS ARE ENCOUNTERED IN THE FIELD AND NO SOIL REPORT EXIST, OWNER SHALL <br />BE RESPONSIBLE FOR OBTAINING SOIL REPORT. <br />3.WATER PROOFING AS MAY BE REQUIRED AT SOIL FACE OF WALL BELOW GRADE SHALL BE <br />BY OTHERS. <br />4.TRENCHES AND EXCAVATIONS UNDER OR ADJACENT TO FOUNDATIONS SHALL BE PROPERLY <br />BACKFILLED AND COMPACTED. <br />5.PROVIDE A WEEP SCREED FOR STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM 8" <br />ABOVE THE EARTH OR 2" ABOVE PAVED AREAS. <br />6.ALL CONTINUOUS FOOTINGS TO HAVE 5/8"DIA. x MIN. 12" ANCHOR BOLTS, MIN. 7" EMBEDMENT <br />INTO CONCRETE FOOTING AT 72" O.C. UNLESS NOTED OTHERWISE ON PLANS. ONE ANCHOR <br />BOLT SHOULD BE LOCATED MAX. 12"AWAY AND MIN. 9 1/2" FROM THE END OF THE SILL <br />PLATES. MIN. (2) A.B. PER SILL PLATE/SHEAR PANEL. SILL PLATE UNDER SHEAR WALLS OF <br />UP TO 4'-0" IN LENGTH MUST BE CONTINUOUS. <br />7.ANCHOR BOLTS AT SHEAR WALLS SHALL BE INSTALLED WITH PLATE WASHERS OF MIN. 3" <br />SQ. x 0.229" THICK BETWEEN SILL PLATE AND NUT. EDGE(S) OF PLATE WASHERS SHALL BE <br />1/2" MAX. FROM INSIDE FACE OF SHEAR PANEL(S). <br />8.FOUNDATION SILLS SHALL BE NATURALLY DURABLE OR PRESERVATIVE-TREATED WOOD. <br />9.THE HOLE IN THE PLATE WASHER IS PERMITTED TO BE DIAGONALLY SLOTTED WITH A WIDTH <br />OF UP TO 3/16 INCH LARGER THAN THE BOLT DIAMETER AND A SLOT LENGTH NOT TO <br />EXCEED 1 3/4 INCHES, PROVIDED A STANDARD CUT WASHER IS PLACED BETWEEN THE PLATE <br />WASHER AND THE NUT. <br />10.FASTENERS IN PRESERVATIVE TREATED WOOD OR FIRE RETARDANT WOOD SHALL BE OF HOT <br />DIPPED ZINC COATED GALVANIZED STEEL OR STAINLESS STEEL. <br />11.FOR INTERIOR NON-SHEAR WALLS USE SIMPSON PHNW SERIES 0. 145Ø PINS WITH A <br />PENETRATION OF 1 1/4" INTO SLAB AT 16" O.C. TO BE INSTALLED IN ACCORDANCE WITH ICC <br />ESR-2138. ACTUAL SLAB THICKNESS TO BE MINIMUM 4". ALL INTERIOR SHEAR WALLS TO <br />HAVE A.B. PER FOUNDATION PLAN. <br />12.ALL HOLDOWNS AND POST ANCHORS TO BE INSTALLED ACCORDING TO MOST CURRENT <br />SIMPSON STRONG TIE SPECIFICATIONS AND REQUIREMENTS OF ICC-ER REPORTS & SHALL BE <br />TIED IN PLACE PRIOR TO FOUNDATION INSPECTION. DIMENSIONS ARE NOT FURNISHED TO <br />SIMPSON HOLDOWNS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR'S SUPERINTENDENT, <br />THE FRAMING CONTRACTOR AND THE CONCRETE CONTRACTOR TO LOCATE THESE ANCHORS IN <br />THE EXACT LOCATION. REFER TO DETAILS FOR PROPER INSTALLATION. <br />13.PLACEMENT SHALL BE IN ONE CONTINUOUS OPERATION UNLESS OTHERWISE SPECIFIED. SLAB <br />SURFACE SHALL BE CURED WITH 'HUNTS' COMPOUND OR EQUAL OR CURED WITH OTHER <br />METHODS IN ACCORDANCE WITH GOOD CONSTRUCTION PRACTICE AT CONTRACTOR'S OPTION. <br />14.CONTRACTOR SHALL DAMPEN SLAB UNDERLAYMENT OF SAND/MEMBRANE JUST PRIOR TO <br />CONCRETE PLACEMENT TO ASSIST UNIFORM CONCRETE CURING. SLABS MUST NOT BE POURED <br />DURING OR IMMEDIATELY AFTER RAINSTORMS. THE SPECIFIED SAND OVER VISQUEEN SHOULD <br />NOT BE SATURATED AT THE TIME OF THE CONCRETE POUR.ANY FREE WATER TRAPPED IN <br />THE SAND LAYER MUST BE REMOVED PRIOR TO THE CONCRETE POUR. <br />15.THE BOTTOMS OF FOOTING EXCAVATIONS SHALL BE LEVEL, CLEAN AND FREE OF LOOSE <br />MATERIAL OR WATER WHEN CONCRETE IS PLACED. OVER EXCAVATION SHALL BE FILLED WITH <br />CONCRETE OR PROPERLY COMPACTED FILL THAT HAS BEEN TESTED AND APPROVED BY THE <br />SOILS ENGINEER. BACKFILL SHALL NOT BE PLACED UNTIL SUPPORTING FOUNDATIONS, WALLS <br />AND SLAB HAVE ATTAINED SUFFICIENT STRENGTH TO SUPPORT LATERAL SOIL PRESSURE. <br />16.FLOOR SLAB SHALL BE POURED LEVEL TO 1/8" IN 10'. <br />17.FINISH GRADE AROUND THE PERIMETER OF SLAB SHALL BE CONSTRUCTED SUCH THAT RAIN <br />AND IRRIGATION WATER IS DRAINED AWAY FROM THE SLAB. <br />18.FOUNDATION DRAWINGS PREPARED BY E.O.R. REFLECT THE STRUCTURAL REQUIREMENTS. <br />REFER TO ARCHITECTURAL PLANS FOR DIMENSIONS, DEPRESSIONS, SLOPE, SHELVES, PATIOS, <br />STOOPS AND PORCHES NOT SHOWN IN FOUNDATION DRAWINGS. ACCURACY OF THE <br />DIMENSIONS AND FINAL FIT OF THE BUILDING SHALL BE REVIEWED BY THE ARCHITECT AND <br />THE CONTRACTOR PRIOR TO CONSTRUCTION. <br />19.WAITING PERIOD FOR CONCRETE SLABS-ON-GRADE PRIOR TO START OF CONSTRUCTION IS AS <br />FOLLOWS: <br />a. DO NOT WALK ON SLAB UNTIL 24 HOURS AFTER CONCRETE HAS BEEN POURED. <br />b. BEGIN WALL FRAMING 4-5 DAYS AFTER CONCRETE POURED. <br />c. BEGIN ROOF/FLOOR FRAMING 7-10 DAYS AFTER CONCRETE POURED. <br />d. DO NOT LOAD ROOF PRIOR TO 14 DAYS AFTER CONCRETE POURED. <br />20.NO PIPES OR CONDUITS SHALL EXTEND UNDER ISOLATED COLUMN FOOTING OR UNDER <br />CONTINUOUS WALL FOOTINGS UNLESS SPECIFICALLY DETAILED OR APPROVED BY THE <br />ARCHITECT, STRUCTURAL ENGINEER AND THE BUILDING OFFICIAL. <br />21.DEPUTY INSPECTION IS REQUIRED FOR SIMPSON SET-XP EPOXY. <br />CONCRETE <br />1.CEMENT SHALL CONFORM TO A.S.T.M. C150, TYPE II. (U.N.O.) <br />2.HARD ROCK AGGREGATE SHALL CONFORM TO A.S.T.M. C33. THEIR MAX. SIZE SHALL BE 1 INCH FOR <br />FOOTINGS, CAISSONS AND GRADE BEAMS AND I INCH FOR ALL OTHER WORK. PEA GRAVEL SHALL NOT <br />BE USED WITHOUT WRITTEN PERMISSION OF ENGINEER. <br />3.LIGHTWEIGHT AGGREGATES (CONFORM TO A.S.T.M. C330) SHALL BE APPROVED AND THEIR MAX. SIZE <br />SHALL BE 1/2 INCH. <br />4.CONCRETE COVER OVER REINFORCING SHALL BE AS FOLLOWS: (U.N.O.) <br />5.ALL REINFORCING SHOWN CONTINUOUS SHALL BE LAPPED PER DETAIL HEREON AT SPLICES AND <br />SHALL BE MADE AWAY FROM POINTS OF MAXIMUM STRESS. MIN. LAP SHALL BE 24"LONG. <br />6.ALL REINFORCING STEEL, DOWELS AND ANCHOR BOLTS AND OTHER INSERTS SHALL BE SECURED IN <br />POSITION PRIOR TO POURING CONCRETE. <br />7.CONTINUOUS INSPECTION IS REQUIRED FOR ALL CONCRETE IN EXCESS OF 2,500 PSI.(U.N.O.) <br />8.BEFORE CONCRETE IS POURED, CHECK WITH ALL TRADES TO INSURE PROPER PLACEMENT OF ALL <br />OPENINGS, SLEEVES, CURBS, CONDUITS, BOLTS, INSERTS, ETC. RELATING TO WORK. <br />9.ONLY ONE KIND OF CONCRETE SHALL BE POURED ON THE JOB AT ONE TIME. <br />10.ALL SLEEVES NOT SPECIFICALLY SHOWN ON THE DRAWINGS SHALL BE LOCATED BY THE TRADES <br />INVOLVED AND SHALL BE APPROVED BY THE ENGINEER. <br />11. DRYPACK CONCRETE SHALL BE ONE PART PORTLAND CEMENT AND ONE PART SAND WITH SUFFICIENT <br />WATER TO ALLOW A SMALL AMOUNT OF PASTE TO COME TO THE SURFACE. <br />12.CONCRETE GROUT SHALL BE NON-SHRINKING WITH SUFFICIENT WATER TO ALLOW POURING ULTIMATE <br />COMPRESSIVE STRENGTH (F'c) AT 28 DAYS SHALL EQUAL 2,000 PSI. <br />13.MIX THAT PRODUCES LOWEST SLUMP COMPATIBLE WITH PROPER PLACEMENT SHALL BE USED. THE <br />MAX. CONCRETE SLUMP SHALL BE 3 INCHES PLUS OR MINUS 1 INCH FOR SLABS ON GRADE AND 4 <br />INCHES PLUS OR MINUS 1 INCH FOR ALL OTHER WORK. <br />14.LOCATION OF CONSTRUCTION OR POUR JOINTS MUST BE APPROVED BY THE STRUCTURAL ENGINEER IF <br />OTHER THAN SHOWN ON THE PLANS. <br />15.NO PIPES OR DUCTS EXCEEDING ONE THIRD THE SLAB OR WALL - THICKNESS SHALL BE PLACED IN <br />STRUCTURAL CONCRETE UNLESS SPECIFICALLY DETAILED. SEE THE MECHANICAL AND/OR ELECTRICAL <br />DRAWINGS FOR LOCATION OF SLEEVES THROUGH WALLS AND FLOORS. <br />16.REFER TO ARCHITECTURAL DRAWINGS FOR MOLDS, GROOVES, ORNAMENTS, CLIPS, OR GROUND <br />REQUIRED TO BE CAST IN CONCRETE, AND SLAB DEPRESSIONS. <br />17.REMOVAL OF FORMS: SUPPORTING VERTICAL SURFACES-MINIMUM 2 DAYS; SUPPORTING HORIZONTAL <br />SURFACES-MINIMUM 14 DAYS (U.N.O.). <br />18. MAXIMUM WEIGHT OF LIGHTWEIGHT CONCRETE SHALL NOT EXCEED 110 PCF. <br />CONDITION CONCRETE F'c @ <br /> 28 DAYS, PSI <br />STEEL REINFORCEMENT <br />Fy (YIELD), PSI CONTINUOUS INSPECTION REQUIRED <br />CONTINUOUS FOOTING 2,500 40,000 NO <br />ISOLATED PADS 2,500 40,000 NO <br />GRADE BEAM 3,000 60,000 YES <br />PILES 3,000 60,000 YES <br />NOTE: A HIGHER GRADE OF CONCRETE MAY BE SUBSTITUTED FOR THOSE SHOWN ABOVE, BUT <br />WILL BE SUBJECT TO THE CODE REQUIREMENTS OF HIGHER GRADE. <br />POURED AGAINST EARTH - - - - - - - - - - - - - - - - -3 INCH CLEAR <br />EXPOSED TO EARTH, BUT POURED AGAINST FORMS- - - - -2 INCH CLEAR <br />MAIN BARS IN COLUMNS AND BEAMS - - - - - - - - - - -2 INCH CLEAR <br />STRUCTURAL SLAB - - - - - - - - - - - - - - - - - - - 1 INCH CLEAR <br />WALLS - - - - - - - - - - - - - - - - - - - - - - - - - 1 1/2 INCH CLEAR <br />SLABS ON GRADE - - - - - - - - - - - - - - - - - - - - AT CENTER <br />STRUCTURAL WOOD <br />1.ALL STRUCTURAL LUMBER SHALL BE DOUGLAS FIR UNLESS NOTED OTHERWISE AND CONFORM TO <br />GRADING RULES OF THE WESTERN WOOD PRODUCTS ASSOCIATION (U.N.O.). <br />2.ALL PLYWOOD SHALL CONFORM TO P,S.1-95 AND SHALL BE GRADED,INDEX NUMBER AND <br />THICKNESS CALLED ON PLANS. ALL PLYWOOD DIRECTLY EXPOSED TO THE WEATHER SHALL <br />BE EXTERIOR TYPE. <br />3.STRUCTURAL PLYWOOD SHALL BE GRADED PER A.P.A. AND SHALL BE INTERIOR TYPE <br />SHEATHING C-D GRADE WITH EXTERIOR GLUE. ALL HORIZONTAL PLYWOOD SHALL BE LAID <br />WITH FACE GRAIN PERPENDICULAR TO JOISTS AND WITH STAGGERED JOINTS. NO <br />STRUCTURAL PLYWOOD SHALL BE COVERED OVER UNTIL AN INSPECTION HAS BEEN MADE <br />AND NAILING APPROVED. <br />4.MINIMUM DIMENSIONS OF ANY PLYWOOD SHALL BE 18" AND A MINIMUM AREA 6 SF. <br />5.CUTTING AND BORING OF WOOD STUDS: EXTERIOR WALL AND BEARING WALL STUDS MAY BE <br />NOTCHED TO MAX. OF 25% OF STUD DEPTH. NON-BEARING STUDS MAY BE NOTCHED TO MAX. 40% OF <br />STUD DEPTH. A HOLE NOT GREATER THAN 40% OF THE STUD DEPTH MAY BE BORED IN ANY STUD <br />AND 60% - IN NON-BEARING STUD. IN NO CASE SHALL THE EDGE OF BORED HOLE BE NEARER THAN <br />5/8"TO THE EDGE OF STUD. BORED HOLE SHALL NOT BE LOCATED AT THE SAME SECTION OF THE <br />STUD AS CUT OR NOTCH. <br />6.ALL LUMBER IN CONTACT WITH MASONRY OR CONCRETE SHALL BE PRESSURED TREATED PER IBC STD <br />7.WHERE PLUMBING, HEATING OR OTHER PIPES NECESSITATE THE CUTTING OF SOLES OR PLATES. THE <br />CUT HOLES OR PLATES SHALL BE TIED BACK BY SIMPSON STRONG TIE ST22. <br />8.ALL NAILS SHALL BE COMMON AND NAILING SHALL CONFORM TO THE APPLICABLE BUILDING CODE <br />9.ALL STUD WALLS SHALL HAVE FIRE BLOCKING AT 8-0" O.C. MAX. <br />10.FASTENERS IN CONTACT WITH PRESERVATIVE TREATED LUMBER AND FIRE RETARDANT TREATED <br />WOOD SHALL BE OF HOT-DIPPED ZINC-COATED GALVANIZED STEEL, STAINLESS STEEL, SILICON <br />BRONZE OR COPPER <br />11.TOP PLATES OF ALL WOOD STUD WALLS TO CONSIST OF (2) 2x THE SAME WIDTH AS THE STUD <br />U.N.O. TOP PLATE SHALL LAP A MIN. 48" AND BE SPLICED WITH NOT LESS THEN (6) 16d NAILS <br />SPACED NOT MORE THAN 12" O.C. <br />12.PROVIDE POST/ MULTIPLE STUDS AT LOWER FLOOR UNDER POST/ MULTIPLE STUDS ABOVE <br />13.ALL JOIST HANGERS SHALL BE SIMPSON LUS-TYPE HANGER, ALL BEAM HANGERS SHALL BE SIMPSON <br />HUS-TYPE HANGER U.N.O. ON PLAN OR DETAIL. FOLLOW MANUFACTURER RECOMMENDATION FOR <br />INSTALLATION. <br />14.USE THIS SPAN TABLE FOR STUD SPACING, U.N.O.: <br />15.USE THIS SPAN TABLE FOR ROOF RAFTERS, U.N.O.: <br />16.USE THIS SPAN TABLE FOR CEILING JOISTS, U.N.O.: <br />17.USE THIS TABLE FOR FLOOR JOISTS, U.N.O.: <br />2x ROOF RAFTERS - - - - - - - - - - - - - - - - - - - - GRADE #2 <br />2x FLOOR JOISTS - - - - - - - - - - - - - - - - - - - - GRADE #2 <br />4x BEAMS, POSTS AND HEADERS - - - - - - - - - - - - -GRADE #1 <br />6x BEAMS, LEDGERS AND POSTS - - - - - - - - - - - - -GRADE #1 <br />STUDS AND PLATES STANDARD GRADING MIN. <br /> BEARING TO 8 FT. - - - - - - - - - - - - - - - - - - -2x4 GRADE STUD <br /> FROM 8 FT. TO 14 FT. - - - - - - - - - - - - - - - - -2x6 GRADE #1 <br /> FROM 14 FT. TO 20 FT. - - - - - - - - - - - - - - - - 2x8 GRADE #1 <br /> NON-BEARING TO 10 FT. - - - - - - - - - - - - - - - -2x4 GRADE STUD <br /> FROM 10 FT. TO 20 FT. - - - - - - - - - - - - - - - - SAME AS BEARING <br />SILL PLATES (P.T.D.F.) - - - - - - - - - - - - - - - - - - GRADE STUD OR CONST <br />BLOCKING, TOP AND BOTTOM PLATES - - - - - - - - - - -GRADE STUD OR CONST <br />SIZE, HEIGHT AND SPACING OF WOOD STUDS, CRC TABLE R602.3(5) <br />BEARING WALLS NON-BEARING WALLS <br />STUD <br />SIZE <br />STUD <br />HEIGHT <br />MAXIMUM SPACING WHEN SUPPORTING STUD <br />HEIGHT <br />MAXIMUM <br />SPACINGROOF & <br />CLN'G ONLY <br />ONE FLOOR, <br />ROOF & CLN'G <br />TWO FLOORS, <br />ROOF & CLN'G <br />ONE FLOOR <br />ONLY <br />2x4 10 24" 16" --- 24" 14' 24" <br />3x4 10 24" 24" 16" 24" 14' 24" <br />2x6 10 24" 24" 16" 24" 20' 24" <br />*NO MULTIPLES OF 2x4 ARE ALLOWED TO SPAN MORE THAN 14'. <br />BEARING WALLS EXCEEDING 10' MUST BE DESIGNED CASE BY CASE <br />RAFTER SPANS, CRC TABLE R802.4.1.(2) <br />SIZE SPACING ALLOWABLE <br />SPAN SIZE SPACING ALLOWABLE <br />SPAN <br />A. DEAD LOAD=20 PSF <br />B. LIVE LOAD=20 PSF <br />C. TOTAL DEFLECTION=L/240 <br />D. USE DOUGLAS FIR LARCH #2 <br />2x6 <br />24"10'-4" <br />2x10 <br />24" 15'-11" <br />16" 12'-7"16" 19'-6" <br />12" 14'-7"12" 22'-6" <br />2x8 <br />24" 13'-0" <br />2x12 <br />24" 18'-6" <br />16" 16'-0"16" 22'-7" <br />12" 18'-5"12" 26'-0" <br />CEILING JOIST SPANS, CRC TABLE R802.5.1.(1) <br />SIZE SPACING ALLOWABLE <br />SPAN SIZE SPACING ALLOWABLE <br />SPAN <br />A. DEAD LOAD=5 PSF <br />B. LIVE LOAD=10 PSF <br />C. TOTAL DEFLECTION=L/240 <br />D. USE DOUGLAS FIR LARCH #2 <br />2x6 <br />24"15'-0" <br />2x10 <br />24" 23'-3" <br />16" 17'-8"16" EXCEEDS 26' <br />12" 19'-6"12" EXCEEDS 26' <br />2x8 <br />24" 19'-1" <br />2x12 <br />24" EXCEEDS 26' <br />16" 23'-4"16" EXCEEDS 26' <br />12" 25'-8"12" EXCEEDS 26' <br />FLOOR JOIST SPANS, CRC TABLE R502.3.1.(2) <br />SIZE SPACING ALLOWABLE <br />SPAN SIZE SPACING ALLOWABLE <br />SPAN <br />A. DEAD LOAD=20 PSF <br />B. LIVE LOAD=40 PSF <br />C. TOTAL DEFLECTION=L/360 <br />D. USE DOUGLAS FIR LARCH #2 <br />2x6 <br />24"7'-6" <br />2x10 <br />24" 11'-8" <br />16" 9'-3"16" 14'-3" <br />12" 10'-8"12" 16'-5" <br />2x8 <br />24" 9'6" <br />2x12 <br />24" 13'-6" <br />16" 11'-8"16" 16'-6" <br />12" 13'-6"12" 19'-1" <br />SHEAR WALL <br />1.ALL GYPSUM WALL BOARD AND STUCCO SHEAR WALLS SHALL HAVE NAILING PROVIDED AT TOP AND <br />BOTTOM PLATES, ALL STUDS AND BLOCKING. <br />2.BLOCK ALL EDGES OF WOOD SHEATHED SHEAR WALLS. <br />3.SHEAR WALL PLATES AND STUDS SHALL NOT HAVE HOLES LARGER THAN 1" DIAMETER WITHOUT <br />THE APPROVAL OF THE STRUCTURAL ENGINEER. SHEAR WALL PLATES AND STUDS SHALL NOT HAVE <br />ANY NOTCHES WITHOUT THE APPROVAL OF THE STRUCTURAL ENGINEER. <br />4.PROVIDE MULTIPLE STUDS FOR SOLID BEARING AT ENDS OF MISCELLANEOUS BEAMS WHERE POSTS <br />ARE NOT SHOWN. CARRY STUDS DOWN TO FOUNDATION OR SLAB. <br />5.MIN. SPLICE NAILING OF DOUBLE PLATES SHALL BE (12) 16d NAILS U.N.O <br />6.AT PLYWOOD SHEAR WALLS, PLYWOOD TO EXTEND ABOVE AND BELOW AND SIDES OF ALL <br />OPENINGS. <br />7.PLYWOOD AT SHEAR WALLS TO BE CONTINUOUS AT WALL AND DOOR JAMB INTERSECTION. <br />8.MINIMUM DIMENSIONS OF ANY PLYWOOD SHALL BE 18" AND A MINIMUM AREA 6 SF. <br />9.SHEATHING PANEL JOINT AND SILL PLATE NAILING SHALL BE STAGGERED IN ALL CASES. <br />10.NAILING AT 6" O.C. WHEN STUDS ARE SPACES AT 24" O.C. <br />11. SPACING OF A35/ LTP4, 16d NAILS, SDS SCREWS, AND ANCHOR BOLTS IS TO BE REDUCED BY 1/2, IF <br />PLYWOOD SHEATHING OCCURS ON BOTH SIDES OF WALL. <br />12.NAIL SPACING W/ LESS THAN 4" O.C. SHALL HOVE A PRE-DRILLED HOLE, WHEN USED, WHICH CAN <br />NOT EXCEED 75% OF THE NAIL DIAMETER (BUT SHOULD BE AS CLOSE TO 75% AS POSSIBLE). <br />UNSEASONED LUMBER IS ASSUMED TO BE USED. <br />13.ONLY COMMON NAILS WILL BE USED FOR ALL PLYWOOD SHEAR WALLS AND NAIL GUNS USING <br />"CLIPPED HEAD” OR "SINKER" NAILS ARE NOT ACCEPTABLE. <br />14.ALL BOLT HOLES TO BE DRILLED 1/32" MIN. TO 1/16" MAX. OVERSIZED. INSPECTOR MUST VERIFY. <br />15.ALL SHEAR WALLS WITH A SHEAR VALUE GREATER THAN 300 LB/FT SHOULD BE PROVIDED: <br />a) 3x FOUNDATION SILL PLATES <br />b) 3x STUDS AND BLOCKS BETWEEN ADJACENT PANELS <br />c) 1/2" EDGE DISTANCE FOR PLYWOOD BOUNDARY NAILING <br />d) ALL PANEL JOINT AND SILL PLATE NAILING SHALL BE STAGGERED. <br />e) STAGGER NAILS IF NAIL SPACING IS LESS THAN 2" O.C. <br />f) SQUARE PLATE WASHERS SHALL BE USED WITH ANCHOR BOLTS <br /> 5/8" ∅ BOLT - 3"x3"x1/4" <br /> 3/4" ∅ BOLT - 3"x3"x5/16" <br /> 7/8" ∅ BOLT - 3"x3"x5/16" <br /> 1" ∅ BOLT - 3.5"x3.5"x3/8" <br />SHEAR WALL SCHEDULE <br />TYPE SHEATHING <br />MATERIAL <br /> PANEL NAILING <br />PERIMETER FIELD <br />BLKG. TO <br />PLATE <br />CONNECTION <br />PLATE TO <br />BLKG. <br />CONNECTION <br />ANCHOR <br />BOLTS <br />(U.N.O.) <br />EMBED. <br />DEPTH <br />SHEAR, <br />PLF <br />(LRFD) <br />SHEAR, <br />PLF <br />(ASD) <br />SILL <br />PLATE <br />1 15/32" PLYWOOD <br />STRUCTURAL 1 <br />10d @ <br />6" O.C. <br />10d @ <br />12" O.C. <br />A35/ LTP4 <br />@ 20" O.C. <br />20d NAILS <br />@ 6" O.C. <br />5/8"∅ @ <br />48" O.C.9" 392 245 2x <br />2 15/32" PLYWOOD <br />STRUCTURAL 1 <br />10d @ <br />6" O.C. <br />10d @ <br />12" O.C. <br />A35/ LTP4 <br />@ 16" O.C. <br />20d NAILS <br />@ 4" O.C. <br />5/8"∅ @ <br />32" O.C.9" 544 340 3x <br />3 15/32" PLYWOOD <br />STRUCTURAL 1 <br />10d @ <br />4" O.C. <br />10d @ <br />12" O.C. <br />A35/ LTP4 <br />@ 10" O.C. <br />SDS 1/4"x6" <br />@ 8" O.C. <br />5/8"∅ <br />@24" O.C.9" 816 510 3x <br />4 15/32" PLYWOOD <br />STRUCTURAL 1 <br />10d @ <br />3" O.C. <br />10d @ <br />12" O.C. <br />A35/ LTP4 <br />@ 8" O.C. <br />SDS 1/4"x6" <br />@ 5" O.C. <br />5/8"∅ @ <br />24" O.C.9" 1064 665 3x <br />5 15/32" PLYWOOD <br />STRUCTURAL 1 <br />10d @ <br />2" O.C. <br />10d @ <br />12" O.C. <br />A35/ LTP4 <br />@ 6" O.C. <br />SDS 1/4"x6" <br />@ 4" O.C. <br />5/8"∅ @ <br />16" O.C.9" 1392 870 3x <br />GENERAL NOTES FOR STRUCTURAL OBSERVATION <br />1. (1) STRUCTURAL OBSERVATION IS REQUIRED FOR THE STRUCTURAL SYSTEM IN ACCORDANCE <br />WITH THE INFORMATION BULLETIN NO. P/BC 2017-024. STRUCTURAL OBSERVATION IS THE <br />VISUAL OBSERVATION AT THE CONSTRUCTION SITE OF THE ELEMENTS AND CONNECTIONS OF <br />THE STRUCTURAL SYSTEM AT SIGNIFICANT CONSTRUCTION STAGES, AND THE COMPLETE <br />STRUCTURE FOR GENERAL CONFORMANCE TO THE APPROVED PLANS AND SPECIFICATIONS. <br />STRUCTURAL OBSERVATION DOES NOT WAIVE THE RESPONSIBILITY FOR THE INSPECTIONS <br />REQUIRED OF THE BUILDING INSPECTOR OR THE DEPUTY INSPECTOR. <br />2. THE OWNER SHALL EMPLOY A STATE OF CALIFORNIA REGISTERED CIVIL OR STRUCTURAL <br />ENGINEER OR LICENSED ARCHITECT TO PERFORM THE STRUCTURAL OBSERVATION. THE LOS <br />ANGELES DEPARTMENT OF BUILDING AND SAFETY (LADBS) REQUIRES THE USE OF THE <br />ENGINEER OR ARCHITECT, OR HIS/HER DESIGNEE RESPONSIBLE FOR THE STRUCTURAL DESIGN <br />WHO ARE INDEPENDENT OF THE CONTRACTOR. <br />3. THE STRUCTURAL OBSERVER SHALL PROVIDE EVIDENCE OF EMPLOYMENT BY THE OWNER OR <br />THE OWNER’S REPRESENTATIVE. A LETTER FROM THE OWNER, THE OWNER’S <br />REPRESENTATIVE, OR A COPY OF THE AGREEMENT FOR SERVICES SHALL BE SENT TO THE <br />BUILDING INSPECTOR BEFORE THE FIRST SITE VISIT. <br />4. THE OWNER OR OWNER'S REPRESENTATIVE SHALL COORDINATE AND CALL FOR A MEETING <br />BETWEEN THE ENGINEER OR ARCHITECT RESPONSIBLE FOR THE STRUCTURAL DESIGN, <br />STRUCTURAL OBSERVER, CONTRACTOR, AFFECTED SUBCONTRACTORS AND DEPUTY <br />INSPECTORS. THE PURPOSE OF THE MEETING SHALL BE TO IDENTIFY THE MAJOR <br />STRUCTURAL ELEMENTS AND CONNECTIONS THAT AFFECT THE VERTICAL AND LATERAL LOAD <br />SYSTEMS OF THE STRUCTURE AND TO REVIEW SCHEDULING OF THE REQUIRED <br />OBSERVATIONS. A RECORD OF THE MEETING SHALL BE INCLUDED IN THE FIRST OBSERVATION <br />REPORT SUBMITTED TO THE BUILDING INSPECTOR. <br />5. THE STRUCTURAL OBSERVER SHALL PERFORM SITE VISITS AT THOSE STEPS IN THE <br />PROGRESS OF THE WORK THAT ALLOW FOR CORRECTION OF DEFICIENCIES WITHOUT <br />SUBSTANTIAL EFFORT OR UNCOVERING OF THE WORK INVOLVED. AT A MINIMUM, THE LISTED <br />SIGNIFICANT CONSTRUCTION STAGES ON EITHER THE “STRUCTURAL <br />OBSERVATION/SIGNIFICANT CONSTRUCTION STAGES” FORM OR THE “STRUCTURAL <br />OBSERVATION PROGRAM AND DESIGNATION OF THE STRUCTURAL OBSERVER” FORM <br />IN/FORM.08 (PART 2) REQUIRE A SITE VISIT AND AN OBSERVATION REPORT FROM THE <br />STRUCTURAL OBSERVER. <br />6. THE STRUCTURAL OBSERVER SHALL PREPARE A REPORT OF THE “STRUCTURAL <br />OBSERVATION REPORT FORM” IN/FORM.08 (PART 1) FOR EACH SIGNIFICANT STAGE OF <br />CONSTRUCTION OBSERVED. THE ORIGINAL OF THE STRUCTURAL OBSERVATION REPORT SHALL <br />BE SENT TO THE BUILDING INSPECTOR'S OFFICE AND SHALL BE SIGNED AND SEALED (WET <br />STAMP) BY THE RESPONSIBLE STRUCTURAL OBSERVER. ONE COPY OF THE OBSERVATION <br />REPORT SHALL BE ATTACHED TO THE APPROVED PLANS. THE COPY ATTACHED TO THE <br />PLANS SHALL BE SIGNED AND SEALED (WET STAMP) BY THE RESPONSIBLE STRUCTURAL <br />OBSERVER OR THEIR DESIGNEE. COPIES OF THE REPORT SHALL ALSO BE GIVEN TO THE <br />OWNER, CONTRACTOR, AND DEPUTY INSPECTOR. ANY DEFICIENCY NOTED ON THE <br />OBSERVATION REPORT WILL BECOME THE RESPONSIBILITY OF THE STRUCTURAL ENGINEER OR <br />ARCHITECT OF RECORD TO VERIFY ITS COMPLETION BY THE STRUCTURAL OBSERVER. <br />7. A FINAL OBSERVATION REPORT MUST BE SUBMITTED WHICH SHOWS THAT ALL OBSERVED <br />DEFICIENCIES WERE RESOLVED AND STRUCTURAL SYSTEM GENERALLY CONFORMS WITH THE <br />APPROVED PLANS AND SPECIFICATIONS. THE LOS ANGELES DEPARTMENT OF BUILDING AND <br />SAFETY (LADBS) WILL NOT ACCEPT THE STRUCTURAL WORK WITHOUT THE FINAL <br />OBSERVATION REPORT AND THE CORRECTION OF SPECIFIC DEFICIENCIES NOTED DURING <br />NORMAL BUILDING INSPECTION. <br />8. THE STRUCTURAL OBSERVER SHALL PROVIDE THE ORIGINAL STAMPED AND SIGNED <br />“STRUCTURAL OBSERVATION REPORT FORM” TO THE CITY OF LOS ANGELES DEPARTMENT OF <br />BUILDING AND SAFETY BUILDING INSPECTOR. <br />9. WHEN THERE IS A NEED TO REPLACE THE STRUCTURAL OBSERVER OF RECORD, THE OWNER <br />SHALL: <br />A) NOTIFY THE BUILDING INSPECTOR IN WRITING BEFORE THE NEXT INSPECTION BY <br />SUBMITTING COMPLETED “STRUCTURAL OBSERVATION PROGRAM AND DESIGNATION OF THE <br />STRUCTURAL OBSERVER” FORM IN/FORM.08 (PART 2). <br />B) CALL AN ADDITIONAL PRECONSTRUCTION MEETING, AND <br />C) FURNISH THE REPLACEMENT STRUCTURAL OBSERVER WITH A COPY OF ALL PREVIOUS <br />OBSERVATION REPORTS. <br />D) THE NEW STRUCTURAL OBSERVER MUST BE DESIGNATED BY THE ENGINEER OR ARCHITECT <br />OF RECORD. <br />THE REPLACEMENT STRUCTURAL OBSERVER SHALL APPROVE THE CORRECTION OF THE <br />ORIGINAL OBSERVED DEFICIENCIES UNLESS OTHERWISE APPROVED BY PLAN CHECK <br />SUPERVISION. THE POLICY OF THE DEPARTMENT SHALL BE TO CORRECT ANY PROPERLY <br />NOTED DEFICIENCIES WITHOUT CONSIDERATION OF THEIR SOURCE. <br />10.THE ENGINEER OR ARCHITECT OF RECORD SHALL DEVELOP ALL CHANGES RELATING TO THE <br />STRUCTURAL SYSTEMS. THE <br />11. BUILDING DEPARTMENT SHALL REVIEW AND APPROVE ALL CHANGES TO THE APPROVED <br />PLANS AND SPECIFICATIONS. <br />NAILING SCHEDULE <br />CONNECTION NAILINGa <br />1. JOIST TO SILL OR GIRDER, TOE NAIL 3-8d <br />2. BRIDGING TO JOIST, TOE NAIL EACH END 2-8d <br />3. 1" x 6”(25 mm x 125 mm) SUBFLOOR TO EACH JOIST, FACE NAIL 2-8d <br />4. WIDER THAN 1" x 6" (25 mm x 152 mm) SUBFLOOR TO EACH JOIST, FACE NAIL 3-8d <br />5. 2" (51 mm) SUBFLOOR TO JOIST OR GIRDER, BLIND AND FACE NAIL 2-16d <br />6. SOLE PLATE TO JOIST OR BLOCKING, TYPICAL FACE NAIL 16d AT 16" (406 mm) O.C. <br />SOLE PLATE TO JOIST OR BLOCKING. AT BRACED WALL PANELS 3-16d PER 16" (406 mm) <br />7. TOP PLATE TO STUD, END NAIL 2-16d <br />8. STUD TO SOLE PLATE 4-8d, TOENAIL OR 2-16d, END NAIL <br />9. DOUBLE STUDS, FACE NAIL 16d AT 24" (610 mm) O.C. <br />10. DOUBLE TOP PLATES, TYPICAL FACE NAIL 15d AT 16" (405 mm) O.C. <br />DOUBLE TOP PLATES, LAP SPLICE 8-16d <br />11. BLOCKING BETWEEN JOISTS OR RAFTERS TO TOP PLATE, TOE NAIL 3-8d <br />12. RIM JOIST TO TOP PLATE, TOE NAIL 8d AT 6 " (152 mm) O.C. <br />13. TOP PLATES, LAPS AND INTERSECTIONS, FACE NAIL 2-16d <br />14. CONTINUOUS HEADER, TWO PIECES 16d AT 16" (406 mm) O.C. ALONG EACH EDGE <br />15. CEILING JOIST TO PLATE, TOE NAIL 3-8d <br />16. CONTINUOUS HEADER TO STUD, TOE NAIL 4-8d <br />17. CEILING JOISTS, LAPS OVER PARTITIONS, FACE NAIL 3-16d <br />18. CEILING JOISTS TO PARALLEL RAFTERS, FACE NAIL 3-16d <br />19. RAFTER TO PLATE, TOE NAIL 3-8d <br />20. 1" (25 mm) BRACE TO EACH STUD AND PLATE, FACE NAIL 2-8d <br />21. 1" x 8" (25 mm x 203 mm) SHEATHING OR LESS TO EACH BEARING, FACE NAIL 3-8d <br />22. WIDER THAN 1" x 8" (25 mm x 203 mm) SHEATHING TO EACH BEARING. FACE NAIL 3-8d <br />23. BUILT-UP CORNER STUDS 16d AT 24" (610 mm) O.C. <br />24. BUILT-UP GIRDER AND BEAMS 20d AT 32" (813 mm) O.C. AT TOP AND BOTTOM <br /> AND STAGGERED 2-20d AT ENDS AND AT EACH SPLICE <br />25. 2" (51 mm) PLANKS 2-16d AT EACH BEARING <br />26. COLLAR TIE TO RAFTER, FACE NAIL 3-10d <br />27. ROOF RAFTER TO HIP. TOE NAIL 3-10d <br />28. ROOF RAFTER TO 2x RIDGE BEAM, TOE NAIL, FACE NAIL 2-16d <br />29. JOIST TO BAND JOIST, FACE NAIL 3-16d <br />30. LEDGER STRIP, FACE NAIL 3-16d <br />31. WOOD STRUCTURAL PANELS AND PARTICLE BOARDb. <br />SUBFLOOR, ROOF AND WALL SHEATHING (TO FRAMING): <br />1/2" (12.7 mm) AND LESS 6dc,l <br />19/32" - 3/4" (15 mm -19 mm) 8dd OR 6de <br />7/8" - 1" (22 mm - 25 mm) 8dc <br />1 1/8" - 1 1/4" (29 mm -32 mm) 10dd OR 8dd <br />COMBINATION SUBFLOOR-UNDERLAYMENT (TO FRAMING): <br />3/4" (19 mm) AND LESS 6de <br />7/8" - 1" (22 mm -25 mm) 8de <br />1 1/8" - 1 1/4" (29 mm -32 mm) 10dd OR 8de <br />32. PANEL SIDING (TO FRAMING): <br />1/2" (12.7 mm) OR LESS 6df <br />5/8" (16mm) 8df <br />33. FIBERBOARD SHEATHINGg: <br />1/2" (12.7 mm) NO. 11 GAh <br />6 d <br /> NO. 16 GAi <br /> 25/32”(20 mm) NO. 11 GAh <br /> 8d <br /> NO. 16 GAi <br />34. INTERIOR PANELING: <br />1/4”(6.4 mm) 4d j <br />3/8" (9.5 mm) 6dk <br />a COMMON OR BOX NAILS MAY BE USED EXCEPT WHERE OTHERWISE STATED. <br />b NAILS SPACED AT 6 INCHES (152 mm) ON CENTER AT EDGES, 12 INCHES (305 mm) AT INTERMEDIATE <br />SUPPORTS EXCEPT 6 INCHES (152 mm )AT ALL SUPPORTS WHERE SPANS ARE 48 INCHES (1219 mm) OR <br />MORE. FOR NAILING OF WOOD STRUCTURAL PANEL AND PARTICLEBOARD DIAPHRAGMS AND SHEAR <br />WALLS, REFER TO SECTION 23 NAILS FOR WALL SHEATHING MAY BE COMMON, BOX OR CASING. <br />c COMMON OR DEFORMED SHANK. <br />d COMMON. <br />e DEFORMED SHANK. <br />f CORROSION-RESISTANT SIDING OR CASING NAILS <br />g FASTENERS SPACED 3 INCHES (76 mm) ON CENTER AT EXTERIOR EDGES AND 6 INCHES (152 mm) ON <br />CENTER AT INTERMEDIATE SUPPORTS. <br />h CORROSION-RESISTANT ROOFING NAILS WITH 7/16 INCH (11 mm) HEAD AND 1 1/2 INCH (38 mm) LENGTH <br />FOR 1/2 INCH (12.7 mm) SHEATHING AND 1 3/4 INCH (44 mm) LENGTH FOR 25/32 INCH (20 mm) SHEATHING. <br />i CORROSION - RESISTANT STAPLES WITH NOMINAL 7/16 INCH (11 mm) CROWN AND 1 1/8 INCH (29 mm) <br />LENGTH FOR <br />1/2 INCH (12.7 mm) SHEATHING AND 1 1/2 INCH (38 mm) LENGTH FOR 25/32 INCH (20 mm) SHEATHING <br />PANEL SUPPORTS AT 16 INCHES (406 mm) [20 INCHES (508 mm) IF STRENGTH AXIS IN THE LONG <br />DIRECTION OF THE PANEL, UNLESS OTHERWISE MARKED]. <br />j CASING OR FINISH NAILS SPACED 6 INCHES (152 mm) ON PANEL EDGES, 12 INCHES (305 mm) AT <br />INTERMEDIATE SUPPORTS. <br />k PANEL SUPPORTS AT 24 INCHES (610 mm). CASING OR FINISH NAILS SPACED 6 INCHES (152 mm) ON <br />PANEL EDGES 12 INCHES (305 mm) AT INTERMEDIATE SUPPORTS. <br />l FOR ROOF SHEATHING APPLICATIONS, 8d NAILS ARE THE MINIMUM REQUIRED FOR WOOD STRUCTURAL <br />PANELS. <br />m STAPLES SHALL HAVE A MINIMUM CROWN WIDTH OF 7/16 INCH. <br />n FOR ROOF SHEATHING APPLICATIONS, FASTENERS SPACED 4 INCHES ON CENTER AT EDGES, 8 INCHES <br />AT INTERMEDIATE SUPPORTS. <br />o FASTENERS SPACED 4 INCHES ON CENTER AT EDGES, 8 INCHES AT INTERMEDIATE SUPPORTS FOR <br />SUBFLOOR AND WALL SHEATHING AND 3 INCHES ON CENTER EDGES, 6 INCHES AT INTERMEDIATE <br />SUPPORTS FOR ROOF SHEATHING. <br />p FASTENERS SPACED 4 INCHES ON CENTER AT EDGES, 8 INCHES AT INTERMEDIATE SUPPORTS. <br />IF LOCAL BUILDING AND SAFETY CODE DIFFERS FROM THE ABOVE SCHEDULE AND NOTES, THEN <br />CONTRACTOR SHALL COMPLY W/LOCAL BUILDING AND SAFETY CODES. <br />PERIODIC SPECIAL INSPECTION IS REQUIRED FOR WOOD SHEAR WALLS, SHEAR PANELS, AND <br />DIAPHRAGMS, INCLUDING NAILING, BOLTING, ANCHORING, AND OTHER FASTENING TO COMPONENTS <br />OF THE SEISMIC FORCE RESISTING SYSTEM. SPECIAL INSPECTION BY A DEPUTY INSPECTOR IS <br />REQUIRED WHERE THE FASTENER SPACING OF THE SHEATHING IS 4 INCHES ON CENTER OR LESS <br />HARDWARE LARR # ICC # <br /> JOIST HANGERS 25800 ESR-2553 <br />25801 ESR-2552 <br />25803 ESR-2615 <br />25804 ESR-2551 <br />25807 ESR-2549 <br /> POST BASE 25985 ESR-3050 <br /> HORIZ. STRAPS 25713 ESR-2105 <br /> POST CAPS 25714 ESR-2604 <br /> HOLDOWNS 25720 ESR-2330 <br /> SIMPSON A35, LTP 25814 ESR-3096 <br /> HURRICANE TIES 25718 ESR-2613 <br /> SIMPSON SET-XP EPOXY 25744 ESR-2508 <br />HARDWARE LARR # ICC # <br /> HARDY FRAME 25759 ESR-2089 <br /> STRONG WALL SSW 26625 ESR-1679 <br /> STRONG WALL SW 25427 ESR-1267 <br /> PARALLAM 25202 ESR-1387 <br /> VERSA-LAM 25998 ESR-1040 <br /> BCI WOOD I JOIST 24999 ESR-1336 <br /> GLASS RAILING 25084 CSI-05520 <br /> REDLAM LVL 25832 ESR-2993 <br /> QUIK DRIVE 25917 ESR-3006 <br /> SD WOOD SCREWS 25910 ESR-3096 <br /> SDW WOOD SCREWS 25906 ER-192 <br /> ANCHOR BOLTS 25827 ESR-2611 <br /> SDS SCREWS 25711 ESR-2236 <br />FOUNDATION REINFORCEMENT <br />DIAPHRAGM AND NAILING <br />FRAMING HARDWARE <br />NAILING AND ANCHORAGE <br />EVGENY NAGOVITSYN <br />323 486-4151 C93527 <br />1506 E Clemensen Ave & <br />#212/12/2024